Checkpoint CT screening systems, Springfield, VA
TSA plans a competitive solicitation, limited to current BOA holders, for three sizes of CT checkpoint screening systems, with Springfield, VA as the place of performance.
Official title: Anticipated Fiscal Year 2027 Checkpoint Property Screening System (CPSS) Procurement Approach
- Deadline
- Dec 1, 2:00 PM ET
- 6 days left
- Last time
- $16.9M
- Likely Idemia Identity & Security USA LLC
- Place
- Springfield, VA
- Buyer: Security Technology
What they're buying
Before proposing, vendors must pass a three-phase test of seven required capabilities, with milestones from 12/7/2026 to 1/29/2027; the contract length and value are not stated.
Top catches
“12/7/2026” Attachment 1_TSA25-04-0650.pdf, page 2
The SAM.gov response deadline is Tuesday, December 1, 2026 at 14:00 (-05:00), but the attachment sets the Phase 1 milestone for 12/7/2026. Treat 12/1 as the earliest date until TSA confirms which governs.
“among current Basic Ordering Agreement (BOA) holders” Notice text
Only current Basic Ordering Agreement holders may bid, and the CT systems must be qualified under the QPL. Check both before you spend money on Phase 1.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Three CT system sizes (base, mid and full) under QPL window 70T04019CPSSQPL-3, using Base Window-3 Increment-1, Mid Window-1 Increment-1 and Full Window-2 Increment-1.
- Seven MVP capabilities, each approved before proposal: prohibited items algorithm with image on alarm, 6.2 Level 1 Low PFA explosives algorithm, ASTRO and TRS connections, Linux upgrade, dual PVS, and cyber remediation at least 50% compliant by Phase 1.
- Phase 2 (due 1/15/2027): a full-size CPSS CT system at the TSIF with all seven capabilities installed, passing testing on every one.
- Phase 3 (due 1/29/2027): a single ECP matching the Phase 2 tested configuration, plus a proposal. Proposal format is to come in the solicitation.
Who supplied it lately
$16.9M
on a recent contract for the same kind of product: Idemia Identity & Security USA LLC. It ended Sep 29, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Deadline conflicts with Phase 1. The SAM.gov response deadline is Tuesday, December 1, 2026 at 14:00 (-05:00), but the attachment sets the Phase 1 milestone for 12/7/2026. Treat 12/1 as the earliest date until TSA confirms which governs.
- Current BOA holders with QPL systems. Only current Basic Ordering Agreement holders may bid, and the CT systems must be qualified under the QPL. Check both before you spend money on Phase 1.
- All seven capabilities before proposal. You must hold an approved RFD, algorithm certification, or DEP (where applicable) for each of the seven capabilities by the Phase 1 date. Missing any one bars you from Phase 2, so assess your gaps now.“for each MVP Capability will not be eligible to move to Phase 2” Attachment 1_TSA25-04-0650.pdf, page 4
- One failed capability ends the bid. Phase 2 requires a Pass on all seven capabilities. A single Fail means no Phase 3 and no award consideration. Test each capability fully before you enter Phase 2.“An Offeror will receive an overall Fail rating if any required MVP capability does not receive a Pass rating.” Attachment 1_TSA25-04-0650.pdf, page 5
- No questions to TSA. TSA will not answer questions about this draft. Plan around the dates and rules as written, and watch sam.gov for the final solicitation.“TSA will not be accepting or responding to vendor questions related to this draft pre-solicitation notice.” Notice text
- Full-size system at TSIF. Phase 2 requires you to provide a full-size CT system at the TSIF with all seven capabilities installed. The draft does not say who pays for it or whether TSA provides any equipment, so price this into your plan.“updated full-size CPSS CT system at the TSA Systems Integration Facility (TSIF)” Attachment 1_TSA25-04-0650.pdf, page 4
Key terms
| Who can bid | Current BOA holders onlyNo set-aside is used. The CT systems must also be qualified under the QPL.Notice text |
|---|---|
| Questions due | No questions acceptedTSA will not answer vendor questions about this draft notice.Notice text |
How to respond
- Confirm you are a current BOA holder and that your CT systems are, or will be, qualified under QPL window 70T04019CPSSQPL-3 per FAR 52.209-1.
- Gather evidence for all seven MVP capabilities, including approved RFD, certification or DEP documents and cyber remediation records showing at least 50% compliance, ready for the Phase 1 milestone.
- Submit Phase 1 documentation by 12/7/2026 or earlier. The submission method, address and format are not stated in this draft; they will be in the solicitation on sam.gov.
- Phase 2: have an updated full-size CPSS CT system at the TSIF with all seven capabilities installed by 1/15/2027. TSIF access instructions will come in the solicitation.
- Phase 3: submit a single ECP for the Phase 2 configuration and your proposal by 1/29/2027. Proposal content and format are not stated yet.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 1_TSA25-04-0650.pdfThe draft procurement approach that sets out the seven MVP capabilities, three test phases and milestone dates. It is a draft, so you must read it closely; you do not fill it in or sign it. Read.
Not stated in what we read
- Contract value and period of performance are not stated.
- Whether the 12/1/2026 SAM.gov date or the 12/7/2026 Phase 1 date governs, and when the final solicitation will be issued.
- Who pays for the full-size system at the TSIF and whether TSA provides any test equipment.
- Phase 1 submission method, address and format.
- Award basis and proposal evaluation method.
- Location of the TSIF and how vendors get access.
Notice text
The Transportation Security Administration (TSA) anticipates issuing a competitive solicitation among current Basic Ordering Agreement (BOA) holders for all three sizes of Computed Tomography (CT) systems as outlined under Qualification Product List (QPL) window 70T04019CPSSQPL-3, Base Window-3 Increment-1, Mid Window-1 Increment-1, and Full Window-2 Increment-1. The proposed CT systems must be qualified under the associated QPL in accordance with FAR 52.209-1 -- Qualification Requirements.
In preparation for the upcoming solicitation, this announcement is being provided to inform BOA holders of the anticipated steps that must be met, to participate in the procurement. The attached draft procurement approach and the milestone dates are subject to change. All vendors should monitor sam.gov for final dates, submission instructions, and the final procurement approach. Additional information is provided in the attachment, “Attachment 1_TSA25-04-0650.”
TSA will not be accepting or responding to vendor questions related to this draft pre-solicitation notice.
As published on SAM.gov.
Contacts
- Megan Kesler, megan.kesler@tsa.dhs.gov
- David Taylor, david.taylor1@tsa.dhs.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Transportation Security Administration for the same kind of product (NAICS 334511, product code 6350) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 17, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 1, 2:00 PM ET6 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 334511, search, detection, navigation, guidance, aeronautical, and nautical system and instrument manufacturing, soonest deadline first.
- Department of the NavyNavy undersea warfare system support extension, Reston, VA
- Department of the Air ForcePCM330E telemetry encoders, Kirtland AFB, NM
- Defense Logistics AgencyGas area monitors and sensors, Bremerton, WA
- Defense Logistics Agency13 servocylinders for DLA Aviation, Philadelphia, PA
- Defense Logistics Agency14 servocylinders for DLA Aviation, Philadelphia, PA
- Defense Logistics Agency12 servocylinders for DLA Aviation, Philadelphia, PA
- Department of Veterans AffairsFY27 Vocera Annual Service Task Order (Legacy VISN 5) (VA-27-00012318)
- Department of the ArmyDoppler GPS navigation parts, Aberdeen Proving Ground, MD
Free · at most one email a morning
Get new notices from Transportation Security Administration by email
Each morning we'll send the new solicitations and sources-sought notices from Transportation Security Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy