Environmental cleanup at three Air Force sites in AZ and NV
Environmental remediation at 17 Installation Restoration Program (IRP) sites and 10 Military Munitions Response Program (MMRP) sites at AF Plant 44 (AZ), Davis-Monthan AFB (AZ) and Nellis AFB (NV), for an estimated 3,650 calendar days (10 years) and $20,000,000.
Official title: ARIZONA-NEVADA GROUP OPTIMIZED REMEDIATION CONTRACT
- Deadline
- Dec 18, 2:00 AM PT
- 23 days left
- Who can bid
- Small businesses
- Size standard for NAICS 562910: $25 million in average annual receipts; exceptions apply · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: W075 Endist Los Angeles
What they're buying
This is a presolicitation notice, and the government is not yet committed to a solicitation.
Top catches
“Those firms who plan on attending these site visits MUST provide all requested information by 1500 on 27 NOV 2026.” Notice text
If you want to attend, email both contacts with your attendee list by 1500 on 27 November 2026. The notice gives no time zone, so ask which one applies. Attendees need photo ID on site.
“Solicitation should be advertised by 31 December 2026.” Notice text
The SAM.gov record sets a response deadline of 02:00 Pacific on 18 December 2026, but the notice says the solicitation will be advertised by 31 December. Ask the contracting officer what the 18 December date covers, and watch SAM.gov for a changed date.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Remediate 17 IRP sites and 10 MMRP sites to meet the performance objectives in Table 1.
- Investigate, design, build remedial systems, and run operation and maintenance of established remedies.
- Maintain wells: semi-annual inspections, repairs, replacements, and approved abandonment; keep land use control signage in place.
- PFAS work: test and dispose of waste under Air Force guidance, with EPA Method 1633 analysis at listed sites.
- Build performance models and exit strategies, and submit annual Performance Model Evaluation Reports.
- Remove ordnance and dispose of hazardous waste; submit monthly status reports, IMS and MPS updates.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Site visit sign-up closes 27 Nov. If you want to attend, email both contacts with your attendee list by 1500 on 27 November 2026. The notice gives no time zone, so ask which one applies. Attendees need photo ID on site.
- Deadline and solicitation dates conflict. The SAM.gov record sets a response deadline of 02:00 Pacific on 18 December 2026, but the notice says the solicitation will be advertised by 31 December. Ask the contracting officer what the 18 December date covers, and watch SAM.gov for a changed date.
- US citizens with background checks only. Every person you send to AFP 44 must be a US citizen and pass the Raytheon background check. Check your crew before you price the job. Drivers also need insurance and a test.“All personnel must be US Citizens and pass the Raytheon background check.” (DRAFT) AZ-NV Group (FY27) ORC_PWS_v8.2.7_202601014_Clean.pdf, page 33
- Paid only after milestones are met. You will not be paid until each milestone is achieved, and partial payments are not approved. Progress payments are disallowed, so plan cash flow for regulator review times.“The Contractor will not receive payment until milestones are achieved in accordance with the MPS.” (DRAFT) AZ-NV Group (FY27) ORC_PWS_v8.2.7_202601014_Clean.pdf, page 26
- You carry the cost of missing goals. You take contractual liability for reaching every performance objective. You also pay all repair costs when a remediation system stops running. Price this risk in before you bid.“The ORC Contractor shall assume contractual liability and responsibility for achieving the POs.” (DRAFT) AZ-NV Group (FY27) ORC_PWS_v8.2.7_202601014_Clean.pdf, page 7
- You pay the AFP 44 power bill. You pay the electric bill for the AFP 44 treatment plant and well field. You also pay all hazardous waste disposal costs. Add both to your price.“AFP44: Paying the cost of electric utilities for power to the treatment plant and well field to Raytheon.” (DRAFT) AZ-NV Group (FY27) ORC_PWS_v8.2.7_202601014_Clean.pdf, page 18
Key terms
| Who can bid | Small businesses only (total small business set-aside)The notice does not give the size standard for NAICS 562910.SAM.gov record |
|---|---|
| Contract period | 10 years (3,650 calendar days)The performance period starts at award of the first performance Sub-CLIN.Notice text |
| How they choose | Best value trade-off (anticipated)The notice expects a Request for Proposals. Evaluation factors are not given.Notice text |
| Estimated value | $20,000,000Project estimated value stated in the notice.Notice text |
| Contract type | Performance-based, paid by milestonesThe notice does not state whether the price is fixed or cost-based.(DRAFT) AZ-NV Group (FY27) ORC_PWS_v8.2.7_202601014_Clean.pdf, page 42 |
| Site visit | Arizona sites on 8 Dec 2026; Nellis AFB on 10 Dec 2026Attendance is highly encouraged but not required. Times and places are not yet set.Notice text |
How to respond
- Email contracting officer michael.g.robinson@usace.army.mil and contracting specialist Ashley.S.Powell@usace.army.mil by 1500 on 27 NOV 2026 (time zone not stated) if you want a site visit seat. List up to 5 people in priority order with the required details.
- Attend the Arizona site visit on 8 December 2026 (AF Plant 44 and Davis-Monthan AFB) or the Nellis AFB visit on 10 December 2026. Bring photo ID. Meeting times and places are not yet set.
- Watch for the solicitation, which the notice says will be advertised by 31 December 2026. The notice does not state how proposals must be submitted, in what format, or with what page limits.
- Confirm with the contracting officer whether the 18 December 2026 deadline at 02:00 (-08:00) applies to proposals, interest, or something else. The notice does not say.
Attached files
From SAM.gov. Download links open the original files.
- (DRAFT) AZ-NV Group (FY27) ORC_PWS_v8.2.7_202601014_Clean.pdfA 54-page draft performance work statement describing the work at all three sites. It is for reading only, and you do not sign or fill in anything in it. Read.
Not stated in what we read
- Evaluation factors and their weights for the best value trade-off.
- How, where, and in what format proposals must be submitted, and any page limits.
- Whether the contract is fixed price or cost-based, and the milestone amounts.
- Exact site visit times and meeting places.
- The small business size standard that applies to NAICS 562910.
- Whether the 18 December 2026 deadline changes once the solicitation is posted.
Notice text
Be advised that this is only a pre-solicitation notice. This notice does not commit the government to a solicitation nor is it a request for proposals or an invitation for bids. Solicitation should be advertised by 31 December 2026. Location of this work has Multiple Places of Performance: Air Force Plant 44, AZ; Davis-Monthan Air Force Base, AZ and Nellis Air Force Base, NV. Project estimated value: $20,000,000. Estimated duration of the project: 3650 Calendar Days (10 years).
This requirement is for environmental remediation activities at Air Force Plant (AFP) 44, Davis-Monthan Air Force Base (AFB), and Nellis AFB; site restoration under the Optimized Remediation Contract (ORC). The range of activities includes investigation, design, construction of remedial systems, operation and maintenance of established remedies, optimization at applicable sites, and achievement of site-specific objectives. The Contractor shall undertake Environmental Remediation activities to achieve Performance Objectives (POs) at seventeen (17) Installation Restoration Program (IRP) sites and ten (10) Military Munitions Response Program (MMRP) sites.
The government is anticipating a Best Value Trade Off, Request for Proposals (RFP) Be advised that the government is planning a pre-proposal site visit. Although firms do not have to attended the site visit to submit a proposal, it is highly encouraged that if firms plan on submitting a proposal that they attend the site visit. Both Arizona locations (AF Plant 44 and David Monthan AFB) will both be on 8 December 2026. Then the site visit for Nellis AFB in Nevada will be on 10 December 2026.
At this time we are unsure of the exact meeting locations and time, but this information will be provided as soon as it is available. Offerors who are interested in attending these site visits should email both the Contracting Officer, michael.g.robinson@usace.army.mil and the Contracting Specialist Ashley Powell Ashley.S.Powell@usace.army.mil. Although the official RFP will not be issued by the time the site visit occurs, the government feels it is in the best interest of all parties that the site visit be conducted as soon as possible so that potential offerors will be better positioned to submit their proposals.
Depending on the reception that we get from interested vendors, space may be limited, when you email, please indicate up to 5 personnel that you would like to bring, with a ranking of priority. The government will make the determination is all 5 can be allowed, or if it must be reduced. Required information for EACH personnel: First, Middle, and Last Name, Organization Organization Address US Citizen Any dual citizenship? If so, where to? Cell phone number Work email And Photo ID is required when onsite to verify identity.
Those firms who plan on attending these site visits MUST provide all requested information by 1500 on 27 NOV 2026. If additional information is needed, the government will post it here, or reach out to the firms who respond directly. For your convenience we are also providing a DRAFT PWS, so that offerors can familiarize themselves with the upcoming work before the site visit.
As published on SAM.gov.
Contacts
- Ashley Powell, ashley.s.powell@usace.army.mil, 2134523241
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 18, 2:00 AM PT23 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 562910, remediation services, soonest deadline first.
- Department of Veterans AffairsAsbestos abatement at Montrose VA Medical Center, NY
- National Institutes of HealthSources Sought Notice: Asbestos and Lead Management Services
- Department of Veterans AffairsContaminated soil removal and disposal, Los Angeles, CA
- Department of the ArmyPFAS cleanup investigation and study, Monterey, CA
- Departmental OfficesAsbestos stockpile removal in Yuma County, AZ
- Departmental OfficesMold cleanup at Merritt Island refuge, Titusville, FL
- Departmental OfficesGasoline tank site cleanup at Putah Creek, Napa, CA
- Environmental Protection AgencyEmergency and rapid response services, Atlanta, GA
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy