Restroom renovation to ADA unisex unit, Keyport, WA
Renovate one men's restroom in Bldg. 81 at NUWC Division Keyport into a single-occupancy, ADA-compliant unisex restroom.
Official title: Bldg. 81 Refresh and Remodel Restroom
- Deadline
- Dec 18, 3:00 PM PT
- 23 days left
- Who can bid
- Small businesses
- Size standard for NAICS 238390: $19 million in average annual receipts · Who qualifies
- Last time
- $133K
- Likely Acs Contracting LLC
- Place
- Keyport, WA
- Buyer: Naval Undersea Warfare Center
What they're buying
The firm fixed-price job covers demolition, new fixtures, flooring, paint and a bottle filler, and must be finished within 120 calendar days of award.
Top catches
“Only digital copies sent via email will be accepted.” Notice text
Your full quote must reach both contacts by email before the deadline. Paper copies and company quote forms are rejected, and the notice gives no file size limit, so send early and keep files small.
“This is a historic building. No new penetrations or alterations to the exterior are permitted.” Att_12_Statement_of_Work.pdf, page 8
The SOW bars new exterior penetrations, yet it asks you to move the meter and backflow to the north exterior wall and route a new drain through the wall. Ask the Contracting Officer in writing how this is allowed before you price it.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 8 of 14 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Demolish the existing toilets, urinals, sinks, faucets, partitions, grab bars, mirrors, drinking fountain, exhaust fan, lights, cove base, door frame and wall heater, then dispose of the debris off base.
- Install a floor-mounted ADA toilet (4.8 liters or 1.28 gallons per flush maximum), a wall-hung urinal, a wall-hung sink with WaterSense faucet, a 24 by 36 inch mirror and ADA grab bars.
- Install 18 by 18 inch slip-resistant luxury vinyl tile flooring, 6 inch black rubber cove base, and two coats of off-white low-VOC paint on the restroom walls and ceiling.
- Replace the drinking fountain with a touchless bottle filler, and relocate the water meter and backflow preventer assembly to the outside wall as the drawings show.
- Install a steel door and frame with ADA hardware and a thumb-turn deadbolt, a unisex restroom sign, LED lights with motion and audio sensors, a same-size exhaust fan, and a 1500W wall heater.
- Provide a temporary ADA portable restroom and handwashing station while the restroom is out of service, plus O&M manuals, a one-year labor and material warranty, and a schedule of values.
Who did it before
$133K
on the contract that likely holds this work now: Acs Contracting LLC. It ended Nov 28, 2025.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Offers by email only, Friday 3 PM. Your full quote must reach both contacts by email before the deadline. Paper copies and company quote forms are rejected, and the notice gives no file size limit, so send early and keep files small.
- Exterior work conflicts with no-exterior rule. The SOW bars new exterior penetrations, yet it asks you to move the meter and backflow to the north exterior wall and route a new drain through the wall. Ask the Contracting Officer in writing how this is allowed before you price it.
- Site visit request due 26 Nov. Visit requests are due at least 5 days before the 1 December visit, which means by 26 November 2026. Attendees need a valid passport or original birth certificate plus a photo ID at Pass and ID.“Offerors who plan to attend shall submit a visit request at least 5 days prior to the visit.” Solicitation - N0025327Q0005.pdf, page 44
- Safety data can disqualify your offer. Safety is rated as a factor, and all factors must be acceptable. Report DART and TCR rates for each year from 2021 to 2025 on Attachment 10, and explain any gap, because missing data without explanation may make you ineligible.“Missing data without an explanation may be considered non-responsive and may render the offeror ineligible for award.” Solicitation - N0025327Q0005.pdf, page 48
- Washington license and state work history. You must hold a current Washington State business license and show more than 3 years of commercial or industrial work in Washington. The state license search is checked at receipt and again before award, so confirm both before you bid.“OFFEROR MUST HAVE A CURRENT WASHINGTON STATE BUSINESS LICENSE:” Solicitation - N0025327Q0005.pdf, page 2
- Lead and asbestos in finishes. The building has paint and floor mastics that contain lead and asbestos. You must handle and dispose of them under lead and asbestos rules, but the notice gives no abatement plan or cost, so ask before you price demolition.“This building includes paint and floor tile mastics that contain lead and asbestos.” Att_12_Statement_of_Work.pdf, page 8
Key terms
| Who can bid | Small businesses only (100% set-aside)NAICS 238390, size standard USD 19,000,000.00 in annual revenue. A current Washington State business license is also required.Notice text |
|---|---|
| Contract period | 120 calendar days from awardEstimated award date is 11 January 2027 (clause L-211-H001), so completion would fall around 11 May 2027 if awarded then.Solicitation - N0025327Q0005.pdf, page 10 |
| How they choose | Lowest price technically acceptable (LPTA)The same clause also says most advantageous, price and other factors considered. Ask which rule applies.Solicitation - N0025327Q0005.pdf, page 46 |
| How to submit | Email to both contacts; no paper or company quote formsSend the full quote as digital files. The notice gives no file size limit.Notice text |
| Questions due | 10 days before offer due date (likely 8 Dec 2026)Send numbered written questions as early as you can. The notice also says to ask as soon as practicable.Solicitation - N0025327Q0005.pdf, page 44 |
| Estimated value | Between $25,000 and $100,000Magnitude-of-requirement range from the contract page, not a budget or bid target.Solicitation - N0025327Q0005.pdf, page 2 |
| Contract type | Firm fixed price, single award, commercial constructionPriced as one job (CLIN 0001). Wage Determination WA20250109 applies to this job.Solicitation - N0025327Q0005.pdf, page 2 |
| Site visit | Tuesday, 1 Dec 2026, 10:00 AM PSTAttendance is urged; mandatory status is not stated. Visit requests are due at least 5 days before the visit.Solicitation - N0025327Q0005.pdf, page 44 |
How to respond
- Email your site visit request by 26 November 2026 to jennifer.m.albright5.civ@us.navy.mil, michelle.a.farrales.civ@us.navy.mil and kaci.j.campbell.civ@us.navy.mil, if you plan to attend.
- Send numbered written questions by email to michelle.a.farrales.civ@us.navy.mil and kaci.j.campbell.civ@us.navy.mil, using the Attachment 09 form and citing the document, page and paragraph. Questions are likely due 8 December 2026.
- Complete the SF 1449, cover letter, SAM representations and certifications, Attachment 07 past performance sheet, Attachment 08 bid form, and Attachment 10 safety data sheet, and state any subcontractors or that none will be used.
- Email the complete quote to michelle.a.farrales.civ@us.navy.mil and kaci.j.campbell.civ@us.navy.mil by 3:00 PM Pacific on Friday, 18 December 2026. Paper copies and company quote forms are not accepted.
Attached files
From SAM.gov. Download links open the original files.
- Att_13_Drawing_Distro_A.pdfDrawing sheets showing the existing and new restroom layout, the relocated water meter and the new drain route; read them for layout, with nothing to sign. Read.
- Att_07_Past_Perf_Ref.docx Not read: over our length limit.
- Att_04_Guide_Environmental.pdf Not read: over our length limit.
- Att_09_PPI_Form.docxBlank form for numbered written questions to the government; fill it in and send it if you have questions. Read.
- Att_03_Guide_Safety.pdf Not read: over our length limit.
- Att_05_Guide_OPSEC.pdf Scanned image, not read.
- Att_02_Wage_Determination.pdf Not read: over our length limit.
- Att_01_Material_Equipment.xlsxEquipment and materials list for installed and removed items, with model, serial and warranty dates; sheet 1 is blank for this job and sheet 2 holds unrelated sample rows, and you complete it at close-out. Read.
- Att_10_Safety_Data_Sheet.docxSafety form with five years of DART and TCR rates, insurance carrier details and a two-page safety narrative; you must complete and submit it with your quote. Read.
- Att_06_Schedule_of_Values.xlsxTemplate that splits the contract price by work area for monthly invoices; you complete it after award, and you only need to read it before bidding. Read.
- Att_11_OSHA_Incident_Rate.pdf Not read: over our length limit.
- Att_12_Statement_of_Work.pdfStatement of work with scope, product specifications, schedules and site rules; pages 21 to 29 were not provided. Read it fully and price from it. Read in part (pages 1–20 and 30–39 of 39).
- Att_08_Bid_Form.xlsxBid form for labor hours, labor mix, materials, equipment and totals for CLIN 0001; you must complete it and return it with your quote. Read.
- Solicitation - N0025327Q0005.pdfThe solicitation with clauses, schedule, site visit rules and evaluation terms; pages 20 to 40 were not provided. You must read it and complete the forms it requires. Read in part (pages 1–19 and 41–49 of 49).
Not stated in what we read
- Attachment 02, the wage determination WA20250109, was not reviewed. You must read it, since it sets the labor rates you must pay.
- Attachments 03, 04, 05, 07 and 11 were not reviewed. Attachment 05 is a scanned image, and Attachment 07 is the past performance form you must complete. You must read them all.
- Solicitation pages 20 to 40 and SOW pages 21 to 29 were not provided, so the full proposal instructions in Section L are not reviewed. Read them before you bid.
- Bid bond amount and letter of bondability requirements are not stated in the provided pages.
- The clearance level needed for base access is not stated, although the SOW says access is limited to cleared personnel.
- Whether a file size limit applies to emailed quotes is not stated, and whether the site visit is mandatory is not stated.
Notice text
Naval Undersea Warfare Center (NUWC) Division, Keyport is soliciting for renovation of a men’s restroom into a single occupancy unisex Americans with Disabilities Act (ADA) compliant restroom as described in the Statement of Work. This requirement is being issued as a combined synopsis/solicitation for commercial items in accordance with FAR 12.1, as supplemented with additional information included in the attached solicitation. This announcement constitutes the only solicitation.
There is no applicable Defense Priorities and Allocations System (DPAS) rating for this requirement. The solicitation, issued as request for quotation (RFQ) N0025327Q0005, is attached to this announcement. The proposed contract is 100% set aside for small business concerns. The applicable North American Industry Classification System (NAICS) code for this requirement is 238390 and has a size standard of $19M in annual revenue. Offerors are required to provide FOB Destination pricing to NUWC Division, Keyport.
Requirements and evaluation procedures are listed in the attached solicitation, which is required to be filled out in its entirety and returned before the solicitation closes. All questions regarding this solicitation should be submitted in writing as soon as practicable after receipt of solicitation. Questions and offers should be submitted via e-mail to michelle.a.farrales.civ@us.navy.mil & kaci.j.campbell.civ@us.navy.mil. No paper copies will be accepted.
Only digital copies sent via email will be accepted. Failure to complete all representations and certifications found within the solicitation and respond to this RFQ with associated amendments, if applicable, prior to the closing date and time established may render an offer non-responsive and result in rejection. Company quote forms will NOT be accepted. All details regarding the vendor offer shall be documented in the RFQ. The government terms and conditions (T&C’s) listed in this solicitation are required by law through the Federal Acquisition Regulations (FAR) and the Department of Defense FAR Supplement (DFAR).
It is preferred that company T&C’s not be included with your quote submittal as many company T&C’s are inconsistent with federal law and unenforceable. Provisions and clauses in effect through the latest Federal Acquisition Circulars are included in the solicitation. To access the clauses/provisions to be completed, download the Federal Acquisition Regulations at http://acquisition.gov/far/. Download the Defense Federal Acquisition Regulations (DFARS) at http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html.
The offeror must have a current registration and completed representations and certifications in the System for Award Management (SAM) at website https://sam.gov/ which is a federal government owned website.
As published on SAM.gov.
Contacts
- Michelle Farrales, michelle.a.farrales.civ@us.navy.mil
- Kaci Campbell, kaci.j.campbell.civ@us.navy.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Navy for the same kind of work (NAICS 238390, service code Z2AZ) in Washington that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Bldg 84 Restroom and LunchroomAcs Contracting LLC · N0025325C6012 | $132,764 | Nov 28, 2025ended | WA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 18, 3:00 PM PT23 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238390, other building finishing contractors, soonest deadline first.
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy