Aggregate crushing at Bushy Knoll pit, Happy Jack, AZ

Aggregate crushing and stockpiling at the Bushy Knoll pit near Happy Jack, Arizona, including pit development, blasting, and an access road.

Official title: Bushy Knoll Pit Crush & Stockpile

Deadline
Jan 6, 2027, 1:00 PM CT
42 days left
Who can bid
Small businesses
Size standard for NAICS 212321: 500 employees · Who qualifies
Last time
$308K
Likely Schuck Development Corp
Place
Happy Jack, AZ
Buyer: USDA-FS, Csa Southwest 7

What they're buying

The base buy is 10,500 cubic yards of R3-G aggregate with four 2,000 cubic yard options, over 180 calendar days after notice to proceed.

Top catches

Two different performance periods
“Period of Performance: 01/13/2027 to 01/12/2028” 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf, page 3

The statement of work says 6/1/26 to 09/30/27, while the solicitation form says 01/13/2027 to 01/12/2028 and 180 days after notice to proceed. Ask the contracting officer to confirm the period before you build your schedule.

Proposal deadline year conflict
“January 6th, 2026, 1:00 PM Central Time.” 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf, page 9

The proposal section says January 6th, 2026, but the response deadline is January 6, 2027. A 2026 date has already passed, so this is probably a typo, but get written confirmation from the contracting officer.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 6 of 7 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Mobilization, topographic survey, clearing and grubbing, and drilling for blasting or excavation.
  • Pit development and material extraction, including overburden removal and a staging area.
  • Crush and stockpile 10,500 cubic yards of R3-G aggregate, plus four options of 2,000 cubic yards each.
  • Build an access road with a 14-foot minimum travel way and a 4-inch aggregate surface.
  • Gradation sampling, testing, and quality control surveying, with survey data delivered as an AutoCAD surface file.
  • Obtain the ADEQ air quality permit and notice of intent with a SWPPP and erosion control plan, and follow the fire precaution plan.

Who did it before

$308K

on the contract that likely holds this work now: Schuck Development Corp. It ended Nov 1, 2026.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • Two different performance periods. The statement of work says 6/1/26 to 09/30/27, while the solicitation form says 01/13/2027 to 01/12/2028 and 180 days after notice to proceed. Ask the contracting officer to confirm the period before you build your schedule.
  • Proposal deadline year conflict. The proposal section says January 6th, 2026, but the response deadline is January 6, 2027. A 2026 date has already passed, so this is probably a typo, but get written confirmation from the contracting officer.
  • 20 percent bid guarantee and bonds. You must post a bid guarantee of 20 percent of your bid price, and furnish performance and payment bonds within 10 calendar days after award. Confirm with your surety now, since the notice does not say how to submit the guarantee.“The amount of the bid guarantee shall be 20 percent of the bid price.” Notice text
  • Davis-Bacon wage rates unreadable. Davis-Bacon wages apply, but the wage determination (Attachment 6) is a scanned image that could not be read for this summary. Download it from SAM.gov and price your labor from it before you submit.“Davis Bacon wages apply.” 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf, page 3
  • All four options must be priced. You must price the base quantity and all four options, A through D, in the Schedule of Items. A missing price excludes your quote, and option prices count in the evaluation.“Failure to propose pricing for the base period and all optional line items will result in a proposal being excluded from further consideration.” 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf, page 11
  • Price is not the main test. The highest technically rated offer wins if its price is fair and reasonable and past performance is acceptable or neutral. Put most of your effort into the technical proposal, which has strict page limits.“Award will not necessarily be made to the lowest-priced offeror.” 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf, page 13

Key terms

Who can bidSmall businesses only (total small business set-aside)NAICS 212321, size standard 500 employees.Notice text
Contract period180 calendar days after notice to proceedStart within 10 calendar days of notice to proceed. The solicitation lists different dates. See catches.Attachment 1 - Statement of Work.pdf, page 3
How they chooseHighest technically rated offer with fair and reasonable pricePast performance must be acceptable or neutral. Lowest price does not win automatically.127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf, page 10
How to submitEmail three separate PDFs to troy.mccullough@usda.govSend the SF 1442 offer, the priced Schedule of Items, and the technical proposal.127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf, page 9
Questions dueDecember 10, 2026, 1:00 PM Central TimeSend questions by email to troy.mccullough@usda.gov with the solicitation name and number in the subject line.127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf, page 9
Contract typeFirm-fixed price (anticipated)Commercial construction under FAR Part 12. One award is planned.127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf, page 9
Site visitDecember 3rd at 10:00 am Local TimeMeet at the COC-211 and 211D intersection. The year and whether attendance is mandatory are not stated.127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf, page 9

How to respond

  1. Complete and sign the SF 1442 (blocks 10, 14 to 17, and 20a to 20c), and fill in unit prices for the base and Options A through D in the Schedule of Items.
  2. Write the technical proposal within the page limits: work plan 10 pages, key personnel 3 pages, and performance schedule 6 pages.
  3. Put the solicitation number in the name of each document, and save each as a separate Adobe PDF.
  4. Email the three PDFs to troy.mccullough@usda.gov by Wednesday, January 6, 2027, 1:00 PM Central Time. Not stated: how to send the bid guarantee.
  5. Hold your prices open for 60 calendar days after the due date, as the solicitation requires.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated value of the contract, since every unit price and total is blank.
  • Davis-Bacon wage rates, because the wage determination could not be read.
  • Whether the December 3 site visit is mandatory, and its year.
  • Which performance period is correct.
  • Payment schedule and liquidated damages.
  • The subcontracting limit percentage under the listed limitations-on-subcontracting clause.

Notice text

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0017 is issued as a Request for Quotation (RFQ) for Bushy Knoll Pit Crush & Stockpile. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 212321 Construction Sand and Gravel Mining.

The small business size standard is 500 Employees. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Statement of Requirement: Bushy Knoll Crush and Stockpile Project: This project will include mobilization, surveying, clearing and grubbing, drilling, material extraction through blasting or excavation, sampling and testing, stockpile surveying for quality control and crushing and stockpiling of aggregate material in accordance with the plans and specifications.

It will also include the creation of an access road to gain access to the proposed work area. The Contractor shall be responsible to obtain all permits as required by Arizona Department of Environmental Quality (ADEQ) for the Contractor’s methods of operation(s). The Contractor shall furnish labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. IAW 52.228-1 The amount of the bid guarantee shall be 20 percent of the bid price.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at Forest Service for the same kind of work (NAICS 212321, service code F011) in Arizona that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 20, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Forest Service by email

Each morning we'll send the new solicitations and sources-sought notices from Forest Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy