1. Opportunities
  2. Department of Veterans Affairs
  3. 36C24627Q0109

Animal lab airflow and pressure testing, Richmond VA

You would measure air changes per hour (ACH) and room pressure in lower-level research and animal laboratory rooms at the Richmond VA Medical Center, adjust existing HVAC controls where rooms fail, and report the results.

Official title: H141--Animal Lab Air Changes per Hour (ACH) & Pressure Testing

Deadline
Dec 7, 5:00 PM ET
11 days left
Who can bid
SDVOSB firms
Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Richmond, VA
Buyer: 246-Network Contracting Office 6 (36C246)

What they're buying

The listed base period is 11-24-2026 to 12-23-2026, which starts before quotes are due.

Top catches

NAICS and size standard conflict
“561210” 36C24627Q0109_1.docx

The SAM record and the price schedule list NAICS 238220, but the form lists 561210 with a $47 Million size standard. Check your size under the code the contracting officer confirms before you bid.

Base period starts before quotes are due
“POP Begin: 11-24-2026POP End: 12-23-2026” 36C24627Q0109_1.docx

The period of performance starts 11-24-2026, before the December 7 quote deadline. Award will likely come after the due date, so ask the contracting officer which dates will apply.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Measure supply, return and exhaust airflow in each designated room and calculate ACH.
  • Verify pressure differentials in each room against adjacent corridors and spaces.
  • Evaluate rooms that fail ACH or pressure criteria and make corrective adjustments with existing HVAC controls and balancing devices.
  • Retest adjusted rooms and deliver a final ACH and pressure report in PDF, with a deficiency summary and updated logs.
  • Have the report certified by a NEBB-certified TAB professional, and list repairs beyond adjustment as recommendations or additional services.
  • Supply all tools, equipment, labor, transport and supervision, and work only Monday to Friday, 8:00 am to 5:00 pm EST, excluding federal holidays.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • NAICS and size standard conflict. The SAM record and the price schedule list NAICS 238220, but the form lists 561210 with a $47 Million size standard. Check your size under the code the contracting officer confirms before you bid.
  • Base period starts before quotes are due. The period of performance starts 11-24-2026, before the December 7 quote deadline. Award will likely come after the due date, so ask the contracting officer which dates will apply.
  • SDVOSB status and subcontract cap. Only SBA-certified SDVOSBs listed in SAM can bid. You must sign the subcontract limit certificate and send it with your quote, and you may not pay more than 50% of the amount paid to you to firms that are not SDVOSBs or VOSBs.“The Government cannot award a contract to any quoter without this completed and executed clause.” 36C24627Q0109_1.docx
  • Site visit intent due early. Email your intent to attend by November 30, 2026, 4:00 pm EST. Only one visit date is planned, so if you miss the visit you will not get another.“Email your intention to attend to Natasha.Hawkins@va.gov on or before November 30, 2026, by 4:00 pm EST and instructions will be provided.” 36C24627Q0109_1.docx
  • Strict technical proposal limits. Your technical proposal must fit in 25 pages at 12-point minimum, in one PDF titled 'Technical Capability'. It must include NEBB certificates, three past performance references, a staffing plan and a schedule, and no pricing.“The proposal shall not exceed twenty-five (25) pages in length (minimum 12-point font).” 36C24627Q0109_1.docx
  • Wage determination not attached. Section D cites Wage Determination 2015-4313, but it is not in the attachment list. Ask the contracting officer for it before you price labor, because the service contract labor standards clause is included.“Wage Determination NO.: 2015-4313 Revision NO.: 35 Date of Last Revision: 8/11/2026” 36C24627Q0109_1.docx

Key terms

Who can bidSBA-certified SDVOSBs onlyYour firm must be designated in SAM as an SBA-certified service-disabled veteran-owned small business.36C24627Q0109_1.docx
Contract periodBase period 11-24-2026 to 12-23-2026The price schedule shows only this base period.36C24627Q0109_1.docx
How they chooseBest value: technical capability and priceTechnical quotes are compared without scores. Price is checked for fairness and reasonableness.36C24627Q0109_1.docx
How to submitEmail to Natasha.Hawkins@va.govSend the SF 1449, a Technical Capability PDF, and the signed subcontracting limit certificate.36C24627Q0109_1.docx
Questions dueFriday, November 27, 2026, noon ESTQuestions go by email only. Answers come as an amendment.36C24627Q0109_1.docx
Contract typeCommercial services, one line item (1 EA)The unit price and amount fields on the price schedule are blank.36C24627Q0109_1.docx
Site visitDecember 2, 2026, 1:00pm ESTEmail your intent to attend by November 30, 2026, 4:00 pm EST.36C24627Q0109_1.docx

How to respond

  1. Email your quote to Natasha.Hawkins@va.gov by Monday, December 7, 2026, 5:00 pm EST.
  2. Include a completed, signed and dated SF 1449 with your name, address, telephone number and UEI.
  3. Include one searchable PDF titled 'Technical Capability' with numbered pages, 25 pages maximum, no pricing, NEBB certificates, three past performance references, and the position titles of staff who need physical access.
  4. Include the signed VA limitations on subcontracting certificate (852.219-75) and your price for item 0001 on the price schedule in Section B.2.
  5. If you plan to attend, email your intent to Natasha.Hawkins@va.gov by November 30, 2026, 4:00 pm EST for the December 2, 2026, 1:00pm EST site visit.

Attached files

From SAM.gov. Download links open the original files.

  • 36C24627Q0109_1.docxThis is the full solicitation, including the SF 1449 cover, statement of work, clauses and quoter instructions; you must complete the SF 1449 and sign the subcontracting limit certificate, and read the rest. Read.

Not stated in what we read

  • Whether an option period exists, since the price evaluation adds six months for an option but the price schedule shows only the base period.
  • The text of Wage Determination 2015-4313, which is cited but not attached.
  • Which contract dates will apply, since the base period starts before quotes are due.
  • The estimated value or budget for the work.
  • The background investigation risk tier for staff, since the tier fields in the clause are blank.
  • The delivery date and whether any items will be delivered, since the delivery date reads TBD and the delivery terms look copied from a supply contract.

Notice text

ACH & Pressure Testing

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 26, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy