1. Opportunities
  2. Department of Justice
  3. Drug Enforcement Administration
  4. 15DDHQ27R00000001

Building condition report at DEA hangar, Fort Worth, TX

DEA wants a building condition assessment and Building Engineering Report for its Aviation Operations Center at 2300 Horizon Drive, Fort Worth, Texas, covering a 155,238 square foot hangar and office building, a pump house, and a guard shack on about 12.3 acres.

Official title: Aviation Operations Center (AOC)- Building Engineer Report (BER)

Deadline
Dec 4, 10:00 AM ET
8 days left
Who can bid
Small businesses
Size standard for NAICS 541350: $11.5 million in average annual receipts · Who qualifies
Last time
$163K
Likely Volter Electrical Construction Corp
Place
Fort Worth, TX
Buyer: Office Acquisition Management

What they're buying

The work runs from 12/13/2026 to 12/12/2027 and is priced in labor-hour line items, and the required site visit on November 17, 2026 has already passed.

Top catches

Site visit has already passed
“Proposals submitted by Offeror's who did not attend the site visit will be deemed non-responsive and will not be considered.” A28 RFQ - 15DDHQ27R00000001.pdf, page 2

The notice says proposals from firms that did not attend the site visit will be deemed non-responsive. If your company did not attend on November 17, 2026, you likely should not bid.

U.S. citizens only; security vetting
“Only U.S. citizens, by birth or naturalized, shall be permitted to perform services on this contract.” A28 RFQ - 15DDHQ27R00000001.pdf, page 69

Only U.S. citizens may perform services, and each worker must pass DEA background checks. Personnel data is due 10 business days before work starts, and contractors must be cleared two weeks before any site access, so start clearances now.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 3 of 3 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Pre-inspection meeting, then a survey and visual inspection of the whole building, grounds, and systems, with no destructive testing.
  • Inspect roofing, HVAC, electrical, plumbing, life safety, elevator, ADA features, exterior, interior, structure, hazardous materials, and seismic items.
  • Provide a trip report 2 weeks after inspection, a draft BER 30 days after inspection, and a final BER 2 weeks after the review meeting.
  • Priced repair list with cost estimates, photos, floor and room locations, and priority ratings 1 to 5, plus an O&M plan and energy items.
  • Labor hours: project manager 104, project architect 32, civil engineer 66, structural engineer 64, mechanical engineer 94, fire protection engineer 62, electrical engineer 94 (516 total).
  • Lines 0001 to 0003 are one unit each: contract BER services, additional consultant and elevator services, and travel/reimbursable items.

Who did it before

$163K

on the contract that likely holds this work now: Volter Electrical Construction Corp. It ends May 31, 2027.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • Site visit has already passed. The notice says proposals from firms that did not attend the site visit will be deemed non-responsive. If your company did not attend on November 17, 2026, you likely should not bid.
  • U.S. citizens only; security vetting. Only U.S. citizens may perform services, and each worker must pass DEA background checks. Personnel data is due 10 business days before work starts, and contractors must be cleared two weeks before any site access, so start clearances now.
  • Service wage rates apply. Wage determination 2015-5231, revision 34, dated Aug 22, 2026 applies to this contract, so your labor rates must meet it. The wage determination itself is not in the text we could review, so get it from SAM.gov before you price.“the minimum monetary wages and fringe benefits applicable to this contract are” A28 RFQ - 15DDHQ27R00000001.pdf, page 37
  • Two volumes, 20-page limit. Technical and business volumes are scored separately, so missing content in either volume is not considered. The technical volume is capped at 20 single-sided pages, double-spaced, in Times New Roman 12-point; extra pages are disregarded.“not exceeding 20 pages, single sided.” A28 RFQ - 15DDHQ27R00000001.pdf, page 8
  • Deadline moved; time zone conflicts. Amendment 0001 moved the deadline to Friday, December 4, 2026 at 10:00 a.m. The body still says November 30 at 10:00 am EDT, while the SAM record uses -05:00. Use the amended date, send early, and keep proof of delivery.“The purpose of amendment number 0001 is to extend the due date offers are due to 12/04/2026 at” A29 Amendment 0001.pdf, page 1
  • Price weighting unclear. The notice says non-price factors together matter much more than price, yet also says the lowest-priced offer may win. Questions closed November 24, so you cannot clarify this; plan to be strong on both technical factors and price.“The Government may or may not award the lowest priced Offeror or highest technically rated Offeror.” A28 RFQ - 15DDHQ27R00000001.pdf, page 11

Key terms

Who can bidSmall businesses only (100% small business set-aside)The size standard for NAICS 541350 is not stated in the text. Only U.S. citizens may perform services.A28 RFQ - 15DDHQ27R00000001.pdf, page 2
Contract period12/13/2026 to 12/12/2027 (CLINs 0006 and 0007 end 12/13/2027)The pricing sheet shows one period. Option years are not stated.A28 RFQ - 15DDHQ27R00000001.pdf, page 4
How they chooseSingle firm fixed price award on best value; government may award to no oneAll non-price factors together are significantly more important than price, but the notice also says the lowest price may win.A28 RFQ - 15DDHQ27R00000001.pdf, page 7
How to submitEmail to Jose.L.Marin@dea.gov with RFP number 15DDHQ27R00000001 in the subject lineTwo volumes are required. Late submissions are not accepted.A28 RFQ - 15DDHQ27R00000001.pdf, page 2
Questions dueNovember 24, 2026, 10:00 AM EDT (passed)Questions must be in writing and identify the section and page. Late questions are not considered.A28 RFQ - 15DDHQ27R00000001.pdf, page 2
Contract typeFirm fixed price purchase order under FAR Part 12The government intends to issue a single purchase order to one offeror.A28 RFQ - 15DDHQ27R00000001.pdf, page 2
Site visitRequired; was November 17, 2026 at 9:00 am CST (passed)The facility access form was due by November 12, 2026 at 1:00 pm CST, which has also passed.A28 RFQ - 15DDHQ27R00000001.pdf, page 2

How to respond

  1. Confirm that your company attended the November 17, 2026 site visit, since the notice says non-attendees will be deemed non-responsive.
  2. Email your proposal to Jose.L.Marin@dea.gov by Friday, December 4, 2026 at 10:00 a.m. (time zone -05:00 per SAM record), with 15DDHQ27R00000001 in the subject line.
  3. Send Volume 1 Technical (20 pages maximum, factors 1 to 3, with resumes for each key person) and Volume 2 Business as separate files in Microsoft Office and Adobe formats.
  4. Volume 2 must include the price for every line with totals, company name, address, point of contact, UEI, CAGE code, GSA Schedule number and SIN, business size, the DEA-2852.209-70 conflict of interest statement, and any SAM certification changes.
  5. Your offer must stay open for at least 45 calendar days after the due date.

Attached files

From SAM.gov. Download links open the original files.

  • A28 RFQ - 15DDHQ27R00000001.pdfThe main solicitation with instructions, statement of work, evaluation rules, pricing sheet, and clause matrix; you must fill in the pricing schedule and business quote. Pages 38 to 61 were not provided, so we could not review them and you must read them on SAM.gov. Read in part (pages 1–37 and 62–81 of 81).
  • Attachment I - Facility Access Request Form.pdfA form for each visitor requesting facility access, though its text is an authorization for agency record checks that asks for SSN, date of birth, driver's license, race, sex, and citizenship. It must be completed, signed, and presented at least 24 hours before a visit, and the notice's November 12, 2026 deadline has passed. Read.
  • A29 Amendment 0001.pdfA notice that extends the offer due date to December 4, 2026 at 10:00 a.m. and changes nothing else; you must read it, and the form does not make clear whether you must sign and return it. Read.

Not stated in what we read

  • Estimated contract value: not stated.
  • Business size standard for NAICS 541350 (revenue or employee limit): not stated.
  • Contents and rates in wage determination 2015-5231, revision 34: not in the text we could review.
  • Whether DEA will allow a late site visit or make an exception for firms that did not attend: not stated.
  • Whether DEA furnishes any workspace, equipment, or property: the statement of work says the contractor furnishes all facilities and equipment, and no government-furnished list appears in the text.
  • How long DEA security approval takes and whether it can be completed before the 12/13/2026 start date: not stated.

Notice text

This is a combined synopsis/solicitation for commercial service prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes as the only solicitation; proposals are being requested, and a written solicitation will not be issued. This solicitation number 15DDHQ27R00000001 is being used as a Request for Proposal (RFP). This will be solicited under FAR 12 Acquisition of Commercial Products and Commercial Services. See attached for details. Extend offers due date.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at Drug Enforcement Administration for the same kind of work (NAICS 541350, service code H156) in Texas that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

ContractObligatedEndsState
Title: Epic - Building Engineer Report (Ber)Volter Electrical Construction Corp · 15DDHQ26P00000587$162,842May 31, 2027in 6 monthsTX

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 26, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Drug Enforcement Administration by email

Each morning we'll send the new solicitations and sources-sought notices from Drug Enforcement Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy