- The Miller Act: bonds on federal construction contracts
The Miller Act: bonds on federal construction contracts
Updated
The Miller Act is the federal law that makes contractors on federal construction projects post two surety bonds: a performance bond, which protects the government if the contractor doesn’t finish the work, and a payment bond, which protects the subcontractors and suppliers who furnish labor and material. The statute covers contracts of more than $100,000 for the construction, alteration or repair of any public building or public work of the federal government (40 U.S.C. 3131). The FAR, adjusted for inflation, requires the bonds on construction contracts over $150,000 and calls the law by its codified name, the Bonds statute (FAR 28.102-1).
Find construction work: FedLook’s construction page lists open federal construction notices from SAM.gov, updated daily, with deadlines, set-asides and the agencies buying.
What the Miller Act requires
| Construction contract | What the contractor must furnish |
|---|---|
| $35,000 or less | Nothing under the Miller Act |
| Over $35,000, up to $150,000 | Payment protection. The contracting officer names two or more options, such as a payment bond, an irrevocable letter of credit, a tripartite escrow agreement or certificates of deposit, and the contractor provides one |
| Over $150,000 | A performance bond and a payment bond, each normally for 100% of the contract price |
The bonds or other payment protection must be in place before the contractor gets a notice to proceed or starts work (FAR 28.102-1). A solicitation that requires a performance bond usually also requires a bid guarantee with each bid: see bid bonds.
The Miller Act covers construction, alteration and repair. Service and supply contracts generally don’t need bonds, though an agency can require a performance bond on a larger contract when it needs the protection (performance bonds). The contracting officer can waive the bonds for work performed in a foreign country when the contractor can’t practically furnish them.
What each bond covers
- Performance bond. It protects the government. If the contractor defaults, the surety is liable for the resulting damages and may offer to finish the job. The contracting officer should accept a surety’s offer to complete the contract unless the firm it proposes isn’t qualified or the offer isn’t in the government’s interest (FAR 49.404). By law, the performance bond also covers the federal taxes withheld from workers’ wages on the project (40 U.S.C. 3131).
- Payment bond. It protects the people who supply labor and material. On a private job, an unpaid subcontractor or supplier can file a mechanic’s lien against the property. A lien can’t attach to government property, so on federal projects the payment bond takes its place (F. D. Rich Co. v. United States, 1974).
How big the bonds must be
On contracts over $150,000 (FAR 28.102-2):
- Performance bond: 100% of the original contract price, unless the contracting officer decides a smaller amount protects the government, plus 100% of any price increase.
- Payment bond: 100% of the original contract price, plus 100% of any increase. The contracting officer can set a lower amount only with a written finding that the full amount is impractical, and the payment bond can never be less than the performance bond.
The original contract price is the award price, without options that weren’t exercised at award. For a requirements contract, it’s the price of the estimated total quantity; for an indefinite-quantity contract, the price of the guaranteed minimum.
On contracts over $35,000 up to $150,000, the payment bond or other payment protection must equal 100% of the original contract price, unless the contracting officer decides a smaller amount is enough.
Payment bond claims: who and when
| Who you contracted with | What you must do | Deadline |
|---|---|---|
| The prime contractor | Sue on the payment bond if you haven’t been paid in full 90 days after your last labor or material | Within one year after your last labor or material |
| A subcontractor of the prime | Give the prime contractor written notice of your claim, then sue | Notice within 90 days after your last labor or material; suit within one year |
| Anyone further down the chain | Not covered by the payment bond | — |
The deadlines come from the statute (40 U.S.C. 3133). The Supreme Court has read “subcontractor” in the Miller Act to mean only a firm that contracts with the prime, which is why the coverage stops at the second tier (J. W. Bateson Co. v. United States, 1978).
- The notice. It must state the amount claimed with substantial accuracy and name the party the labor or material was for. Deliver it to the prime contractor’s office, place of business or residence by any means that gives written third-party proof of delivery, or the way a U.S. marshal could serve a summons.
- The lawsuit. It goes to the federal district court for the district where the contract was performed, in the name of the United States for your use, whatever the amount. The government doesn’t pay any of the costs.
- A copy of the bond. If you supplied labor or material and haven’t been paid, the contracting agency must send you a certified copy of the payment bond and the contract when you submit an affidavit saying so. You pay the copying fee.
- Waivers. A waiver of your right to sue on the payment bond is void unless it’s in writing, signed by you, and signed after you’ve furnished labor or material for the contract.
Little Miller Acts
States have their own versions of the law for state and local public works, usually called Little Miller Acts. Their thresholds, notice periods and deadlines differ from the federal law and from state to state, so check the law of the state that owns the project. The federal Miller Act covers only federal projects.
Getting the bonds
- Who can be the surety. A surety company must be on the Treasury Department’s list of approved sureties, Circular 570. Above the underwriting limit the list gives it, the excess must be coinsured or reinsured (FAR 28.202). Instead of a company, a contractor can use an individual surety who pledges assets, or deposit U.S. bonds or notes, a certified or cashier’s check, or an irrevocable letter of credit.
- The forms. Standard Form 24 is the bid bond, SF 25 the performance bond and SF 25A the payment bond (FAR 28.106-1).
- Who pays the premium. The contractor buys the bonds. On a fixed-price construction contract, the government reimburses the premiums through progress payments once the contractor shows it has paid the surety in full, and it doesn’t hold retainage on that amount (FAR 52.232-5).
- Help for small businesses. SBA’s Surety Bond Guarantee program backs bonds for small businesses on contracts up to $9 million, or up to $14 million on a federal contract when the contracting officer certifies the guarantee is needed (SBA). How it works: performance bonds.
Federal construction is a large market for bonded contractors. In fiscal 2026, agencies obligated $53.64 billion under NAICS 236220, commercial and institutional building construction, alone (USAspending.gov).
Next step
Browse open construction notices on FedLook, or read today’s morning edition and get it by email for your state and up to five NAICS codes, such as 236220 or 238220. If you work for a prime contractor, you can look the company up by name, CAGE code or UEI in contractors.
Frequently asked questions
What is the Miller Act?
The federal law that requires a contractor on a federal construction, alteration or repair contract to furnish a performance bond, which protects the government, and a payment bond, which protects the people who supply labor and material. The statute applies to contracts of more than $100,000. The FAR, adjusted for inflation, applies it to construction contracts over $150,000.
Who is protected by a Miller Act payment bond?
Subcontractors and suppliers that have a contract with the prime contractor, and those that have a contract with one of those subcontractors. Firms further down the chain aren't covered: the Supreme Court has read subcontractor to mean one who contracts with the prime.
How long do I have to file a Miller Act claim?
If you have a contract with the prime, you can sue on the payment bond once 90 days have passed since your last labor or material without full payment. If your contract is with a subcontractor, you must first give the prime written notice within 90 days after your last labor or material. Either way, the suit must be filed within one year after your last labor or material.
How much are Miller Act bonds?
On contracts over $150,000, the performance bond and the payment bond each normally equal 100% of the original contract price, and they grow with any price increase. The payment bond can never be less than the performance bond.
What is a Little Miller Act?
A state law that requires similar bonds on state and local public works. Thresholds, notice periods and deadlines differ from the federal Miller Act and from state to state, so check the law of the state that owns the project.
Does the Miller Act apply to service or supply contracts?
No. It covers the construction, alteration and repair of public buildings and public works. Agencies generally don't require bonds on other contracts, though they can require a performance bond on a larger contract when they need the protection.
Sources
- 40 U.S.C. 3131 — Bonds of contractors of public buildings or works
- 40 U.S.C. 3133 — Rights of persons furnishing labor or material
- FAR 28.102-1 — Performance and payment bonds for construction contracts: general
- FAR 28.102-2 — Amount required
- FAR 28.106-1 — Bonds and bond-related forms
- FAR 28.202 — Acceptability of corporate sureties
- FAR 49.404 — Surety-takeover agreements
- FAR 52.232-5 — Payments under fixed-price construction contracts
- F. D. Rich Co. v. United States ex rel. Industrial Lumber Co., 417 U.S. 116 (1974)
- J. W. Bateson Co. v. United States ex rel. Board of Trustees, 434 U.S. 586 (1978)
- SBA — Surety bonds
- USAspending.gov — obligations under NAICS 236220, fiscal 2026
FedLook is not affiliated with SAM.gov or any U.S. government agency. Rules change; check the official sources before you act.
Related guides
- Performance bonds: what they guarantee, what they cost and how to qualify
A performance bond guarantees a contractor will finish the job. When federal contracts require one, how much, what it costs and SBA's guarantee program.
- Bid bonds: how bid guarantees work on federal contracts
A bid bond guarantees a winning bidder will sign the contract and furnish its bonds. When federal bids need one, how much, and what can replace it.
- NAICS codes for construction: general contractors, heavy civil and trades
Construction NAICS codes run from 236115 to 238990. Which one fits a general contractor, remodeler or trade, with size standards and federal spending.
Free · at most one email a morning
Get new federal contracts by email
Pick an industry or a set-aside. Each morning we'll send the new notices that match, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy