1. Opportunities
  2. Architect of the Capitol
  3. AOCSSB

Automatic door maintenance, Senate office buildings, DC

The Architect of the Capitol wants a contractor to inspect, maintain, repair and report on all automatic door operators in the Hart, Dirksen and Russell Senate Office Buildings in Washington, DC.

Official title: Automatic Door Operator (ADO) Inspection and Maintenance Program

Deadline
Dec 21, 10:00 AM ET
25 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Washington, DC
Buyer: Acquisition & Material Man. Div.

What they're buying

The work is a firm-fixed-price contract with a 12-month base year and four one-year options.

Top catches

Submission method conflicts
“Ford House Building Room H2-263” AOCSSB27Q0011.pdf, page 1

Section L says to email the quote to Tatjana Johnson, but the SF-33 cover gives a physical office for offers. Ask the CO in writing which method applies before the deadline.

Emergency work missing from price sheet
“Emergency services excluded” J.3 Price Template.xlsx

The price sheet says emergency services are excluded, yet the PWS requires emergency repairs and Section L requires a completed price template. Ask the CO how emergency work is priced before you finish Volume II.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 15 of 17 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Routine inspection and preventive maintenance of every automatic door operator in the three Senate office buildings, including lubrication, adjustments, calibration, and force and speed tests to ADAAG 404 and ANSI/BHMA A156.10.
  • Emergency service: dispatch to calls and restore doors to full operation within five business days, unless delayed by parts lead time. Replacement parts are included in scope.
  • Records: a service ticket within 48 hours of each visit, service logs, a quarterly maintenance report, annual compliance and service reports, and an asset inventory with model and serial numbers.
  • Deliverables: kick-off meeting 7 days after award, Quality Control Plan within 15 days, Project Management Plan within 30 days, and a Transition-Out Plan 90 days before contract end.
  • Performance targets: 100% of preventive inspections on time, 95% of repairs within five business days, and system-wide operational availability of at least 98%.
  • Optional replacement of a door operator, quoted separately and added by contract modification.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Submission method conflicts. Section L says to email the quote to Tatjana Johnson, but the SF-33 cover gives a physical office for offers. Ask the CO in writing which method applies before the deadline.
  • Emergency work missing from price sheet. The price sheet says emergency services are excluded, yet the PWS requires emergency repairs and Section L requires a completed price template. Ask the CO how emergency work is priced before you finish Volume II.
  • Wage determination not in our copy. The Service Contract Act applies, so pay rates come from a wage determination we could not review. You must download it from SAM.gov and price labor against it before you quote.“SERVICE CONTRACT ACT (SCA)” J.8 Employee Right on Government Contracts.pdf, page 1
  • Badging and background checks first. Every employee must complete E-Verify, a Capitol Police background-check form and AOC badging before any on-site work. Plan for this lead time before you commit staff to a start date.“Complete the AOC contractor badging process before performing any on-site work.” J.1 ADO Inspection PWS.pdf
  • Inspection interval conflicts. The PWS says inspections every 6 months, while the QASP says once every 12 months. Ask the CO which interval applies and price the more frequent schedule until the CO confirms.“(every 6 months per contract year.)” J.1 ADO Inspection PWS.pdf, page 4
  • Emergency response clock unclear. Task 2 gives 48 hours to dispatch for calls before 9:00 AM ET and 72 hours after, counted from notification. The performance standard says 48 hours, counted from technician arrival. Ask which clock applies and staff for the shorter one.“Emergency dispatch shall occur within 48 hours in no less than 95% of service calls.” J.1 ADO Inspection PWS.pdf, page 11

Key terms

Who can bidOpen to all businesses, no set-asideThe size standard for NAICS 238290 is not stated in the notice.SAM.gov record
Contract period12-month base year plus four 1-year optionsThe Government may also extend up to six months under FAR 52.217-8 at the rates in effect.J.1 ADO Inspection PWS.pdf, page 11
How they chooseLowest price technically acceptableTechnical approach, key personnel and past performance are rated Acceptable or Unacceptable. Section M also says the non-price factors combined equal price, which conflicts with this.J.2 Instructions to Quoters and Basis for Award.pdf, page 5
How to submitEmail to Contracting Officer Tatjana Johnson at tatjana.johnson@aoc.gov, in two separate volumesThe SF-33 cover also lists a physical office for offers. See the catches.J.2 Instructions to Quoters and Basis for Award.pdf, page 1
Questions dueMonday, December 7, 2026, 2:00 PM ETSend questions by email using Attachment J.4. Answers come as an amendment.Notice text
Contract typeFirm-fixed-priceThe contract includes FAR 52.222-43, a price adjustment clause for service labor standards, so wage changes may be adjusted.J.1 ADO Inspection PWS.pdf, page 11

How to respond

  1. Email Tatjana Johnson at tatjana.johnson@aoc.gov and Lily Najera at lily.najera@aoc.gov to request access to Attachment J.1.1 Senate ADO Locations, which is released only after approval.
  2. Send written questions by email by December 7, 2026, at 2:00 PM ET, using Attachment J.4 and the subject line AOCSSB27Q0011_ Company Name Questions.
  3. Build Volume I with no pricing: introductory letter 1 page, technical approach 4 pages, key personnel 3 pages excluding resumes, and past performance 3 pages. Build Volume II with the completed Price Template and page 1 of SF-18.
  4. Ask the CO in writing whether to email or hand-deliver the quote. Then email both volumes as separate files, each email under 10 MB, with the subject line AOCSSB27Q0011_ Company Name Quotation, by Monday, December 21, 2026, at 10:00 AM ET.
  5. Have each of your three past performance references email its questionnaire directly to Tatjana Johnson by the same deadline.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated contract value or budget.
  • Number and locations of door operators, which are in Attachment J.1.1 and not yet released.
  • Service Contract Act wage rates and fringe benefits, in the wage determination we could not review.
  • Insurance minimums, which sit in clause AOC52.228-2 on pages we could not review.
  • How emergency services will be priced, since the price sheet excludes them.
  • Size standard for NAICS 238290 and whether you must meet it to bid.

Notice text

The Contractor shall provide all labor, supervision, management, materials, tools, equipment, transportation, documentation, and incidental services necessary to inspect, maintain, repair, document, and report on all Hart, Dirksen, and Russell Senate Office Buildings Automatic Door Operator (ADO) units. Attachment J.1.1 Senate ADO Locations will be provided on Kiteworks once approved for release. Contractors shall email both the Contracting Officer Tatjana Johnson (tatjana.johnson@aoc.gov) and Contract Specialist Lily Najera (lily.najera@aoc.gov) for access to the attachment only if you intend to submit a quotation. Questions about the technical or contractual details of this procurement must be submitted in writing via e-mail by December 7, 2026, at 2:00 PM ET. Quotations must be received no later than December 21, 2026, at 10:00 AM ET.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Architect of the Capitol by email

Each morning we'll send the new solicitations and sources-sought notices from Architect of the Capitol, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy