Gravel Pulverization Services for U.S. Consulate Karachi Grounds, Pakistan
Official title: 19PK4027Q5001 Gravel Pulverization Services
Open, 6 days left
- Deadline
- Monday, November 23, 2026, 15:00 Pakistan standard time (+05:00)Quotes received after this time are not accepted.
- Who can bid
- Not statedNo set-aside is listed. Offerors must meet the Section 3 qualifications, including three years of similar civil work.
- Contract period
- 45 calendar days after notice to proceedThe RFQ also says the contract will be for one year. The Q&A answer says 45 days after award and notice to proceed.
- Place of work
- Karachi, Pakistan, on the U.S. Consulate General groundsAddress: New TPX Area, Plot 3-5, Mai Kolachi, Karachi.
- How the winner is picked
- Lowest price among acceptable, responsible offersAward is planned on initial quotes without discussions, although discussions are possible.
- How to submit
- Email PDF files to Krcprocurementcontracting@state.govEach file must be under 30MB. Split larger submissions into separate emails.
- Questions due
- Passed. COB 09 November 2026 per notice textThe RFQ letter says COB 05 November 2026. Both dates are before today.
- Site visit
- Passed. November 4, 2026 per notice text; October 28, 2026 per RFQOnly two people per firm could attend. The text does not say attendance was required.
- Contract type
- Firm fixed-price services contract, paid on accepted workThe notice says a fixed price per visit. The Q&A says one firm fixed price for work accepted.
- Estimated value
- Not statedThe price blanks are not filled in. The job is about 950 cubic meters, or 1,500 metric tons, of gravel.
- Solicitation number
- 19PK4027Q5001
- Buying office
- American Consulate KarachiState, Department of, Department of State
- Industry
- NAICS 423320PSC Z2PZ
- Notice type
- Combined Synopsis/Solicitation
- Source
- SAM.gov notice
What they're buying
The U.S. Consulate General in Karachi wants a contractor to scrape about 950 cubic meters of gravel from its grounds, crush it with an electric crusher and operator, and relay it about 3 inches thick over roughly 131,000 square feet. The work is priced as one firm fixed price in Pakistani rupees, with performance of 45 calendar days after award and notice to proceed.
- Scrape the approximately 3-inch gravel layer from about 131,000 square feet, about 950 cubic meters or 1,500 metric tons, and haul it to the crushing area.
- Protect the approximately 4,440 square feet of 2mm weed barrier fabric; replace any damaged fabric at your own cost.
- Provide an electric, three-phase stone crusher with operator, motor up to 25 HP, feeding at least 20 cubic meters per day, producing stone 1/2 inch or smaller.
- Lay the crushed stone about 3 inches thick over the full area and haul material back as the COR directs.
- Supply manual labor, at least six wheelbarrows, shovels, compactors, a mule or gator, an 800cc pickup, and up to 15 helpers.
- Follow EM-385 safety rules, supply PPE, keep a qualified site supervisor, and pass COR inspection hold points.
What to watch for
The Consulate intends to conduct a pre-quotation site visit on November 4, 2026, at 11:00am
Notice text
The contract will be for one year firm fixed Price
RFQ 19PK4027Q5001 Gravel Pulverization Services.pdf, page 6
Electric motor to be upto 25 HP, three phase.
RFQ 19PK4027Q5001 - QA Responses.pdf, page 2
No, additional stone supply is not part of this contract.
RFQ 19PK4027Q5001 - QA Responses.pdf, page 2
The Contractor assumes absolute responsibility and liability for any and all personal injuries or death
RFQ 19PK4027Q5001 Gravel Pulverization Services.pdf, page 16
Must demonstrate at least Three (03)-years of experience in completing similar civil work contracts
RFQ 19PK4027Q5001 Gravel Pulverization Services.pdf, page 35
How to respond
- Email your quotation as PDF files to Krcprocurementcontracting@state.gov by Monday, November 23, 2026, 15:00 Pakistan standard time. Late quotes are not accepted.
- Volume I: the SF-1449 with the pricing table in PKR, Section 5 representations and certifications, and proof of SAM registration. The notice text omits SAM proof, but the RFQ letter requires it.
- Volume II: a work plan, a Gantt chart, and a technical proposal in two parts covering methods, experience and past performance, staffing, equipment, audited financial statements, an insurance cover note, and affidavits.
- Keep each PDF under 30MB. If the files are larger, split them into separate emails of less than 30MB each. Write in English only, because incomplete offers are not accepted.
- Fill in the optional services rates on page 8 for crushed stone per ton, crusher rental per day, and helper labor per shift. These matter if extra stone is needed.
Documents
- SF30_RFQ 19PK4027Q5001 Gravel Pulverization Services.pdfPDFProbably an SF-30 form, judging by the name. It is a scanned image with no text we could read, so we could not review it and you must read it yourself on SAM.gov. Not reviewed: scanned image, no text could be extracted.
- RFQ 19PK4027Q5001 - QA Responses.pdfPDFGovernment answers to bidder questions that change the performance period, scraping method, payment basis, crusher and power terms, and stone shortfall. Read it in full before you price.
- RFQ 19PK4027Q5001 Gravel Pulverization Services.pdfPDFThe full request for quotations with the scope, pricing table, clauses, and instructions. You must complete the SF-1449, the pricing section, and the Section 5 representations and certifications.
Not stated in what we read
- Total price and estimated contract value, since the price blanks are not filled in.
- Whether a set-aside applies, because the SF-1449 set-aside boxes are not clearly marked in the text.
- Which dates govern, the notice text or the RFQ letter, and whether a formal amendment exists on SAM.gov.
- The reference crusher image and full specifications; the Q&A says one bidder did not receive the image.
- Voltage, frequency, and amperage of the power supply; only the 25 HP limit is given.
- Optional rates for crushed stone, crusher rental, and helper labor, which are blank.
- Minimum insurance amounts and required liability limits.
- Whether the 2 percent excise tax withholding applies to you, which depends on whether you are a foreign person.
- What data the RAM personnel vetting requires beyond DS Form 4184, and how quickly you must provide it.
- Current or incumbent contractor, and whether this work has been bid before.
Notice text
As published on SAM.gov. Highlights match the notes above.
Enclosed is a Request for Quotations (RFQ) for Gravel Pulverization Services. If you would like to submit a quotation, follow the instructions in Section 3 & 4 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on Standard Form 1449 that follows this letter. The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.
The Consulate intends to conduct a pre-quotation site visit on November 4, 2026, at 11:00am (Pakistan standard time). Offerors interested in attending must e-mail: KRCprocurementContracting@state.gov below details on or before Friday October 30, 2026, 15:00Hrs. Full name/s CNIC/s Vehicle make Vehicle model Vehicle color Vehicle registration # Cell/phone contact# Only two persons from each firm may participate in the pre-proposal site visit. Following the site visit all relevant questions must be submitted no later than COB 09 November 2026 Quotations are due by November 23, 2026, 15:00Hrs (Pakistan standard time). No quotations will be accepted after this time.
Proposals must be in English and incomplete proposals will not be accepted. Bids must be submitted electronically to Krcprocurementcontracting@state.gov. It is important to make sure the submission is made in Adobe Acrobat (pdf) file format not to exceed 30MB. If the file size should exceed 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each. For a quotation to be considered, you must also complete and submit the following: 1. SF-1449 2. Section I, Pricing 3. Section 5 Representations and Certifications 4. Additional information as required in Section 3