Demolish and rebuild Richford port of entry for Customs and Border Protection, Vermont
Official title: Construction Services for Richford LPOE, Vermont
Open, 38 days left
- Deadline
- Thursday, December 24, 2026 at 2:00 PM (-05:00)Response deadline for this presolicitation. The record gives a -05:00 offset, not a named time zone.
- Who can bid
- Open to all businesses; no set-aside usedNo set-aside is listed, but the notice states no size, license or other eligibility rules.
- Contract period
- Not stated
- Place of work
- Richford, VT 05476Site of the existing building to be demolished and the new CBP facility to be built.
- How the winner is picked
- Not stated
- How to submit
- Not stated
- Questions due
- Not stated
- Site visit
- Not stated
- Contract type
- Construction; pricing type not statedCovers demolition of the existing building and construction of a new facility. No pricing structure is named.
- Estimated value
- Not stated
- Solicitation number
- 47PB5227R0007
- Buying office
- Pbs Capital Projects - Zones 3 & 4 BranchPublic Buildings Service, General Services Administration
- Industry
- NAICS 236220PSC Y1AZ
- Notice type
- Presolicitation
- Source
- SAM.gov notice
What they're buying
The General Services Administration (GSA) plans to demolish an existing historical building at the Richford port of entry (LPOE) in Richford, Vermont, and construct a new facility for U.S. Customs and Border Protection (CBP). The notice gives no contract length, value or submission method, and no files are attached.
- Demolish the existing historical building on the Richford site.
- Construct a new Customs and Border Protection port facility.
- Furnish labor, equipment, tools, materials, travel, supplies, management and supervision.
- Plan, schedule and coordinate all construction phases to assure effective performance.
- Design to GSA Design Excellence and Operational Excellence 1 guidelines, GSA PBS Core Building Standards and DHS CBP Design Guide.
- Comply with applicable federal, state and local building codes and standards.
What to watch for
necessary to perform all work in accordance with the Statement of Work
Notice text
Notice type: Presolicitation
SAM.gov record
labor, equipment (except as otherwise provided), tools, materials
Notice text
The Contractor shall have full responsibility for all construction related to the project scope.
Notice text
How to respond
- Not stated: the notice does not say how to submit a response, whether by email, portal or mail.
- Check SAM.gov for a formal solicitation, amendments or attachments, since none are attached to this notice.
- Before 2:00 PM (-05:00) on Thursday, December 24, 2026, ask the agency in writing for the Statement of Work and the equipment it will provide. The record gives no contact name.
Not stated in what we read
- Estimated value or budget for the project.
- Contract length, schedule and completion dates.
- Statement of Work, drawings or specifications; none are attached.
- Whether a response is a formal bid or an interest form, and what it must include.
- How and where to submit a response, and any page or format limits.
- Whether a solicitation will be issued, and when.
- Award basis and how responses will be judged.
- Pricing structure, such as fixed price, and any wage or payment terms.
- Licenses, bonding, insurance, security clearance or other eligibility requirements.
- Whether a site visit or pre-bid meeting is required.
- Deadline for questions.
- Which equipment the government provides.
- Whether historic preservation or salvage rules apply to demolishing the existing building.
- Whether the GSA and CBP design guides cited are needed; they are not attached.
- Contact name and email for the contracting office.
Notice text
As published on SAM.gov. Highlights match the notes above.
This project will demolish the existing historical building and construct a new facility to meet the mission of Customs and Border Protection (CBP). The new port will adhere to the GSA Design Excellence and Operational Excellence 1 GSA PBS Office of Acquisition Management guidelines, the GSA PBS Core Building Standards, and the U.S. Department of Homeland Security (DHS) CBP Design Guide.
The Contractor shall furnish all construction services, labor, equipment (except as otherwise provided), tools, materials, travel, supplies, management and supervision necessary to perform all work in accordance with the Statement of Work, and must plan, schedule, coordinate and assure effective performance of all services needed during the construction phases. All work performed and all materials provided under this contract shall comply with and/or shall be with knowledge and forethought of applicable federal, state and local building codes based on the requirements of the current edition of recognized and acceptable building standards, codes and regulations.
The Contractor shall have full responsibility for all construction related to the project scope.