1. Opportunities
  2. Department of Defense
  3. Department of the Army
  4. W15QKN26R1C5R

155mm cargo-carrying artillery projectile prototypes

The Army seeks up to two prototype Other Transaction Agreements to develop and deliver 155mm cargo-carrying artillery projectiles that reach 30-35 km in Phase I, with an optional Phase II beyond 35 km.

Official title: 155mm Modular Artillery for Combat Effectiveness (MACE)

Deadline
Nov 30, 3:00 PM ET
4 days left
Who can bid
Not stated
The notice names no set-aside
Last time
$134M
Likely Imt Defense Corp
Place
Not stated
Buyer: W6QK ACC-RI-Picatinny

What they're buying

Phase I is estimated at 34 months, and the place of performance is not stated.

Top catches

Submit through PIEE, not SAM.gov
“formally correct the submission portal from SAM.gov to Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module” Notice text

The original PPON says to submit on SAM.gov, but Amendment 0009 changed the portal to PIEE Proposal Manager at https://piee.eb.mil. Upload there, and do not follow the older SAM.gov instruction.

Page limits cut off extra pages
“If exceeded, the excess pages will not be read and will not be considered in the evaluation.” Notice text

Volume I and Volume II are each capped at 23 pages, and the IMS narrative at 3 pages. Pages past a limit are not read, so keep cover pages and contents free of technical claims or they count toward the limit.

3 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 2 of 2 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Phase I: design and build a 155mm cargo-carrying projectile that reaches 30-35 km, and deliver loaded, assembled and packed rounds for engineering, safety, qualification and soldier tests.
  • Phase I quantities listed in the packing section: up to 115 projectiles for engineering tests and demos, up to 335 for limited safety tests, up to 1,200 IPB projectiles, and 1,000 each in FY28 and FY29 for soldier testing.
  • Phase II: design an alternate range extension solution for ranges beyond 35 km, and deliver up to 100 alternate range extension sub-systems and up to 1,200 alternate configuration projectiles.
  • Ammunition Data Cards with each prototype projectile delivery, plus Safety Data Sheets and the AA&E worksheet (Attachment 10).
  • Packaging: 8 projectiles per pallet, 3 pallets bundled with steel strapping, ISPM 15 heat-treated wood, and performance-oriented packaging tests for hazardous items (hazard class 1.1D).
  • Cost volume: a cost-plus-fixed-fee price for each CLIN from 0001 through 0026 in Excel with formulas intact, plus the SOW Section 6.0 milestone table.

Who supplied it lately

$134M

on a recent contract for the same kind of product: Imt Defense Corp. It ended Sep 30, 2026.

Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.

What to watch for

  • Submit through PIEE, not SAM.gov. The original PPON says to submit on SAM.gov, but Amendment 0009 changed the portal to PIEE Proposal Manager at https://piee.eb.mil. Upload there, and do not follow the older SAM.gov instruction.
  • Page limits cut off extra pages. Volume I and Volume II are each capped at 23 pages, and the IMS narrative at 3 pages. Pages past a limit are not read, so keep cover pages and contents free of technical claims or they count toward the limit.
  • Three eligibility conditions apply. No set-aside is stated, but you must meet one of three conditions: a nontraditional contractor or nonprofit takes a significant role, all significant participants are small or nontraditional, or at least one third of cost comes from non-federal sources. Use Attachments 2 and 3 to show which condition you meet.“In accordance with 10 U.S.C. §4022(d), Offerors shall meet one of the following conditions to be considered for an award:” PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
  • Purchase Description needs signed forms. The Purchase Description and drawings are released only after you sign and return Attachments 12, 6 and 14. The Purchase Description is Distribution D, open only to DoW and DoW contractors. Start these forms now, because the notice gives no release timeline.“will be provided to Offerors upon request once the Offeror signs, completes and submits the following documents for contracting approval” PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
  • Material quotes must be executable. Your cost proposal must be backed by executable vendor quotes for materials. The Government will not award on rough order of magnitude estimates, so request firm material quotes before you price.“We cannot award using Rough Orders of Magnitude (ROM).” Attachment 26 - Updated MACE Offeror Questions Addressed (Dated10-15).xlsx

Key terms

Who can bidOfferors meeting one of three 10 U.S.C. §4022(d) conditionsNo set-aside is stated. A team may include a large business if a nontraditional defense contractor takes a significant role.PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
Contract periodPhase I about 34 months after awardThe Phase II duration is to be defined. Schedules run from award, not from fixed calendar dates.PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
How they chooseIntegrated best-value assessment; lowest price is not assuredNon-cost factors together count far more than Cost/Price. Phase I Schedule is the most important sub-factor.PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
How to submitElectronically through the PIEE Proposal Manager Module at https://piee.eb.milAmendment 0009 replaced the SAM.gov submission instruction in the original PPON.Notice text
Questions dueClosed at 1500 EST on November 18, 2026The Government no longer accepts questions. Check the answers already posted on SAM.gov.Notice text
Contract typePrototype Other Transaction Agreement, cost-plus-fixed-feeThe Government intends to make up to two awards, but may make one or none.PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx

How to respond

  1. Submit all volumes electronically through the PIEE Proposal Manager Module at https://piee.eb.mil, not SAM.gov, by 1500 EST on Monday, November 30, 2026.
  2. Assemble four volumes: Volume I (Phase I schedule and technical, max 23 pages), Volume II (Phase II schedule and technical, max 23 pages), Volume III (Excel cost proposal with CLIN 0001 through 0026 and the SOW Section 6.0 milestone table), and Volume IV (cover letter max 2 pages, signed OTA Terms and Conditions, Attachments 2 and 3, and Section 889 evidence). Keep pricing out of Volumes I, II and IV.
  3. Name the files as the notice requires, for example VendorName_Vol_1_Phase1_155mm MACE_XXXXXX, and name Volume IV VendorName_Vol_4_Docs_XXXXXX.pdf.
  4. Use Arial, at least 12-point text, 1-inch margins, and searchable MS Office or PDF files. ZIP files, hyperlinks and self-extracting files are not acceptable.
  5. Sign and return Attachments 12, 6 and 14 to request the Purchase Description and drawings. The notice does not say how long approval takes.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • The estimated dollar value or budget for the prototype work.
  • Where the work will be performed, including any manufacturing site.
  • Set-aside status: the SAM.gov record says Not stated.
  • The final award date: earlier answers assume 22 January 2027, but Amendment 0007 gives an anticipated date of March 29, 2027.
  • The current CLIN matrix, Statement of Work and Terms and Conditions: we could not review them, so read the latest versions on SAM.gov before you price.
  • The Phase II duration and funding timeline, which the notice says is to be defined.

Notice text

Amendment 0012 - The purpose of this Amendment 0012 is to formally revise the Prototype Project Opportunity Notice (PPON) Section 3.2.2 to clarify the Page Limitations as follows: Page limitations cited above are maximums. Page limits apply strictly to evaluatable technical and schedule content. Cover pages, tables of contents, and section dividers are considered administrative/navigational elements and are excluded from the page count, provided they contain solely administrative information (e.g., company names, points of contact, table of contents, or glossaries/acronym lists) and do not contain evaluatable technical designs, schedule narratives, or performance claims.

If exceeded, the excess pages will not be read and will not be considered in the evaluation.Formally Incorporates Updated Attachment: The following updated attachment is incorporated into the solicitation and replace all previous versions: PPON Document MACE Extended (W15QKN-26-R-1C5R, Dated 11-23). ******************End of Amendment 0012************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0011 - The purpose of this Amendment 0011 is to incorporate the updated questions and answers attachment, formally update the Terms and Conditions acceptance timeline, and establish a final question cutoff deadline in the Prototype Project Opportunity Notice (PPON).

Specifically, this amendment: Formally Incorporates Updated Attachments: The following updated attachments are incorporated into the solicitation and replace all previous versions: Attachment 36 Updated MACE Offeror Questions Addressed (Dated 11-16), incorporating Questions #34 through #38. Please note: Attachment 36 has been uploaded as a Controlled attachment. Attachment 37 Terms and Conditions (Dated 11-16), updated in Supplement 1 (Invoicing and Payment Instructions), Section F, to formally codify the thirty (30) calendar day review and acceptance timeline per Question #36.

PPON Document MACE Extended (W15QKN-26-R-1C5R, Dated 11-16), revised to update the Section 11 attachment list and add Section 3.1.14 establishing the final deadline for industry questions. Establishes Final Question Cutoff Date: Section 3.1.14 is added to the PPON as follows: 3.1.14 Question Cutoff Date: To ensure the Government has sufficient time to review, coordinate, and formally respond to all industry inquiries prior to the upcoming holiday and proposal closing date, the Government will no longer accept questions or requests for clarification after 1500 EST on November 18, 2026.

Any questions received after this date and time will not be addressed. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended attachments (dated November 16, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes.********************End of Amendment 0011***********************************************************************************************************************************************************************************************************************************************Amendment 0010 - The purpose Amendment 0010 is to incorporate the updated questions and answers attachment and to formally revise the Prototype Project Opportunity Notice (PPON) Volume IV row of the Section 3.2.1 table.

Specifically, this amendment:1. Formally Incorporates Updated Attachments: The following updated attachments are incorporated into the solicitation and replace all previous versions: Attachment 35 Updated MACE Offeror Questions Addressed (Dated 11-12), incorporating Questions #32 and #33. Please note Attachment 35 has been uploaded as a Controlled attachment. PPON Document MACE Extended November 30 W15QKN-26-R-1C5R (Dated 11-12), revised to incorporate the updated attachment list in Section 11 and Volume IV row of Section 3.2.1 table.

2. Establishes Proposal Submission Boundaries: This correction ensures that the SOW Section 6.0 Milestone Table remains strictly in Volume III (Cost/Price) as a priced document, while the Section 889 Certification is properly submitted within Volume IV (Miscellaneous Agreement Documentation).Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended attachments (dated November 12, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes..***********************************************************************************************************************************End of Narrative 0010*****************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0009 - The purpose of this Amendment 0009 is to incorporate the updated questions and answers attachment, formally revise the proposal submission portal instructions in the Prototype Project Opportunity Notice (PPON) and to add Attachment 34.

Specifically, this amendment: Formally Incorporates Updated Attachments and a new attachment: The following attachments are incorporated into the solicitation and replace all previous versions: Attachment 33 Updated MACE Questions Addressed (Dated 11-5), incorporating Questions #24 through #31 (including key clarifications regarding propellant GFE, NRE milestone formatting, and payload canister compatibility). Please note Attachment 33 has been uploaded as Controlled attachment.

Attachment 34 12961016 Rotating Cover Band has been uploaded as Controlled attachment in response to question #28. PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated 11-5) has been revised to incorporate the updated attachment list in Section 11. Amends the PPON Submission instructions: The PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated11-5) has been revised in Section 3.1.13 to formally correct the submission portal from SAM.gov to Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module: Revised Text: 3.1.13 All proposal submissions shall be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module (https://piee.eb.mil) .The direct solicitation link may be accessed via the active solicitation notice on SAM.gov. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended attachments (dated November 5, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. **************************************************************************************************************************************End of Narrative 0009*****************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0008 - The purpose of this Amendment 0008 is to incorporate updated questions and answers, and issue revised solicitation attachments.

Specifically, this amendment: Formally Incorporates Updated Attachments: The following updated attachments are incorporated into the solicitation and replace all previous versions: Attachment 30 Updated MACE Offeror Questions Addressed (Dated 10-29), incorporating Questions #20 through #23.Attachment 31 Updated MACE CLIN Matrix (Dated 10-29), to clarify that the due dates for CLINs 0001A and 0014A represent the initiation of NRE activities, and that payment may be earned across interim milestones per Question #23.Attachment 32 Updated Statement of Work (SOW) (Dated 10-29), removing the administrative reference to Attachment B in SOW Section 8.0 per Question #21.Amends the PPON Text: The Prototype Project Opportunity Notice (PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated 10-29) has been revised in Section 3.3.3 (Volume III, Cost/Price) to add the following language to the third paragraph: to include the interim milestone allocations for Non-Recurring Engineering (NRE) under CLIN 0001A and CLIN 0014A.

The attachment list has been updated to incorporate the revised attachments. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes.*******************************************************************************************************************************************************************************************************************************************End of Narrative 008 ***********************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0007 - The purpose of this Amendment 0007 is to extend the solicitation response deadline, incorporate updated questions and answers, and issue revised solicitation attachments.

Specifically, this amendment: Extends the Proposal Submission Deadline: The solicitation response deadline is extended from October 30, 2026, to 1500 EST on November 30, 2026. This extension is granted to ensure all potential offerors have sufficient time to conduct thorough analyses, address recent technical clarifications, and submit comprehensive, high-quality proposals that deliver the best value to the Government. As a result, the Prototype Project Opportunity Notice (PPON Document: PPON MACE EXTENDED November 30 W15QKN26R1C5R Dated 10-27) has been revised to reflect the new response deadline and the updated attachments list.

Incorporates Updated Attachments: The following updated attachments are formally incorporated into the solicitation and replace all previous versions: Attachment 27 Updated MACE Offeror Questions Addressed (Dated 10-26), incorporating Questions #17 through #19.Attachment 28 Updated Statement of Work (SOW) (Dated 10-26), reflecting the revised anticipated award date of March 29, 2027, while maintaining relative milestone durations. Attachment 29 Updated MACE CLIN Matrix (Dated 10-26), incorporating dedicated Non-Recurring Engineering (NRE) line items pursuant to Question #17.

Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. ************************************End of Narrative 0007 ***********************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0006 - The purpose of amendment 0006 is to update the Question and Answer document from Attachment 23 - Updated MACE Offeror Questions Addressed 10-5 to Attachment 26 - Updated MACE Offeror Questions Addressed 10-15.

This amendment also updates the PPON (PPON MACE Extended Updated Attachments (Updated 10-15)) to add Attachment 26 to the attachment list.*********************End of Amendment 0006*****************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0005 - The purpose of this Amendment 0005 is to resolve the schedule discrepancies identified in the solicitation and provide the definitive baseline for all proposal submissions.

Specifically, this amendment: The Government acknowledges the discrepancy between the delivery dates specified in the original Statement of Work (SOW) (Attachment 7) and the performance periods specified in the original MACE CLIN Matrix (Attachment 4), which was caused by the proposal submission extension in Amendment 0001. This Amendment 0005 provides a revised and corrected Statement of Work (SOW) and CLIN Matrix. All schedule milestones have been aligned to relative durations (Months After Agreement Award) to ensure a stable, executable performance period.

Amendment 0005 also adds the Updated MACE Questions Addressed plus an updated PPON which lists the amended attachments. The following updated attachments are formally incorporated into the solicitation and replace all previous versions: Attachment 25 Updated Statement of Work (SOW) (Dated 10-6) Attachment 24 Updated MACE CLIN Matrix (Dated 10 6) Attachment 23 Updated MACE Questions Addressed (Dated 10-5) PPON Document MACE Extended Updated Attachments W15QKN 26R1C5R (Dated 10-6) All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents (updated attachments October 5 and 6, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. *********************End of Amendment 0005*****************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0004 - The purpose of amendment 0004 is to update the Question and Answer document from Attachment 15 - Updated MACE Offeror Questions Addressed 9-17 to Attachment 16 - Updated MACE Offeror Questions Addressed 9-24.

Amendment 0004 also serves as notification that 6 additional TDP documents have been uploaded to SAM.gov. Vendors who have already been approved for the TDP can access the documents immediately, and those not previously approved may request access through SAM. **********************************************End of Amendment 0004*****************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0003 - The purpose of this amendment 0003 is to add Attachment 15 - Updated MACE Offeror Questions Addressed 9-17 **************End of Amendment 0003*****************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0002 - The purpose of this amendment 0002 is to add Attachment 15 - MACE Offeror Questions Addressed. *********************End of Amendment 0002 Narrative *********************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************** Amendment 0001 - The purpose of this amendment 0001 is to extend the solicitation response deadline from September 30, 2026 to October 30, 2026.

This extension is granted to ensure all potential offerors have sufficient time to conduct thorough analyses, address recent technical clarifications, and submit comprehensive, high-quality proposals which deliver the best value to the Government. As a result of the extension, the Prototype Project Opportunity Notice (PPON) has been revised to reflect the new response deadline. Attachment 1 - Terms and Conditions has been updated in Supplement 5, Sub Section number 2 Outside Funding Contribution Schedule to change the Basic Agreement Years from FY 2026, FY 2027, FY 2028 to FY 2027, FY 2028, FY 2029. ****End of Amendment 0001 Narrative****************************************************************************************************************************** 155mm Modular Artillery for Combat Effectiveness (MACE) - Please refer to Prototype Project Opportunity Notice (PPON) and attachments.

Please note: Attachment 8 - Purchase Description and Attachment 9 - Packing and Unitization Drawings will be provided to Offerors upon request once the Offeror signs, completes and submits the following documents for contracting approval: Attachment 12 Technical Data Request Questionnaire; Attachment 6 Non-Disclosure and Non US Agreement plus Attachment 14 DD2345 Military Critical Technical Data Agreement. Please refer to section 8 of the PPON for further information.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who has supplied this lately

Contracts at Department of the Army for the same kind of product (NAICS 332993, product code 1320) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy