1. Contracts ending soon
  2. Federal Railroad Administration

Federal Railroad Administration contracts ending soon

Department of Transportation

80 contracts of $100,000 or more at Federal Railroad Administration end in the next 18 months, with $15M obligated so far. 17 end within six months, so their follow-on may already be in the works.

Ending in 18 months
80 contracts$15M obligated so far
Biggest holder
Ensco Inc$92.3M on 20 contracts ending soon
Source
USAspending.govUpdated Nov 17, 2026, 7:37 PM UTC

Contracts ending soon

Soonest end first. Each contract links to its record on USAspending.gov.

ContractObligatedEndsState
The Purpose of This Requirement Is to Complete Research Conducted on the Project Entitled "non-Contact Rail Inspection at Track Speed." Continue the Ongoing Development of the Non-Contact High-Speed…University of California, San Diego · 693JJ625P000016$244,364Nov 21, 2026within a monthCA
To Provide Support to Positive Train Control (Ptc) Implementation Program Activities in the Areas of Program Management and Strategy, Data Management and Visualization, Technical Document Review to…Deloitte Consulting Llp · 693JJ622F00033N$5,192,394Nov 27, 2026within a monthVA
Conduct 800KIP Compression Test of Arrow III Vehicle to Validate Previously Developed Finite Element Models.Ensco Inc · 693JJ625F00026N$814,560Dec 4, 2026within a monthCO
As Part of the Consolidation of the DOT Workforce, DOT HQ Requires a Reconfiguration of Their Office Space. As a Result, Fra Requires 191 Wardrobes and 246 Sit to Stand Legs.Aleto, Inc. · 693JJ626F00008N$472,162Dec 31, 2026in 1 monthVA
Baa Project by Ara to Evaluate the Impact and Puncture Safety of Transporting Liquid Hydrogen (LH2) by Rail in Tank Cars, Iso T75 Tank Containers, or Fuel Tenders.Applied Research Associates, Inc. · 693JJ625C000004$129,109Feb 4, 2027in 2 monthsNM
The Ongoing Phase I of This Project (Ending on November 7, 2022) Produced and Established a Proof of Concept for the Necessary Technology for Freight and Passenger Trains With a Special Focus on…University of Maryland, College Park · 693JJ623C000012$560,000Feb 23, 2027in 3 monthsDC
To Contract for Fra Records Management Support Services for Inventorying and Disposing Paper Records to Comply With Omb M-23-07 Mandate.Lbo Technology LLC · 693JJ624P000023$783,264Feb 27, 2027in 3 monthsVA
The Contractor Will Be Providing Architectural and Engineering Services to Fra As the Ahj to Ensure Code Compliance in All Projects in Washington Union Station Overseeing the Project Development…Institute for Building Technology and Safety · 693JJ626F00004N$1,894,455Feb 28, 2027in 3 monthsVA
The Purpose of This Program Management Office (Pmo) Support Contract Is to Provide Support in Monitoring and Evaluating of Activities Relating to the Current Ttc Contract and Support the Cor in the…Marvel Consulting LLC · 693JJ623P000021$1,203,741Mar 20, 2027in 4 monthsDC
A Demonstration Test of Clear Path Detection and Ranging, Based on Railroad-Specific Use Cases, Will Help the North American Freight Railroad Industry Determine the Applicability and Suitability of…Transportation Technology Center, Inc. · 693JJ625C000008$532,890Mar 23, 2027in 4 monthsCO
The Purpose of the Work Is to Support the Full-Scale Testing Program. This Program Will Include One Full-Scale Dynamic Test of a Tank Car With Components Added for Puncture Protection.Ensco Inc · 693JJ622F00034N$1,786,583Mar 25, 2027in 4 monthsCO
The Purpose of This Stand-Alone Contract Is to Provide Funding for the Research and Development of an Innovative Algorithm Development to Identify Derailment Risks Using Rail Profiles and Track…Sharma & Associates Inc · 693JJ625C000006$299,010Mar 28, 2027in 4 monthsIL
The Government Has a Need for Contracted Services Supporting the Automated Track Inspection Program (Atip). Atip Provides Guidance and Understanding Regarding on-Track Safety Requirements, Geometry…Ensco Inc · 693JJ623C000003$75,635,688Mar 31, 2027in 4 monthsVA
The Government Has a Need for Contracted Services Supporting the Automated Track Inspection Program (Atip). Atip Provides Guidance and Understanding Regarding on-Track Safety Requirements, Geometry…Tetra Tech Railai Inc · 693JJ623C000004$9,807,587Mar 31, 2027in 4 monthsFL
The Federal Railroad Administration (Fra) Seeks Program Development Services in Support of It's Rail Information Sharing Environment (Rise) From an Organization With Expertise in Building and…The Mitre Corporation · 693JJ626C000001$991,715Mar 31, 2027in 4 monthsVA
Wheel and Rail Contact Roller Rig RedesignVirginia Polytechnic Institute & State University · 693JJ624C000045$499,988Mar 31, 2027in 4 monthsVA
Research Initiatives in Support of Rail Safety Topic: Fra-Rs-002 Aabm Advanced Acoustic Bearing MonitorInternational Electronic Machines Corporation · 693JJ624C000037$453,305Apr 27, 2027in 5 monthsNY
Award: Build 10 Aim Rail Enhanced Probes for Fra Inspector Beta Testing and Data Collection.Oceanit Laboratories Inc · 693JJ626P000002$210,000May 19, 2027in 6 monthsHI
The Purpose of This Order Is to Procure Paralegal/Administrative and Foia Professional Services.Rikka Law Pllc · 693JJ626F00013N$237,936May 28, 2027in 6 monthsDC
Task Order Contractor Teaming Arrangement (Cta) With Professional Vets Consulting Group (Dba Pro Vets Consulting Group) and Procurement Advisors LLC (Dba Fp&C Consulting) for Grant Support Services…Professional Vets Consulting Group, LLC · 693JJ624F00060N$824,360May 31, 2027in 6 monthsVA
Conduct Test and Data Collection for the Clear Path & Ranging Project at Ttc.Ensco Inc · 693JJ626F00014N$304,512Jun 1, 2027in 6 monthsCO
Award: Fra Security Assessment & Authorization/Authority to Operate (Ato)Spry Methods, Inc. · 693JJ624F00068N$2,045,149Jun 25, 2027in 7 monthsVA
Fra Business Operations Support for Rad, Roa, Rrd, and RrsDynamic Government Resources 2 LLC · 693JJ626F00019N$1,493,630Jun 30, 2027in 7 monthsDC
The Purpose of This Project Is to Perform Transmission Line Maintenance and Pole Replacement on the High-Power Electrical Line at Ttc. These Thirteen (13) Transmission Poles Were Identified for…Main Electric, Ltd. · 693JJ626P000003$372,912Jun 30, 2027in 7 monthsCO
Install a New, High-Capacity Fire Protection System (3,000 Gpm at 125 Psi), a New Fire Pump Controller With Soft Start Full-Speed Operation and an Across-the-Line Bypass, and a New Pressure Relief…Corsentino Construction, Inc. · 693JJ626P000004$480,107Jul 1, 2027in 7 monthsCO
The Purpose of This Task Order Is to Allocate Funds for the Purchase of a Learning Management System (Lms) License to Support the Training of Both Ttsd and Rrd. This Is a Brand Name Purchase for…Four LLC · 693JJ625F00027N$303,517Jul 13, 2027in 7 monthsVA
Construct the Curved Perturbation Slab Track at TtcEnsco Inc · 693JJ626F00020N$500,000Jul 19, 2027in 8 monthsCO
The Objective of This Task Is to Provide Funding Necessary for the Operations, Maintenance, Repair and Upgrades Support While the Test Vehicles Are Used by Ordt and Rpd on an As Needed Basis.Ensco Inc · 693JJ625F00018N$699,998Jul 22, 2027in 8 monthsCO
Broad Agency Announcement (Baa) Contract Is to Develop an Upgraded Detail Fracture Model Based on the Recent Conclusions of the Rail Integrity Research.Thornton Tomasetti, Inc. · 693JJ624C000013$450,002Jul 31, 2027in 8 monthsNY
The Objective of This Contract Is to Secure Expert Electrical Engineering Professional Services (With a Professional Engineer (Pe) Licensed in the State of Colorado) to Provide Technical Engineering…Schendt Engineering Corporation, Inc. · 693JJ626P000007$259,000Aug 4, 2027in 8 monthsCO
The Purpose of This Contract Is to Provide Very Long Train (Vlt) Collaboration Study Follow-on and to Evaluate Safety and Performance of Vlt Under an Extended Set of Operating ConditionsSharma & Associates Inc · 693JJ624C000028$737,800Aug 6, 2027in 8 monthsCO
Baa Project With Vtech Cmcc, Seeking Development of a Computer Program Rsq to Signal Adverse Contact Conditions, I.e., Model Development to Detect Unfavorable Vti Conditions Using Rail Profiles and…Vtech B.v. · 693JJ625C000003$358,400Aug 6, 2027in 8 monthsNot stated
The Purpose of This Task Order Is to Purchase Business Process Improvement Support Services; Assist in Strategic Planning Efforts for Business Process Improvement Efforts to Support Rrd's Mission…Rios Partners, LLC · 693JJ625F00017N$2,575,474Aug 20, 2027in 9 monthsVA
The Objective of This Contract Is to Secure Expert Engineering Professional Services for Water Resources (Requiring a Professional Engineer (Pe) Licensed in the State of Colorado) to Provide…Wright Water Engineers, Inc. · 693JJ626P000010$158,700Aug 23, 2027in 9 monthsCO
The Objective of This Task Is to Provide Support for the Introduction of New Track Inspection Technologies As Well As the Advancement of Existing Technologies With a Focus on System Integration…Ensco Inc · 693JJ625F00024N$1,199,965Aug 26, 2027in 9 monthsCO
The Contractor Shall Provide the Federal Railroad Administration With Advanced Radiographic Inspection of Rail Welds in Accordance With University of Tennessee(Ut) Proposal Dated May 1, 2024.University of Tennessee · 693JJ625C000005$468,000Aug 27, 2027in 9 monthsTN
Research to Provide Tank Car Rollover Test at the Transportation Technology Center.Sharma & Associates Inc · 693JJ624F00045N$412,300Aug 27, 2027in 9 monthsCO
Complete Upgrade of Two Non-Functioning Active Grade Crossing Protection Systems at Ttc.Ensco Inc · 693JJ626F00026N$724,873Aug 30, 2027in 9 monthsCO
The Objectives of the Research Project Are to Evaluate the Efficacy of New Emerging Fire Suppression/Extinguishing Technologies for Rail Applications, and Human Factors Impact on Effectiveness of…Ensco Inc · 693JJ625F00030N$620,663Sep 10, 2027in 9 monthsCO
Provide Support to University- and Third-Party-Led Research Initiatives for Controlled Testing in a "real-World" Setting at Ttc for New and Emerging Technologies.Ensco Inc · 693JJ625F00031N$304,999Sep 11, 2027in 9 monthsCO
The Baa Contractor Shall Provide the DOT/Fra With Research and Development Concept Entitled, "measure Longitudinal Rail Stress Using a Self-Referenced Ultrasonic Wave Method Based on Acoustoelastic…Board of Regents of the University of Nebraska · 693JJ624C000039$489,364Sep 12, 2027in 9 monthsNE
The Scope of the Research Part of This Project Will Include the Application of Ai/Ml, Simulation and Safety Statistical Modeling in Railroad Transportation. the Educational Scope Will Include the…Tennessee State University · 693JJ622C000035$499,965Sep 15, 2027in 9 monthsDC
Archibus - a Services Contract to Provide Software Licenses, Ongoing Application Support and Administration, and Enhancements for Fras Facilities, Assets, and Space Management (Fasm) System That Is…Dlt Solutions, LLC · 693JJ623F00050N$738,711Sep 16, 2027in 9 monthsDC
Fra Baa 2023-Tr-006 - Track Lateral Stability Assessment Under Climate Change and Extreme Weather Conditions.University of South Carolina · 693JJ624C000044$485,000Sep 17, 2027in 10 monthsCO
1. Support Ongoing Collection of Lidar Point Cloud Scans at Grade Crossing Through Partnership With the Fra Office of Safety Automated Track Inspection Program (Atip). 2. Support Efforts of Fra…Ensco Inc · 693JJ624F00067N$808,960Sep 18, 2027in 10 monthsCO
The Office of Facilities and Asset Management Requires Program Analyst Support Services.Financial & Realty Services, LLC · 693JJ624F00066N$1,577,135Sep 20, 2027in 10 monthsMD
The Primary Objective Is to Acquire Average Annual Daily Traffic for Active at Grade Crossings Across the United States. This Data Is the Key Driver of Risk Exposure at Highway-Rail Grade Crossings.Urban Sdk, Inc · 693JJ626F00035N$150,000Sep 23, 2027in 10 monthsFL
This Is a Firm-Fixed Price Order - 693JJ624F00057N to Provide the Federal Railroad Administration (Fra) Office of Human Resources (Hr) Hr Support Services for One Base Period (25 September 2024 - 24…R3 Government Solutions, LLC · 693JJ624F00057N$2,744,449Sep 24, 2027in 10 monthsVA
The Federal Railroad Administration (Fra) Is Requesting Services for a Contractor to Provide a Facilities Condition Assessment (Fca) for Both Building and Non-Building Assets at the Transportation…Ises Corporation · 693JJ626F00036N$314,804Sep 24, 2027in 10 monthsCO
Support for Collaborative Research on Wheel/Rail Interface Research Thru Nrc's Icri Initiative.National Research Council Canada · 693JJ624C000046$600,000Sep 25, 2027in 10 monthsNot stated
Managed Services for Onsite Administrative and Logistical Support at the Transportation Technology Center.Puyenpa Technologies, LLC · 693JJ623P000018$1,174,653Sep 28, 2027in 10 monthsCO
RAD30 Support Services in the Following Areas: Acquisition System Administration, Contract Closeout, and Implementation of Strategic Acquisition Policy and Initiatives.Cment - Jefferson Solutions, LLC · 693JJ624P000024$2,595,166Sep 29, 2027in 10 monthsVA
This Contract Is Issued to Provide Funding for Research and Development to Continue to Support and Upgrade the Gpr System on the Dotx 220. This Project Covers Additional Data Reports and Analysis.Rhomberg Sersa USA Inc · 693JJ625C000007$977,800Sep 29, 2027in 10 monthsFL
The Objective of This Task Is to Provide General Equipment/Infrastructure-Related Support to Enable the Fra to Sustain a State-of-the-Art Facility for Research, Testing, and Training, As Well As…Ensco Inc · 693JJ623F00049N$2,223,004Sep 30, 2027in 10 monthsVA
With the Planned Increase in High-Speed Rail Corridors in the United States, There Is a Growing Need for Facilities to Help Modeling, Model Validation and Qualification of New Equipment and…Ensco Inc · 693JJ625F00032N$749,996Sep 30, 2027in 10 monthsCO
The Primary Objective of the Proposed Research Is to Continue the on-Going Effort on Rail Integrity and Achieve Higher Reliability of Nde Inspection/Procedures for Complete Rail Flaw Detection and…Ensco Inc · 693JJ624F00041N$579,210Sep 30, 2027in 10 monthsCO
Ttc Administration Support Under Contract 693JJ6-21-D-000001Ensco Inc · 693JJ622F00026N$362,122Sep 30, 2027in 10 monthsVA
Improve Rail Safety Through Innovation by Updating Rail Stress Adjustment Practices Through the Assessment of Longitudinal Rail Stress at Critical Locations (E.g., Fixed Structures). Assessing the…University of Illinois · 693JJ626C000034$273,003Oct 14, 2027in 10 monthsIL
Improve Rail Safety by Developing a Framework to Assess the Condition, Stress State, and Risk Associated With Railway Curves. Curves Are Known Locations of Increased Lateral Track Loading Demands…University of Illinois · 693JJ626C000036$252,864Oct 14, 2027in 10 monthsIL
Develop and Demonstrate Communication Standards to Communicate Ptc-Enforceable Information From Wayside Defect Detectors.Transportation Technology Center, Inc. · 693JJ626C000003$499,463Nov 12, 2027in 11 monthsCO
The Purpose of This Task Order Is to Provide Methodology to Use Ttc Equipment and Test Track to Measure Vehicle Parameters That Can Be Used to Create a Validated Vehicle Model to Be Used for…Ensco Inc · 693JJ623F00017N$2,091,734Nov 30, 2027in 12 monthsCO
This Project Will Focus on the Acquisition of Remote Control Switching Controls and Research the Safety and Efficacy of the Automated Systems. Focus Will Be on Human Factors Issues to Design…Ensco Inc · 693JJ626F00011N$950,000Dec 1, 2027in 12 monthsCO
Update and Development of a Parametric Capacity Tool. a Parametric Railroad Capacity Model Is a High-Level Sketch Planning Tool to Assess Potential Infrastructure Needs of a Railroad Corridor Under…Oliver Wyman, LLC · 693JJ626C000012$744,000Dec 3, 2027in 12 monthsTX
The Objective of Phase V Is to Build on Prior-Phase Findings by Expanding Thermal-Mechanical Fea and Fracture-Mechanics Analyses and by Performing Targeted Laboratory Testing to Provide Property…Ensco Inc · 693JJ626F00015N$500,000Dec 7, 2027in 12 monthsCO
The Federal Railroad Administration (Fra) Seeks the Research to Evaluate the Fire Performance of Materials Used in Passenger Rail Equipment Based on Various Industry Standards. a Database of 320…Jensen Hughes, Inc. · 693JJ626C000037$194,892Dec 9, 2027in 12 monthsVA
The Contractor Shall Provide the Federal Railroad Administration by Evaluating the Performance of Tank Car Gaskets During Derailment Fire in Accordance With Sharma & Associates Inc. Proposal Dated…Sharma & Associates Inc · 693JJ626C000006$299,612Dec 14, 2027in 12 monthsIL
The Purpose of This Follow-on Applied Research Is Continued Research of Validation of a Physics Based Model to Quantify the Fire and Toxic Hazards of Li-Lon BatteriesJensen Hughes, Inc. · 693JJ626C000039$313,800Dec 16, 2027in 12 monthsDC
The Mission of This Project Is to Develop an in-Situ/Handheld Non-Destructive Evaluation (Nde) System to Detect Defects Inside Wheel Journal Bearings in Rail Cars Before They Become Critical.Aerovironment, Inc · 693JJ626C000014$575,283Dec 22, 2027in 13 monthsCA
The Federal Railroad Administration (Fra) Seeks the Development of Testing and Validation of Mobile Railcar Inspection Portal (Mrip). the Scope of This Effort Involves the Deployment, Operation, and…Duos Technologies, Inc. · 693JJ626C000017$2,563,480Dec 31, 2027in 13 monthsFL
Stb Waybill = the Carload Waybill Sample Is an Annual Sample of Proprietary Waybills for Terminated Shipments by Rail Carriers. the Federal Railroad Administration (Fra) and the Surface…Railinc Corp · 693JJ623P000008$1,531,649Dec 31, 2027in 13 monthsNC
This Project Will Focus on Developing a Safety Training Program to Demonstrate Errors on Rail Car Configuration and Improper Shoving Movement to Train Operators to Detect and Correct Errors.Ensco Inc · 693JJ626F00016N$648,000Jan 1, 2028in 13 monthsCO
The Objective of This Project Is to Develop Computer Modeling Tools That Will Allow Rail Car Manufacturers and Bess Integrators to Analyze and Mitigate the Risks Associated With Li-Ion Batteries and…Jensen Hughes, Inc. · 693JJ626C000038$150,000Jan 14, 2028in 13 monthsMD
The Contractor Shall Provide the Federal Railroad Administration by Evaluating the Impact of Advanced Energy Locomotive Technologies on Train Makeup and Handling Using Simulation Method in…Sharma & Associates Inc · 693JJ626C000024$325,132Jan 30, 2028in 14 monthsIL
Continues the Implementation of Cold/Hot Wheel Detection Technology to the Benefit of Railroads (Bnsf Hereto) by Replacing Manual Inspections With Brake Health Effectiveness (Bhe) Technology. the…Sharma & Associates Inc · 693JJ626F00003N$252,141Feb 25, 2028in 15 monthsIL
The Objectives of the Research Project Is to Evaluate the Performance of Advanced Oess and Ancillary Components, Their Protective Housing, Attachment to Rail Car, and General Arrangement for…Ensco Inc · 693JJ624F00040N$746,284Feb 29, 2028in 15 monthsCO
The Purpose of This Purchase Order Is to Procure Services to Support the Project Entitled, "investigating Efficacy of Aftermarket Technologies to Improve Locomotive Efficiency." the Objective of…Southwest Research Institute · 693JJ626P000014$350,000Mar 17, 2028in 16 monthsDC
Decision Lens Software License RenewalImmixtechnology Inc · 693JJ623P000005$228,796Mar 17, 2028in 16 monthsVA
Deploy a Test System Which Utilizes Railroad-Provided Train Location Information and an Fra-Developed Cloud Application to Estimate Blocked Crossing Events.Railinc Corp · 693JJ626C000040$1,402,892Mar 20, 2028in 16 monthsNC
The Development of a Low Cost, Self-Powered, Sensor Mounted to Each Axle Bearing That Will Monitor Vibration Signals and Generate an When a Defect Is First Identified to Ensure the Issue Is…Forcing Function LLC · 693JJ626C000025$625,945Apr 14, 2028in 16 monthsMD
In This Project, We Propose Improving the Trackside System to Address the Research Areas Identified With Bullets 1 and 3 in the Topic Fra-Tr-006. the Improvements Aim at Making the Technology More…University of Pittsburgh - of the Commonwealth System of Higher Education · 693JJ626C000028$234,018May 1, 2028in 17 monthsPA

End dates are the current period of performance; options not yet exercised can extend them. An ending contract may be competed again, extended, or moved to another vehicle. BPA calls and orders shorter than six months are left out. Department of Defense contracts appear on USAspending.gov about 90 days after award.

Get new federal notices by email

New contract opportunities the morning they appear, by agency, industry or state. Free while in beta.

Free. We use your email only for these alerts and never share it. Privacy