AZ BL COLO 7528(1) Burro Creek Road
Open, due tomorrow
- Deadline
- Nov 17, 2:00 PM MT
- Notice type
- Solicitation
- Set-aside
- Small business set-asideOnly small businesses under the size standard for the NAICS code can bid (FAR 19.5).
- Industry
- Highway, Street, and Bridge ConstructionNAICS 237310, Construction
- Place of performance
- Kingman, AZ
- Buying office
- 6982AF Central Federal Lands DivisiOffice 6982AF, Federal Highway Administration
- Solicitation number
- 6982AF27B000002
- Product or service code
- Y1LB
- Posted
- Nov 12, 2026
- Source
- SAM.govVersion 1, last change seen Nov 16, 2026, 4:30 AM UTC
Notice text
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Eric Grosskreuz, cflcontracts@dot.gov
- Kelly Palmer, CFLcontracts@dot.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 16, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Other open notices in highway, street, and bridge construction
| Notice | Set-aside | Place | Due |
|---|---|---|---|
| Acadia National ParkFederal Highway Administration | Small business | ME | Nov 17Due tomorrow |
| Access Control Point (ACP) Active Vehicle Barrier (AVB) Systems and Guard BoothsDepartment of the Army, sources sought | None | Fort Lee, VA | Nov 182 days left |
| Asphalt Services at Carr Creek LakeDepartment of the Army | Not stated | Not stated | Nov 182 days left |
| Dugway Proving Ground (DPG) Horizontal Facility Construction Road MaintenanceDepartment of the Army | 8(a) | Dugway, UT | Nov 182 days left |
| UT NP ARCH 100(2) Bridges on Delicate Arch RoadFederal Highway Administration | None | Moab, UT | Nov 193 days left |
| Paving Acquisition Vehicle - Rockies (PAV-R) IDIQ Sources SoughtDepartment of the Air Force, sources sought | Small business | Colorado Springs, CO | Nov 204 days left |
| Administrative Parking Lot RepairsForest Service | Small business | CO | Nov 237 days left |
| Z Maca - Vc Bridge RepairDepartmental Offices, sources sought | Not stated | Mammoth Cave, KY | Nov 237 days left |
Get new notices from Federal Highway Administration by email
Each morning we send the new solicitations and sources-sought notices from Federal Highway Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.