1. Opportunities
  2. Department of Energy
  3. RFP_476957

Electron Injector complex design services, Upton, NY

Brookhaven National Laboratory, run by Brookhaven Science Associates for the U.S. Department of Energy, wants an architect-engineer firm to design the Electron Injector Complex: preliminary design, final detailed design, and an optional construction support phase.

Official title: A-E Services for Electron Injector Complex

Deadline
Nov 30, 5:00 PM ET
5 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Upton, NY
Buyer: Brookhaven Natl Lab -DOE Contractor

What they're buying

Design services run through 1 November 2028, and the construction option, if exercised, through 21 March 2031.

Top catches

Due Monday after holiday, no extension
“no extension will be given at this time.” RFP Amendment 2/RFP Q&A, 476957, EIN Design.pdf, page 4

Proposals are due Monday, November 30, 2026 at 17:00 (UTC-05:00), and BSA said no extension will be given. Send early and keep proof that the email arrived before the deadline.

Mandatory site meeting or rejection
“mandatory pre-proposal site meeting will result in rejection of that Offeror’s proposal as being non-responsive.” RFP Amendment 2/B1. RFP Letter 476957 Amend 2.pdf, page 2

Short-listed teams must attend the mandatory pre-proposal site meeting or their proposal is rejected. The date is not set until teams are short-listed, so keep time and travel open for it.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 12 of 26 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Preliminary design report with drawings and outline specifications in civil, architectural, structural, mechanical and electrical disciplines, plus a Class 3 cost estimate with 10% design contingency.
  • Geotechnical report, digital terrain model from total station and LIDAR surveys, and visual checks of existing utilities.
  • Fathom hydraulic models and water balance diagrams for the cooling water system served by pump house B1203A, with native model files.
  • Electrical arc flash compliance report per OSHA 29 CFR 1910 and NFPA 70E-2021, updated at the 90% and 100% design submittals.
  • Final detailed design with 60%, 90% and 100% submittals, value engineering studies, and conformed construction documents.
  • Optional construction support services; the Q&A refers to 24 specified site visits.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Due Monday after holiday, no extension. Proposals are due Monday, November 30, 2026 at 17:00 (UTC-05:00), and BSA said no extension will be given. Send early and keep proof that the email arrived before the deadline.
  • Mandatory site meeting or rejection. Short-listed teams must attend the mandatory pre-proposal site meeting or their proposal is rejected. The date is not set until teams are short-listed, so keep time and travel open for it.
  • Any exception may void the contract. The letter says to note exceptions, but the draft contract says any exception or alteration makes BSA’s execution null and void. Accept Enclosure 1 in full, or notify BSA’s Contractual Representative before you submit.“Should you take any exceptions or attempt to alter the Contract in any manner, BSA’s execution thereof shall be null and void.” RFP Letter - Attachments - Enclosures/Enclosure 1 - Draft Contract 476957.docx
  • 30% or 60% design level conflict. The addendum describes the preliminary report at a 30% design level, while the milestone table asks for a 60% preliminary design submittal. Ask BSA in writing which level to price, and state your assumption in the proposal.“design for civil, architectural, structural, mechanical, and electrical disciplines.” RFP Amendment 2/EIN Addendum 1 to SOW.pdf, page 1
  • Redesign to budget at no added fee. If construction bids exceed the $271,000,000 target, you must redesign to fit the limit at no increase in your design price, unless the gap was beyond your control. Price this risk into your fee.“These additional services shall be performed at no increase in the price of this Contract.” RFP Letter - Attachments - Enclosures/Enclosure 1 - Draft Contract 476957.docx
  • Key design files unread; data after award. The concept design and several drawing and basis files could not be reviewed here, and BSA will not provide existing-condition data before award. You must read those files yourself and price the surveys and investigations they call for.“The conceptual design has been completed and the Conceptual Design Report (CDR), when combined with this SOW, will serve as the basis of the Contractor’s (hereafter known as the A/E) scope of services.” RFP Amendment 1/Attachment (C) SOW A-E for the Electron Injector (EIN).pdf, page 8

Key terms

Who can bidOpen to any interested firm for Phase One qualificationsOnly the top three ranked teams are asked to submit price proposals. Contractors are expected to be registered in SAM.RFP Amendment 2/B1. RFP Letter 476957 Amend 2.pdf, page 2
Contract periodDesign through 1 November 2028; construction option through 21 March 2031The construction support option is exercised by written modification and is priced separately.RFP Letter - Attachments - Enclosures/Enclosure 1 - Draft Contract 476957.docx
How they chooseBest value trade-off of technical factors and priceTechnical factors are weighted more heavily than price, but the letter's wording on how much more is inconsistent.RFP Amendment 2/B1. RFP Letter 476957 Amend 2.pdf, page 13
How to submitEmail to Eric Nagel at enagel@bnl.govSend the technical proposal and any price proposal as separate volumes, with the exact subject line given in the letter.RFP Amendment 2/B1. RFP Letter 476957 Amend 2.pdf, page 3
Questions due12 November 2026 (passed)Answers to bidder questions were posted in Amendment 2. Question 21 asked for an extension and was refused.RFP Amendment 2/B1. RFP Letter 476957 Amend 2.pdf, page 15
Estimated valueDesign price not stated; construction target $271,000,000The draft contract design price is a $0.00 placeholder, and the milestone payment amounts are TBD.RFP Letter - Attachments - Enclosures/Enclosure 1 - Draft Contract 476957.docx
Contract typeFirm fixed price, with a priced construction support optionOnly the preliminary and final design phases are awarded first.RFP Amendment 2/B1. RFP Letter 476957 Amend 2.pdf, page 1
Site visitMandatory pre-proposal site meeting; date not setOnly short-listed teams attend. BSA will set the date once the teams are identified.RFP Amendment 2/B1. RFP Letter 476957 Amend 2.pdf, page 2

How to respond

  1. Email one electronic copy of the Technical Proposal (Volume 1) to enagel@bnl.gov. It must be received by Monday, November 30, 2026, 17:00 (UTC-05:00).
  2. Use this subject line: BSA RFP Number 476957 Architect and Engineering Services (A/E) – Electron Injector Complex (EIN) Project.
  3. Organize Volume 1 in tabs: Tab 1 projects, Tab 2 key personnel, Tab 3 relevant experience, Tab 4 quality of proposal, Tab 5 past performance. Do not include price in Volume 1.
  4. If short-listed, send the price proposal as a separate volume on the signed AMS-Form-043 pricing sheet. The schedule lists December 30, 2026, but BSA has not set a notice date.
  5. Accept Enclosure 1 in full. Any exception may void the contract.

Attached files

From SAM.gov. Download links open the original files.

12 more files from ZIP archives, 10 read
  • RFP Amendment 2/B1. RFP Letter 476957 Amend 2.pdfCurrent RFP letter with schedule, submission rules, phases and evaluation criteria; only pages 1-6 and 12-15 were provided. Read it; no signature required. Read in part (pages 1–6 and 12–15 of 15).
  • RFP Amendment 2/EIN Addendum 1 to SOW.pdfAddendum 1 changing SOW sections 4.3 to 4.5 on preliminary design, cooling water modeling and final design. Read only. Read.
  • RFP Amendment 2/RFP Q&A, 476957, EIN Design.pdfBSA answers to bidder questions, including scope, schedule, pricing and teaming. Read only. Read.
  • RFP Letter - Attachments - Enclosures/Attachment (A) BSA General Terms and Conditions for Non-Commercial Services.pdfStandard BSA contract terms; only pages 1-4 and 28-32 were provided. Read, because they become part of any contract. Read in part (pages 1–4 and 28–32 of 32).
  • RFP Letter - Attachments - Enclosures/Attachment (B) BSA Supplemental Terms and Conditions for Work by Contractors on Site at BNL.pdfOnsite rules for contractors covering badging, substance testing and safety penalties; only pages 1-5 and 12-15 were provided. Read only. Read in part (pages 1–5 and 12–15 of 15).
  • RFP Letter - Attachments - Enclosures/Attachment (C) SOW A-E for the Electron Injector (EIN).docx Older version, not read.
  • RFP Letter - Attachments - Enclosures/Attachment (D) BNL-QA-101.pdfSupplier quality assurance requirements; only pages 1-2 and 5-6 were provided. Read; they apply when the contract invokes them. Read in part (pages 1–2 and 5–6 of 6).
  • RFP Letter - Attachments - Enclosures/B1. RFP Letter 476957.pdfOriginal October 23 RFP letter, partly provided. Read it for comparison with Amendment 2. Read in part (pages 1–6 and 12–15 of 15).
  • RFP Letter - Attachments - Enclosures/Enclosure 1 - Draft Contract 476957.docxDraft contract the winning firm would sign; accept in full or note exceptions as the letter requires. Read carefully, since it has blank key personnel and price fields. Read.
  • RFP Letter - Attachments - Enclosures/Enclosure 2 - AMS-Form-043 Pricing Sheet.docxPricing form for the price proposal. If you are short-listed, you must fill it in and sign it. Read.
  • RFP Amendment 1/Attachment (C) SOW A-E for the Electron Injector (EIN).pdfStatement of work with scope, schedule and deliverables; only pages 1-8 and 53-56 were provided. Read it for the full scope. Read in part (pages 1–8 and 53–56 of 56).
  • RFP Amendment 1/B1. RFP Letter 476957 Amend 1.pdf Older version, not read.

Download the archives from SAM.gov: archive 1, archive 2, archive 3.

Not stated in what we read

  • Design fee: the draft contract price is blank, and the milestone payment amounts are TBD.
  • Insurance and bonding minimums: the Insurance article in the Supplemental Terms was not in the pages provided.
  • Date of the pre-proposal site meeting and the notice date for short-listed teams: BSA says no official date is known.
  • Contents of the Concept Design, Basis of Design and most drawing files: several could not be read or were left out, so you must read them.
  • Construction support option: duration and pricing basis. SOW section 6.3.2 was not provided.
  • Key personnel: the draft contract lists TBD for key personnel and the contractor's technical representative.

Notice text

This is an official Request for Proposal (RFP) for the EIN Injector Complex A/E Design project at Brookhaven National Labs. Refer to the RFP Letter and attachments for details and proposal submission requirements. Amendment 1 is posted to update the RFP letter amendment 1 for highlighted changes, specifically as it relates to the questions due date. The signed SOW is also included to the list of attachments. Amendment 2 is posted to incorporate Addendum 1 to the Statement of Work and post responses to the questions submitted in response to this RFP. See attachments section for Addendum 1 and the Q&A responses.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 21, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Energy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy