Bending magnets for ALS-U storage ring, Berkeley, CA

Lawrence Berkeley National Laboratory, run by the University of California for the Department of Energy, wants a fixed-price subcontract to build five BENDB and five BENDC bending magnets, two spare coil sets, and raw material for ten magnets, with 15 optional magnets of each type.

Official title: Advanced Light Source Upgrade (ALS-U) STORAGE RING (SR) BENDB AND BENDC MAGNETS

Deadline
Dec 21, 3:00 PM PT
25 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Berkeley, CA
Buyer: Berkeley Natl Lab - DOE Contractor

What they're buying

Proposals are due Monday, December 21, 2026, 3:00 PM Pacific Time.

Top catches

Terms must be accepted with no exceptions
“The offeror should include in its proposal a statement that the offeror takes no exceptions to the terms, conditions, general provisions, or the incorporated documents of the Sample Subcontract.” 1) RFP-BVSS BENDB and BENDC Rev. 1.pdf, page 10

You must accept the draft subcontract, including flow-down clauses for your own suppliers. Exceptions can lower your rating and can block award. Read the General Provisions before you price, because they were not readable here.

Foreign-made parts need a Buy American exception
“which requires that only domestic end products be delivered” 1) RFP-BVSS BENDB and BENDC Rev. 1.pdf, page 12

Only domestic end products may be delivered unless an exception applies. A foreign product needs price or availability support in your proposal. Check where every magnet part, coil and material is made before you price.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 13 of 18 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Build one first-article and four production BENDB magnets (AL-1477-4120) to LBNL drawings.
  • Build one first-article and four production BENDC magnets (AL-1479-9548) to LBNL drawings.
  • Supply two spare coil sets and copper, steel and CoFe raw material for ten magnets, priced as one lot.
  • Deliver factory test reports, certificates, a manufacturing inspection plan, and review meetings for each first article.
  • Design and build reusable shipping containers approved by LBNL before packing, sized for air shipment and fitted with shock indicators.
  • Optional: 5 or 10 more BENDB and 5 or 10 more BENDC magnets, which LBNL may order in any combination or not at all.

Who supplied it lately

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Terms must be accepted with no exceptions. You must accept the draft subcontract, including flow-down clauses for your own suppliers. Exceptions can lower your rating and can block award. Read the General Provisions before you price, because they were not readable here.
  • Foreign-made parts need a Buy American exception. Only domestic end products may be delivered unless an exception applies. A foreign product needs price or availability support in your proposal. Check where every magnet part, coil and material is made before you price.
  • Magnet mass conflicts with drawings. The BENDB and BENDC acceptance lists set magnet mass at 1513 kg. The drawings estimate about 1621 kg for BENDB and 1621 kg for BENDC. Ask LBNL which figure governs, and price freight and handling on the higher figure until they answer.“Magnet Assembly Mass Should = 1513 kg” AL-1925-6317A.pdf, page 3
  • Drawing and CAD package was not readable. The drawing and CAD zip file, BEND+BC+Drwgs+and+CAD+Models.zip, could not be read for this summary. The build-to-print work depends on it. Download and review it before you price.“LBNL Response: Yes, see attached drawings and CAD files.” Response to Questions 1 - RFP MG-11182026.pdf, page 1
  • A failed first article counts as default. If LBNL rejects a first article or it arrives late, the subcontract treats it as a failure to deliver, which opens termination for default. Materials and production started before first article approval are at your own risk.“the University disapproves any first article, the Subcontractor shall be deemed to have failed to make delivery” 2) Sample SubK Rev. 1- RFP MG-11182026.pdf, page 12
  • Intent-to-bid date has already passed. The notice asked bidders to say whether they will bid by November 23, 2026, which is before today. The RFP does not show that a reply is required to bid. Ask the procurement contact whether you can still reply, and send your decision before the proposal deadline.“We request that all prospective suppliers acknowledge receipt of this notice and indicate whether they intend to submit a proposal by November 23, 2026.” Notice text

Key terms

Who can bidOpen to all. No set-aside. Size standard 750 or fewer employees.Complete the small business representation in the Representations and Certifications form.1) RFP-BVSS BENDB and BENDC Rev. 1.pdf, page 2
Contract periodDeliveries from 9/17/27 to 7/28/28; options to 11/17/28First article magnets are due 12/17/27. Option deliveries run to 11/17/28.2) Sample SubK Rev. 1- RFP MG-11182026.pdf, page 2
How they chooseBest overall value, not lowest price alonePrice is not weighted. Technical, quality and past performance factors are rated by adjectives.1) RFP-BVSS BENDB and BENDC Rev. 1.pdf, page 4
How to submitEmail to mggrausz@lbl.gov as separate volumesCover letter, technical volume and business volume go in separate files in MS Word, MS Excel, PDF or an approved format.1) RFP-BVSS BENDB and BENDC Rev. 1.pdf, page 3
Questions dueMonday, December 7, 2026, 3:00 PM Pacific TimeQuestions after this time may not be answered before proposals are due.Notice text
Contract typeFixed-price subcontractIssued under the University's Department of Energy prime contract. A total firm fixed price is required.2) Sample SubK Rev. 1- RFP MG-11182026.pdf, page 1
Site visitNot required; LBNL decides whether to visitNo mandatory site visit or pre-bid meeting is stated.3) AL-1977-2101B_SOW.pdf, page 9

How to respond

  1. Obtain the drawing package, the Representations and Certifications form, and the General Provisions from the notice files, since they were not readable here.
  2. Email one cover letter, one technical volume and one business volume, as separate files in Word, Excel or PDF, to mggrausz@lbl.gov by Monday, December 21, 2026, 3:00 PM Pacific Time. Use solicitation number MG-11182026 from the RFP, because SAM shows MG-11192026.
  3. In the technical volume, address Factors 1 to 5, a firm delivery schedule, up to three past-performance forms, your quality manual, and the completed AL-1208-0209 survey.
  4. In the business volume, include the signed Price Proposal Schedule with a firm fixed price, the Representations and Certifications form, a statement of no exceptions to the subcontract, and export control classification for each item.
  5. Send any questions by 3:00 PM Pacific Time on Monday, December 7, 2026, and send all other correspondence to the procurement representative only.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Dollar value of the base subcontract and of the options, since the price form has blank totals and a TBD lot quantity.
  • Whether you must still send the November 23, 2026 intent-to-bid reply, which has passed.
  • The text of the General Provisions for Commercial Supplies and Services and for the Foreign version, and which dated version applies, since sources give both 10/06/2026 and 10/09/2026.
  • The contents of the Technical Specification AL-1977-2097 and of the Representations and Certifications form, since neither could be reviewed here.
  • Whether price escalation, liquidated damages, warranty, insurance or bonding apply.
  • Whether LBNL will exercise the 15 optional magnets of each type, and when.

Notice text

Dear Prospective Offeror, See the attached Response to Question 2 related to this RFP. Thank you. Dear Prospective Offeror, See the attached Response to Question 1 related to this RFP. Thank you. Dear Prospective Offeror: The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in the Request for Proposal (RFP) No. MG-11182026, Advanced Light Source Upgrade (ALS-U) Storage Ring (SR) BENDB AND BENDC Magnets.

We request that all prospective suppliers acknowledge receipt of this notice and indicate whether they intend to submit a proposal by November 23, 2026. If your company does not intend to submit a proposal, please still acknowledge receipt of this notice and provide a brief explanation for the no-bid. The RFP and associated documents (listed below) are attached to this message. The documents are associated with the email address receiving this notification.

If this is not the correct email address, please notify me. RFP documents include: RFP and Proposal Instructions Sample Subcontract and its incorporated documents SOW General Provisions Commercial Supplies & Services, dated 10/09/2026 General Provisions for Commercial Supplies and Services (Foreign), Dated 10/06/2026 Price Proposal Schedule Attachment A Past Performance Reference Information Form Attachment B Representations & Certification Quality Evaluation Survey TIMELINE OF EVENTS Release RFP – November 18, 2026 Offeror Questions Due - December 7, 2026, 3:00 PM Pacific Time - submit via email to mggrausz@lbl.gov Proposals Due - December 21, 2026, 3:00 PM Pacific Time - submit via email to mggrausz@lbl.gov

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 26, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Energy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy