1. Opportunities
  2. Department of Defense
  3. Department of the Air Force
  4. F3YCFA6173AC01

Fiber optic cable for flightline, Luke AFB, AZ

The Air Force wants a contractor to engineer, furnish, install and test about 30,000 feet of new 12-strand single mode fiber optic cable, with handholes, conduit and innerduct, at Luke Air Force Base, Arizona.

Official title: 56 CS FOC to Flightline and Wx Equipment, Luke AFB

Deadline
Dec 7, 1:00 PM ET
11 days left
Who can bid
WOSB firms
Certified women-owned small businesses (WOSB or EDWOSB) only · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Luke Air Force Base, AZ
Buyer: FA4887 56 Cons CC

What they're buying

Only SBA certified women-owned small businesses may bid, and the due date and performance period conflict across the notice documents.

Top catches

Deadline conflicts across sources
“Response deadline: 2026-12-07T13:00:00-05:00” SAM.gov record

The notice text says 30 November at 1300, the SAM record says 7 December at 13:00 -05:00, and the SF 1449 shows 09 November, which has passed. Ask the contracting officer to confirm the exact due date and time in writing before you plan.

WOSB status and cable source
“Only SBA Certified Women Owned Small-Businesses are eligible for this requirement.” Notice text

Only SBA certified women-owned small businesses may bid. Because the nonmanufacturer rule applies, any fiber cable you furnish must be made in the United States by a domestic small business, so confirm both before you price.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 7 of 10 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • About 30,000 ft of new 12-strand single mode fiber, plus 144, 96, 48, 36 and 24-strand runs, in new and existing ducts or direct buried. All distances are estimates.
  • Two new handholes, about 600 ft of new conduit, and about 2,000 ft of geotextile innerduct (MaxCell or equal).
  • Terminate cable on new fiber distribution panels at RAPCON (B979), ATCT (B998), Base Ops (B453), and the ILS, TACAN, command post, GATR and FMQ-19 sites. The panel count conflicts (see catches).
  • One new full-size network cabinet with power and grounding at RAPCON (B979), plus new backboards at several buildings.
  • Test every strand by OTDR and optical power meter at 1310 nm and 1550 nm, and deliver as-built drawings and shapefiles.
  • Supply TC Communications fiber transport equipment, UPS units, 66 blocks and training for 5 people, which Q&A item 3 places in scope.

Who supplied it lately

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline conflicts across sources. The notice text says 30 November at 1300, the SAM record says 7 December at 13:00 -05:00, and the SF 1449 shows 09 November, which has passed. Ask the contracting officer to confirm the exact due date and time in writing before you plan.
  • WOSB status and cable source. Only SBA certified women-owned small businesses may bid. Because the nonmanufacturer rule applies, any fiber cable you furnish must be made in the United States by a domestic small business, so confirm both before you price.
  • TC Communications work is in scope. The SOO pages cover a separate TC Communications fiber transport replacement, UPS units and training, and Q&A item 3 says they are in scope. Price that work too. Pages 48 to 60 of the SOW were not provided to us, so read the full file.“The pages pertaining to TC Communications equipment, UPS and training are part of the scope of work for this project.” Solicitation QA - 56 CS Responses-final.pdf, page 1
  • Performance period is unclear. The SOW allows 180 calendar days, the SOO allows 120 days from award, and the SF 1449 requires delivery by 01 Jul 2027. Ask for the official period in writing and plan your crew and schedule to the shortest one.“The Contractor shall have 120 days from contract award to complete all facets of the project” SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf, page 76
  • Airfield waiver and FAA filing lead time. Work on the airfield cannot start until a temporary construction waiver is issued. The FAA 7460-1 filing is due at least 45 days before construction starts, and flying hours limit when you can work on the flightline.“Temporary construction waiver will be required before work can be started on the airfield, as well as FAA 7460-1 submission NLT 45 days prior to the start of construction.” Solicitation QA - 56 CS Responses-final.pdf, page 4
  • Quantities and panel count conflict. The SOW lists 15 distribution panels, while Q&A items 12 and 25 say 13. The route tables total about 23,660 ft of 12-strand against 30,000 ft in section 2.2. Confirm distances during your own survey and price the route you can verify.“Any distances provided in this SOW are approximations and should NOT be used for ordering materials or determining duct lengths.” SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf, page 10

Key terms

Who can bidSBA certified women-owned small businesses only (WOSB set-aside)Size standard is 1000 employees under NAICS 335921 per the SF 1449. Amendment 0002 swaps clause 52.219-6 for 52.219-30.Notice text
Contract periodConflicting: 180 calendar days per the SOWThe SOO says 120 days from award, and the SF 1449 sets delivery at 01 Jul 2027. Q&A item 14 says the official period is set at award.SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf, page 23
How they chooseLowest priced, technically acceptable quoteThe same clause also uses best-value wording. Four technical subfactors must each rate Acceptable, and Yellow or Red past performance is excluded.Solicitation - FA488727Q0003.pdf, page 22
Questions duePassed: 22 Oct 2026 at 1500 Arizona time (notice text)Q&A item 7 gives 19 Oct 2026 at 1500 Arizona time instead. Attendees of the site visit got an extended Q&A period, with no date given.Notice text
Contract typeFirm fixed price, one lotCommercial products and services form. Davis-Bacon wage rates apply to the installation part per Q&A item 8.Solicitation - FA488727Q0003.pdf, page 3
Site visitHeld 4 Nov 2026 at 0900 (already passed)Site visit requests were due 26 Oct 2026. Q&A item 36 says a walk-through was set for 4 Nov 2026.Notice text

How to respond

  1. Confirm the due date and time with the contracting officer, Rachel Tilley, at rachel.tilley.1@us.af.mil or 856-2727, and get the answer in writing.
  2. Where to send the quote: Not stated. Ask the contracting officer for the submission method, such as email, portal or hard copy.
  3. Keep the proposal to 25 pages total. Include a paragraph cross-reference to the SOW for Subfactor A, as Q&A items 5 and 6 allow.
  4. Cover the four technical subfactors (design, quality control plan, staffing plan and schedule), plus a price breakdown with materials, labor, data marked NSP, travel and other direct costs.
  5. Have proof of your SBA WOSB certification and your domestic small business fiber cable source ready, and sign and return the SF 1449 blocks 12, 17, 23, 24 and 30.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • The official due date and time, and where to send the quote, because the sources conflict and the submission method is not stated.
  • Estimated contract value.
  • Davis-Bacon wage rates for the installation work, since no wage determination is in the provided text.
  • The official period of performance, which the award document will set.
  • Whether the Government or you must provide escorts, since the SOW and SOO say the Government provides them and Q&A item 37 says escorts will not be provided.
  • We could not review the Site Visit Q&A, the Environmental Guide for Contractors or the Anti-Terrorism Pamphlet, so you must read them on SAM.gov yourself.

Notice text

FINAL EXTENSION: Proposals are due no later than 30 November at 1300. NO ADDITIONAL EXTENSIONS WILL BE PROVIDED. Responses to Site Visit Q&A will be posted by 13 November 2026 at 1300 Arizona Time. The Government intends to hold a site visit for subject requirement on 4 November 2026 at 0900 AM. Below you will find the instructions and required documents to attend. Only SBA Certified Women Owned Small-Businesses are eligible for this requirement. **THIS IS THE ONLY DATE AND TIME FOR THE SITE VISIT, REQUESTS TO MAKE ANY CHANGES WILL BE DENIED** Attendance will be limited to 2 representatives for each contractor.

To attend please provide the attached template (Site Visit Base Access_Template) completed with the below information, to rachel.tilley.1@us.af.mil, no later than 26 October 2026 at 1500 Arizona Time. Required Info: Last Name, First Name, DOB, US Citizen, License or ID#, State of Issue, Last 4 SSN To access the installation, the attendee will be required to have a REAL ID or Government Issued Passport. When submitting the above information, please include a copy of the form of ID to allow for Security Forces to verify if it meets the requirements. **QUESTIONS ARE DUE NO LATER THAN COB 22 OCTOBER 2026 at 1500 AZ time** ***FINALIZED Q&A Document will be posted with answers no later than 26 October 2026*** This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059).

Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished.

No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment. See attached Solicitation and supporting documents for additional information.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 20, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Similar open notices

Open now under NAICS 335921, fiber optic cable manufacturing, soonest deadline first.

All open notices under NAICS 335921

Free · at most one email a morning

Get new notices from Department of the Air Force by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy