Mold removal and cleanup at Merritt Island refuge fire office, Titusville Florida
Official title: F--Mold remediation, Merritt Island NWR
Open, 8 days left
- Deadline
- Tuesday, November 24, 2026, 2:00pm EDTSet by Amendment 0005. SAM record shows 2026-11-24T14:00:00-05:00.
- Who can bid
- Small businesses only (100% small business set-aside)NAICS 562910, size standard $25 million. You must have an active SAM registration.
- Contract period
- Award through September 30, 2027The purchase form lists a period starting 11/01/2026, which is probably before award.
- Place of work
- Merritt Island NWR Fire Office, Titusville, FLThe SAM record shows place of performance as Not stated. The PWS gives this address.
- How the winner is picked
- Lowest price technically acceptable (LPTA)Your quote must first pass technical review. Only firm fixed price offers are evaluated.
- How to submit
- Email to Fred Riley at fred_riley@ios.doi.govSubject line: Quote Submission 140FF027Q0053
- Questions due
- Friday, November 13, 2026, 2:00pm EDT (passed)Questions were due by this date. The question window is closed.
- Site visit
- November 12 at 9am Est (passed)Notice says optional. The PWS says mandatory. See catches.
- Contract type
- Firm fixed priceEscalation or sliding price makes an offer non-conforming.
- Estimated value
- Not stated
- Solicitation number
- 140FF027Q0053
- Buying office
- Fws Contracting ActivityDepartmental Offices, Interior, Department of the
- Industry
- NAICS 562910PSC F108
- Notice type
- Combined Synopsis/Solicitation
- Source
- SAM.gov notice
What they're buying
The Fire Office at Merritt Island National Wildlife Refuge in Titusville, Florida needs mold removal and cleanup, including wall, attic and HVAC work, drying, and clearance testing. It is a firm fixed price contract from award through September 30, 2027, open only to small businesses.
- Remove drywall and insulation along the full north walls of the East and West Offices, floor to ceiling, and continue at least 24 inches beyond visible growth.
- Remove drywall and insulation on the West Office west wall from the floor to 24 inches high, plus at least 24 inches beyond visible growth.
- Set up attic containment, remove contaminated attic insulation, and HEPA clean and treat retained roof decking, rafters and joists. Roof-deck replacement is excluded.
- Remove the contaminated flex-duct branch serving the conference room, clean registers and grilles, and professionally clean the air-handler interior.
- Run dehumidification to keep indoor relative humidity at or below 55 percent, with 72 continuous hours at or below 55 percent before clearance testing.
- Maintain containment with 6-mil polyethylene, negative air with HEPA filtration, daily reports, disposal manifests within three business days, and a final remediation report within five business days after clearance.
What to watch for
Closing extended to Tuesday, November 24, 2026,
Sol_140FF027Q0053_Amd_0005.pdf, page 2
A mandatory pre-proposal site visit is required.
Attachment_1-_Performance_Work_Statement_rev1_0001.pdf, page 2
trade-offs are not permitted
Sol_140FF027Q0053.pdf, page 13
The Government has not performed a detailed quantity takeoff.
Attachment_1-_Performance_Work_Statement_rev1_0001.pdf, page 2
Offerors shall not include asbestos inspection, testing, or abatement in their proposed prices.
Sol_140FF027Q0053_Amd_0002.pdf, page 3
should carry its own pollution-liability coverage at the same limits
Sol_140FF027Q0053_Amd_0003.pdf, page 5
How to respond
- Confirm your SAM.gov registration is active and that you qualify as a small business under NAICS 562910, with a $25 million size standard. Confirm you hold or can get the Florida mold-remediator license the PWS requires.
- Price Attachment 3 Quote Schedule Corrected 0001 with one lump sum for each of Tasks 6.1 to 6.7 and the Final Contractor Remediation Report, plus a total. Do not add escalation.
- Prepare your technical approach in no more than 10 pages, key personnel and subcontractor information in no more than 10 pages, and Attachment 5 past performance for up to three contracts completed in the past three years.
- Complete the Instructions to Offerors addendum and SF 1449 blocks 12, 17, 23, 24 and 30, and acknowledge all amendments. A missing required document makes the quote non-responsive.
- Email the complete quote to fred_riley@ios.doi.gov with the subject line Quote Submission 140FF027Q0053 by Tuesday, November 24, 2026, 2:00pm EDT. File format and size limits: Not stated.
Documents
- Attachment_3-Quote_Schedule.docxDOCXProbably the earlier quote schedule, replaced by the corrected version. We could not review it, so check it on SAM.gov and use the corrected version. Not reviewed: replaced by a newer version ("Attachment_3-Quote_Schedule_-_Corrected_0001.docx").
- Attachment_1-_Performance_Work_Statement.pdfPDFProbably the earlier statement of work, replaced by revision 1. We could not review it, so check it on SAM.gov and use revision 1. Not reviewed: replaced by a newer version ("Attachment_1-_Performance_Work_Statement_rev1_0001.pdf").
- Attachment_4-_SCA_Wage_Determination.pdfPDFThe notice lists this as the Service Contract Act wage determination. We could not review it. You must read it and price labor to it. Not reviewed: too long for this summary.
- Attachment_5-_Past_Performance_Data_Document.docxDOCXA questionnaire you must fill in and submit with your quote for up to three recent contracts and your business details.
- Sol_140FF027Q0053_Amd_0001.pdfPDFAmendment 0001 changed the statement of work and kept the November 16 closing, and it states the site visit is not mandatory. Read it and acknowledge receipt in your quote.
- Attachment_2-_Mold_Assessment_Report.pdfPDFThe Bio Pro mold assessment and remediation protocol dated May 22, 2026. It is for reading only, and we reviewed only part of it because the text was truncated. Read the full report on SAM.gov.
- Attachment_3-Quote_Schedule_-_Corrected_0001.docxDOCXThe corrected quote schedule. You must enter a price for each task and the total, and it is the form you price against.
- Attachment_1-_Performance_Work_Statement_rev1_0001.pdfPDFThe current statement of work. It is for reading only and defines the scope you must price, including what is excluded.
- Sol_140FF027Q0053_Amd_0003.pdfPDFAmendment 0003 answers questions on asbestos, insurance limits, window repairs, weatherproofing and pollution liability. It is for reading, and it sets the insurance limits you must meet.
- Sol_140FF027Q0053.pdfPDFThe main solicitation with the purchase form, clauses, instructions to offerors and representations. You must read it, complete the required blocks and representations, and sign where required.
- Sol_140FF027Q0053_Amd_0004.pdfPDFAmendment 0004 adds insurance clause 52.228-5 and repeats earlier answers, plus a new answer on subcontractor insurance. It is for reading, and you must meet the insurance terms it sets.
- Sol_140FF027Q0053_Amd_0002.pdfPDFAmendment 0002 adds the 2012 asbestos survey reference and answers early questions on asbestos and pricing. It is for reading, and it confirms you must not price asbestos work.
- Sol_140FF027Q0053_Amd_0005.pdfPDFAmendment 0005 moves the closing to Tuesday, November 24, 2026 at 2:00pm. It is for reading, and you must acknowledge receipt in your quote.
- Attachment_6-_2012_Comprehensive_Asbestos_survey_0002.pdfPDFProbably the 2012 comprehensive asbestos survey for the building. It is a scanned image we could not read. You must read it on SAM.gov before pricing. Not reviewed: scanned image, no text could be extracted.
Not stated in what we read
- Estimated value or budget: Not stated.
- Whether the November 12 site visit is still required, and whether skipping it makes a quote ineligible.
- Contents of the 2012 asbestos survey and the results of the supplemental asbestos inspection.
- Normal work hours: the PWS shows a blank [CO INSERT] field.
- Whether the 11/01/2026 start date in the purchase form still applies, since award comes later.
- Number of days to finish remediation: Not stated. Only the end date of September 30, 2027 is given.
- Whether electricity and water will be available for use, as the PWS says only where available and approved by the COR.
- Staging and storage areas for Government contents: Not stated.
- Whether any further amendment will be issued before the closing date.
Notice text
As published on SAM.gov. Highlights match the notes above.
This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. U.S. Fish and Wildlife Service is issuing a Request for Quotes for the Mold Remediation at the Merritt Island NWR, FL. The anticipated performance period is shown below. Period of Performance:
Contract award � September 30, 2027 Solicitation 140FF027Q0053 is issued as a Request for Quotation (RFQ) is 100% Small Business Set Aside and is conducted under FAR Parts 12 and 13, incorporating provisions and clauses in effect through Federal Acquisition Circular FAC Number: 2026-01, Effective Date: 03/13/2026. The applicable North American Classification System (NAICS) code is 562910, Remediation Services. The small business size standard is $25 Million. Terms & Conditions:
Any additional contract requirement(s) or terms and conditions determined by the contracting officer to be necessary for this acquisition and consistent with customary commercial practices are attached included in the Attachment Solicitation-provisions and clauses- 140FF027Q0053. The full text of the referenced FAR clauses may be accessed electronically at https://www.acquisition.gov/far/ or see terms & conditions attached to the solicitation. In order to be eligible for award, all contractors must have an Active Registration in the System for Award Management (SAM) website https://sam.gov/content/home. Please note, SAM is a free website and there is never a cost to register your entity.
Prior to or following receipt of an award, the Contractor must register with the U.S. Department of the Treasury's Invoice Processing Platform System (IPP) to submit requests for payment. Please note, IPP is a free website and there is never a cost to complete registration. Invoices for services will be paid after the end of the month of service, advanced payments are not allowed. Instructions For all Instructions to Offerors please reference Attachments 1-5. Important Submission Dates & Site Visit Info: 1. Site Inspection:
Prior to submitting a quote, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. A site visit is scheduled for November 12th at 9am Est. Meeting location is 1963 Refuge Headquarters Road, Titusville, FL. Please contact the Site POC Keith Ramos at Keith_ramos@fws.gov or 321-861-2278 in regards to a site visit. SITE VISIT IS NOT MANDATORY BUT HIGHLY ENCOURAGED. 2. Question Submission:
All questions regarding this Solicitation must be submitted in writing to the Contract Specialist, Fred Riley at Fred_riley@ios.doi.gov no later than Friday, November 13, 2026, at 2:00pm EDT. If necessary, questions received will be answered through an Amendment to this Solicitation. Emails must indicate the following in the subject line: Question Submission for 140FF027Q0053. 3. Quote Submission: Quotes (including all required documents) must be transmitted via e-mail to the Contract Specialist, Fred Riley at fred_riley@ios.doi.gov, no later than Tuesday, November 24, 2026, at 2:00pm EDT. Emails must indicate the following in the subject line: Quote Submission 140FF027Q0053.
Required Submittal Documents: Offerors responding to this solicitation must submit the following documents: - See Attachment 1- Solicitation- provisions_and_clauses-_FF027Q0053- ADDENDUM TO 52.212-1, INSTRUCTIONS TO OFFERORS Complete the attached document or your own version that addresses each element. Your quote will be considered non-responsive and will not be considered if all the above required documents are not completed in full and received as part of your submittal package.
An award will be made to the Contractor whose submittal documents conform to the requirements as described in this solicitation and who, based on a subjective assessment from the Government, offers the lowest price technically acceptable (LPTA). The Government reserves the right to award a contract to other than the lowest priced offer if, in its judgment, the offeror�s submission fails to meet the specified technical requirements or does not demonstrate compliance with the solicitation�s requirements. Award will be based on the Government�s evaluation of both price and technical acceptability. CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS See attached documents:
ATTACHMENT 1 Performance Work Statement ATTACHMENT 2 Mold Assessment Report ATTACHMENT 3 Quote Schedule ATTACHMENT 4 SCA Wage Determination ATTACHMENT 5 Past Performance Questionnaire Contracting Officer/Office: Fred Riley, Contract Specialist U.S. Fish & Wildlife Service Hadley, MA Joint Administrative Operations (JAO) fred_riley@ios.doi.gov