Bat removal and attic insulation at Fort Meade, SD
The Black Hills VA Health Care System wants bat removal, permanent exclusion, guano cleanup and new cellulose attic insulation in Building 65 at Fort Meade, South Dakota.
Official title: S207--BHVAHCS Building 65 Bat Mitigation Sources Sought
- Deadline
- Nov 30, 12:00 PM CT
- 4 days left
- Who can respond
- Any business
- Market research, not a bid
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Fort Meade
- Buyer: Network Contract Office 23 (36C263)
What they're buying
This is a sources sought for market research only, and no contract will be awarded from this notice; send your capability and contact details by email by November 30, 2026.
Top catches
“Only emailed responses will be considered.” Notice text
Send your response by email to Jeffrey.Brown8@va.gov. Confirm it reaches the contracting officer before the deadline and keep proof that you sent it.
“Bat removal shall occur between February 1st, 2027 and April 15th, 2027.” Notice text
Bat removal must happen between February 1 and April 15, 2027, and guano work must finish by June 15, 2027. Confirm your crew and schedule can meet these dates before you price the job.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Remove bat colonies from the attic of Building 65, a 2-story building with an attic above.
- Permanently exclude bats using one-way exit tubes, and seal entry points inside and outside, including metal roof areas.
- Remove bat guano and old insulation, bag contaminated material as hazardous waste, and dispose of it off site.
- Control dust under the infection control (ICRA) rules, and clean and disinfect the space.
- Install blown-in cellulose insulation rated R49 or higher after settling.
- Provide quality control, monthly quantity reports, and an on-site kick-off meeting after award.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Email is the only way to respond. Send your response by email to Jeffrey.Brown8@va.gov. Confirm it reaches the contracting officer before the deadline and keep proof that you sent it.
- Bat work fits a short window. Bat removal must happen between February 1 and April 15, 2027, and guano work must finish by June 15, 2027. Confirm your crew and schedule can meet these dates before you price the job.
- No contract is awarded from this notice. This notice is only market research, so you cannot bid on it yet. Respond only if you can do the work, and expect a later solicitation to set the real terms.“No awards of a contract will be made from this announcement.” Notice text
- Deadline uses Central Time. The deadline is set in Central Time, while the work hours are set in Mountain Time. Use the deadline exactly as written and send your email early.“11-30-2026 12:00 CENTRAL TIME, CHICAGO, USA” Sources Sought 36C26327Q0123.docx
- After-hours work at no extra cost. Work is limited to Monday to Friday, 7:00 am to 4:30 pm Mountain Time. Any after-hours work the facility requests must be done at no added cost, so price that risk in.“at no additional cost to the Government” Notice text
- Guano cleanup adds hazard costs. Guano may carry the fungus that causes histoplasmosis. You must provide respirators or breathing apparatus, dust controls, and hazardous waste bagging and disposal, and these add cost.“Extraction of all contaminated insulation and guano will be securely bagged in Hazardous Waste Bages” Notice text
Key terms
| How they choose | No award from this noticeThis is a sources sought for market research only.Notice text |
|---|---|
| How to submit | Email to Jeffrey.Brown8@va.govOnly emailed responses will be considered.Notice text |
How to respond
- Prepare your contact and organization information, and a descriptive proof of your ability to do the work in the SOW.
- Answer the three questions in the notice table: your socio-economic category, whether the services can be ordered against a government contract such as FSS or GSA, and whether you plan to subcontract and what share.
- Email everything to Jeffrey.Brown8@va.gov by 12:00 PM Central Time on Monday, November 30, 2026. Email is the only accepted method.
- File format, size limits and attachment rules: Not stated.
Attached files
From SAM.gov. Download links open the original files.
- Sources Sought 36C26327Q0123.docxThis is the sources sought form with the three-question table and the draft statement of work. Read it and answer the questions in your email response. Read.
Not stated in what we read
- Estimated value of the work.
- Whether a set-aside applies, and the size standard if it does.
- Contract type, length of performance, and any option years.
- Whether a site visit is required before you submit. The notice mentions only a post-award kick-off meeting.
- The SOW refers to VA Specification 01 74 19 and VA standards at an outside web link. We did not review them, so you must read them before pricing.
- Whether the government will furnish any materials, equipment or utilities.
Notice text
The Black Hills VA Healthcare System requires bat mitigation and exclusion services in accordance with the draft Statement of Work (SOW) below. This is a sources sought looking for vendors to perform the services per the SOW for market research purposes. No awards of a contract will be made from this announcement. If you are a vendor that can complete the work described in the SOW with competitive pricing, please send your contact and organization information with a descriptive proof of capability to: Jeffrey.Brown8@va.gov on or before November 30th, 2026.
Only emailed responses will be considered. Additionally, please provide answers as appropriate to the following questions in the table below with your response to this sources sought. Failure to respond to the following questions may affect the acquisition strategy. Question # Questions Vendor Responses 1. Identify your organization's socio-economic category. Â 2. State whether any of the requested services may be ordered against a government contract awarded to your organization (e.g Federal Supply Schedule (FSS), General Services Administration (GSA), etc.). Â 3.
State if subcontracting is contemplated for this requirement, what percentage of the work will be subcontracted and for what tasks. Â Â *If applicable, VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction, will apply to the potential solicitation if set-aside for Veteran Owned Small-Businesses or Service Disabled Veteran Owned Small-Businesses.* *If applicable, FAR 52.219-14 Limitations on Subcontracting, will apply to the potential solicitation if set-aside for Small-Businesses.* Draft Statement of Work (SOW) Building 65 Bat Mitigation Black Hills VA Health Care System at Fort Meade, South Dakota General Intention: Contractor shall provide all supervision, tools, labor, materials, hardware, equipment, transportation, and incidentals necessary to complete a turnkey finished project for the following services: Professional Bat abatement in attic of Building 65.
Remove bat colonies, conduct bat proofing/exclusion, remove bat guano and insulation (sterilize as needed), sanitize the area, and reinstall insulation. Building 65 is a 2-story building with the attic above. General Requirements: Contractor shall provide all supervision, labor, materials, equipment, and incidentals necessary to accomplish work elements and requirements outlined in this Statement of Work (SOW). Where equipment, temporary installations, ingress/egress restrictions or any other consideration is necessary, signage in such areas shall be provided by Contractor.
The Contractor shall confine all staging activities within the anticipated construction area. Contractor shall coordinate proposed staging areas with the facility representative for approval. The Contractor shall field verify all existing conditions, dimensions, and quantities prior to any work activities. Time and date to be coordinated with facility representative. Any work that is not addressed by the contract shall immediately be brought to the attention of the Contracting Officer.
No out-of-scope or additional work shall be executed prior to modification of the contract by the Contracting Officer. Contractor shall remove all rubbish from the Fort Meade property and dispose off site following VA Specification 01 74 19 Construction Waste Management. Contractor shall record all quantities of materials removed from the Fort Meade property and turn into the facility representative monthly reports even if a null report. Contractor to perform all work during normal work hours, Monday through Friday 7:00 am to 4:30 pm Mountain Time except as coordinated with the facility representative for any activities that may need to occur outside of normal working hours at no additional cost to the Government.
The requirements of this SOW supplement other related VA standards for construction, space and facility planning criteria, design guides, design manuals, specifications, and details, which remain in full force and effect. Specifically, all requirements of VA handbook 0730, NEC 517, NFPA Health Care Facilities Code for Branches, Security and Law Enforcement, Appendix B, (which covers physical security requirements for VA facilities), the VA fire Protection Design Manual (which covers all VA construction), and ICT standards on the TIL remain in effect.
Work Elements: Which shall include and are not limited to: All supervision, tools, labor, materials, hardware, equipment, transportation, and incidentals necessary to complete a turnkey finished project. Bat Exclusion: Bats need to be permanently excluded from roosting in the VA building 65 using non-lethal exclusion methods following Bat Conservation International (BCI), South Dakota Game, Fish and Parks recommendations, and comply with section 7 of the Endangered Species Act. The technique includes using one-way exit devices (industry preferred exclusion tubes VA approved), sealing points of entry, interior and exterior of the building, and preventing access to the building interior.
Exclusion activities will be conducted when bats are not present if feasible; this timing will also ensure that activities occur before the Maternity and Roost season. Bat removal shall occur between February 1st, 2027 and April 15th, 2027. Exclusion may not be done when pups are too young to fly (June-August). Change to these timelines may be proposed and accepted after discussion and approval by the designated facility representative(s) and contracting officer.
One-way exit devices through which bats can leave but cannot return are made from tube-type excluders which are placed at all active entry points. Exclusion tubes should have a diameter of two inches, a length of 10 inches with a smooth surface and should project no more than one-quarter inch into the opening. Once the tube has been secured over the hole, a piece of lightweight, clear plastic can be taped around the tubes outside end to further reduce the likelihood of bats reentering, though this may not be necessary.
Multiple exclusion tubes may be required. Lightweight, flexible plastic netting with one-sixth-inch mesh or smaller can be used to form a one-way valve over openings on smooth surfaces of exterior walls or attic louvers. The one-way exit devices will remain in place for at least five to seven days. The devices will be removed after all bats have been confirmed to be excluded. Night observation and other means, may be needed when determining if bats are still entering or leaving the building.
It must be confirmed by visual inspection or other that bats are no longer present. Sealing Exclusion Points Exclusion points will be sealed with OSI silicone sealant, caulk backing rod, hardware cloth or heavy-duty polypropylene mesh, flashing out required areas around roofline with proper metal for optimal coverage. If one-way exit devices have been used, sealing will be conducted after the five-to-seven days that the devices have been in place.
Bats can enter buildings or living spaces through openings as small as 3/8 diameter. Focus points include but not limited to trim, soffits, chimneys, and dormers. All metal on the front roofs will be properly sealed and securely screwed down where required to prevent Bat re-entering the building. Appropriate screws designed for metal, equipped with washers to prevent leaks will be used, and sealed to prevent future water damage. Preventing Building Interior Access The building s interior will be inspected for small openings through which bats could enter.
Bats can enter buildings or living spaces through openings as small as 3/8 diameter. All openings connecting potential roosting areas to living quarters need to be sealed. Methods not to be used for bat exclusion: Simply waiting for bats to fly out at night and then permanently sealing the entrances without the use of one-way exit devices. Ultrasonic devices, chemical repellents, smoke, canned spray foam, and traps will not be used to evict the bats from the building.
Guano, Old Insulation Removal, Cleanup, and Precautions: Bat guano may contain spores of the fungus Histoplasma capsulatum which can cause Histoplasmosis, a respiratory disease. For precautionary purposes during guano cleanup, avoid exposure to histoplasmosis by wearing a respirator capable of filtering particles as small as 2 in diameter or use a self-contained breathing apparatus when cleaning or entering areas with guano. TB-Cide Quat must be applied to the bat guano to neutralize spores and prevent their release during the cleanup process.
Extraction of all contaminated insulation and guano will be securely bagged in Hazardous Waste Bages and removed from the premises and disposed off site at an approved location that accepts this type of rubbish. Contractor shall follow the Infection Control Risk Assessment (ICRA) requirements: Perform work activity in a manner that does not create dust. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).
Ensure worker clothing is clean and free of visible dust before leaving the work area. Seal doors to prevent dust migration. All plastic barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
Install a sticky (dust collection) mat at entrance of contained work area. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily. Work under this section shall be completed prior to June 15th, 2027. Cleaning and disinfecting the space: After the bat guano and old insulation has been removed, the space will need to be cleaned and disinfected prior to the installation of new insulation. Maintain Manufactures recommendations for cleaning solutions and chemicals.
All must be submitted for VA approval before use. Replacement insulation Insulation will be replaced with blown in Cellulose insulation equal or greater than R49 value after settling. Quality control and Acceptance: QUALITY CONTROL: The Contractor shall have a quality control program to assure the requirements of this contract are completed as specified. The Contractor and facility representative will inspect the work. Deficiencies will be noted and corrected before beginning work in another area.
Any damage done by Contractor will also be noted and corrected by the Contractor within 2 working days. Damage causing an immediate impact on the environment or the building shall be corrected immediately. Extensions to repair deadlines are allowable after receiving permission from the Contracting Officer. QUALITY ASSURANCE: The Government will evaluate the contractor's performance under this contract. All surveillance observations will be recorded by the Government.
When an observation indicates defective performance, the facility representative will document the defective performance and notify the Contracting Officer. References: References for policies to adhere to during duration of project, available at http://www.cfm.va.gov/til/spec.asp. VA Specifications Federal, State, and Local Government Agencies NFPA PSDRM Building Pictures Post Award Requirements: Project kick-off meeting: The Contractor shall plan for an on-site project kick-off meeting with VA staff to walk the site and review the schedule.
As published on SAM.gov.
Contacts
- Jeffrey Brown, Contracting Officer, Jeffrey.Brown8@va.gov, 651-293-3009
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 30, 12:00 PM CT4 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 561710, exterminating and pest control services, soonest deadline first.
- Department of the Air ForcePest management services at MacDill AFB, Tampa, FL
- Forest ServiceWildlife and rodent shielding, Vienna, IL
- Forest ServiceRodent control at Beckwourth Ranger Station, Blairsden, CA
- Department of Veterans AffairsPest control at Fort Bliss National Cemetery, El Paso, TX
- Department of the ArmyRodent abatement at Pine Flat, Piedra, CA
- Departmental OfficesSealing bat entry points at Creston hatchery, MT
- Department of the NavyPest control services at Naval Weapons Station Earle, NJ
- Department of the NavyFalconry services at MCRD and Point Loma, San Diego, CA
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy