Overhaul of nine C-5 fire suppression parts, Georgia
Depot-level repair (overhaul) of nine C-5 Galaxy fire suppression valves and components, to supply Air Force aircraft for five years: a basic year plus four one-year ordering periods.
Official title: C-5 Fire Suppression System Repair
- Deadline
- Tomorrow, 5:00 AM ET
- Friday, Nov 27
- Last time
- $330K
- Likely The Boeing Company
- Place
- GA
- Buyer: FA8538 AFSC Pzaab
What they're buying
The work is done at the contractor's facility in Georgia, and this is a presolicitation with replies due November 27, 2026, not an award.
Top catches
“The best estimated quantities (BEQs) with estimated cost.” Notice text
The notice refers to quantities and estimated cost, but the item table shows neither, so you cannot price the work from this notice alone. Ask the contracting officer for the best estimated quantities before you commit.
“If no assets are on hand at the time of notification, delivery shall be thirty (30) calendar days after receipt of asset(s).” Notice text
The notice text says 30 days when no assets are on hand, but the PWS (page 8) says 45 days after the later of the delivery order or receipt of reparable assets. Price the shorter time and ask which one governs.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Overhaul of nine NSN items: 2-inch zone fire valve, isolation valve, shutoff valve, 1 1/4-inch zone fire valve, primary pressure relief and overboard relief valve, pressure limiter valve, secondary pressure regulator, fill coupling receptacle, and backpressure relief valve.
- Tear-down, evaluation, repair, functional testing, component procurement, packaging, storage, transport and data collection for each unit.
- Overhaul to the Air Force technical order for each part, with at least 95% of units passing initial DCMA inspection and no more than one DCMA failure per year.
- Deliveries on schedule 95% of the time, with the rest no more than seven calendar days late, plus surge or MICAP work on a fast schedule.
- Reporting in CAV-AF, a monthly production report, an annual government property inventory in Excel within seven calendar days, and an ISO 9001:2015 quality program plan.
- Special tooling and test equipment in place within 60 days of award, and an IUID marking plan.
Who supplied it lately
$330K
on a recent contract for the same kind of product: The Boeing Company. It ends Nov 30, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Quantities and cost not listed. The notice refers to quantities and estimated cost, but the item table shows neither, so you cannot price the work from this notice alone. Ask the contracting officer for the best estimated quantities before you commit.
- Surge delivery time conflicts. The notice text says 30 days when no assets are on hand, but the PWS (page 8) says 45 days after the later of the delivery order or receipt of reparable assets. Price the shorter time and ask which one governs.
- Small business set-aside. Only firms that are small under NAICS 336413 can compete for this. The notice gives no size standard, so confirm your size under that code before you spend time on a reply.“Set-aside: Small Business Set Aside - Total” SAM.gov record
- CMMC cybersecurity certification required. If you process federal contract or controlled unclassified information, you must hold CMMC Level 1 or higher and list your CMMC identifiers in SPRS. The PWS allows 180 days after award to finish any open items, so check your status before you reply.“The contractor shall achieve and maintain a CMMC Level 1 or higher” C-5_FSS_PWS.pdf, page 10
- You furnish all tooling and gear. You must supply all material, parts, labor, tools, equipment and facilities, plus special tooling and test equipment. The technical manuals come only after award, and tooling must be in place within 60 days of award, so price that in now.“The contractor shall furnish all material, parts, labor, tools, equipment, and facilities necessary for the overhaul of the items.” C-5_FSS_PWS.pdf, page 3
- Deadline time only in record. The SAM.gov record sets 5:00 AM at a -05:00 offset on November 27, but the notice text gives only the date. Treat 5:00 AM as the cutoff and send any reply early, since the notice does not say how to send it.“Response deadline: 2026-11-27T05:00:00-05:00” SAM.gov record
Key terms
| Who can bid | Small businesses only (total set-aside)The size standard for NAICS 336413 is not stated in the notice.SAM.gov record |
|---|---|
| Contract period | Five years: one basic year plus four one-year ordering periodsThis is the projected period of performance.Notice text |
| Estimated value | Over $1,000,000 (PWS estimate); quantities and cost not listedThe notice refers to best estimated quantities and cost, but none appear.C-5_FSS_PWS.pdf, page 14 |
How to respond
- Confirm you meet the small business size standard for NAICS 336413, since the notice does not state it.
- Ask the contracting officer for the best estimated quantities and estimated cost per item, which the notice refers to but does not show.
- Send your reply before 5:00 AM (-05:00 offset) on Friday, November 27, 2026. Where to send it: Not stated.
- Format, content and delivery method for the reply: Not stated. The notice gives no email, portal or address.
Attached files
From SAM.gov. Download links open the original files.
- C-5_FSS_PWS.pdfThe performance work statement describes the overhaul work, delivery and reporting rules, and lists the nine items and their technical manuals; it requires a Standard Form 328 foreign interest certificate and a supply chain risk plan, but you only need to read it, not sign it. Read.
Not stated in what we read
- Estimated quantities and estimated cost for each of the nine items.
- How and where to send replies, and what a reply must contain.
- How replies will be judged or how the contract will be awarded.
- The size standard for NAICS 336413 and whether you qualify as small.
- Pricing type, price escalation, and how option-year prices are set.
- Whether questions can be asked, and by what date.
Notice text
C-5 Fire Suppression System This requirement is for depot-level repair for the nine competitive C-5 items listed below. The depot-level repair to be performed includes tear-down, evaluation, repair, testing, component procurement, packaging, handling, storage, transportation, as well as data collection. These services will provide assets to support all the C-5 aircraft until expected retirement of 2040. The assets provided by these services will be used to reduce current back orders and meet quarterly demand rates in support of Air Force sorties and aircraft Programmed Depot Maintenance (PDM).
The best estimated quantities (BEQs) with estimated cost. Noun National Stock Number (NSN) Part Number 2 - Inch Zone Fire Valve 4810010033512 7720011-106 Isolation Valve 4810010033513 7720012-105 Shutoff Valve 4810010033514 7720013-107 1 ¼ - Inch Zone Fire Valve 4810010046559 7720015-107 Primary Pressure Relief & Overboard Relief Valve 4820001851031 7720125-101 Pressure Limiter Valve 4820001851033 7720142-101 Secondary Pressure Regulator 4820001851037 7720224-101 Fill Coupling Receptacle 4820001867007 7720017-102 Backpressure Relief Valve 4820002700682 7720119-102 The projected period of contract performance for this requirement is five years.
Period of performance is comprised of a basic year with 4 one-year ordering periods. Delivery of assets - Repaired assets shall be delivered in accordance with the schedule, as defined by the contract/order. Assets shall be delivered 95% of the time with the remaining 5% being delivered no more than seven (7) calendar days late. If delivery slips more than seven (7) calendar days from contract delivery schedule, the Contractor shall notify the contracting officer to negotiate a revised delivery date.
Delivery of assets to fulfill a SURGE or MICAP requirement shall be thirty (30) calendar days after contractor receives notification of a SURGE or MICAP requirement if assets are already on hand at the contractor's facility. If no assets are on hand at the time of notification, delivery shall be thirty (30) calendar days after receipt of asset(s). Items included in this effort are military unique and the services do not meet the definitions of FAR Part 2 in terms of commercial items or non-developmental items which can be acquired in the commercial market sector using streamlined acquisition procedures under FAR Part 12.
THIS IS NOT AN AWARD All replies are due by November 27,2026.
As published on SAM.gov.
Contacts
- Jonathan Teece, Jonathon.Teece@us.af.mil
- Regina Daniely, regina.daniely@us.af.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Air Force for the same kind of product (NAICS 336413, product code 1680) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Aiu and Acp Critical ComponentsThe Boeing Company · FA822025FB005 | $329,914 | Nov 30, 2026within a month | MO |
| F-16 Support Equipment for the Country of TaiwanBAE Systems Information and Electronic Systems Integration Inc. · FA823225FB180 | $599,022 | Dec 1, 2026within a month | TX |
| Kse Fopr 10 VC DisplaysVC Displays, Inc. · FA860926FB050 | $573,453 | Nov 15, 2026ended | FL |
| Remanufacture of the E-3 Elctro-Mechanical ActuatorTexas Aerospace Services Inc · FA811826F0044 | $120,406 | Dec 8, 2026within a month | TX |
| Overhaul of Electro-Mechanical ActuatorMPC Products Corporation · FA811825F0187 | $103,583 | Nov 13, 2026ended | IL |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Tomorrow, 5:00 AM ETFriday, Nov 27
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 336413, other aircraft parts and auxiliary equipment manufacturing, soonest deadline first.
- Defense Logistics AgencyBearing housing units for DLA Aviation, Oklahoma City
- Department of the Air ForceA-10 rotor and stator brakes, Air Force interest request
- Department of the NavyAircraft IDG repair and overhaul, Rockford, IL
- Department of the NavyRepair of Stores Management C unit, Grand Rapids, MI
- Defense Logistics AgencySupport bearings for DLA Aviation, Philadelphia, PA
- Department of the NavyNavy ECS valves; specs not in notice
- Department of the NavyRepair of NVG HUD converters, Fort Worth, TX
- Department of the NavyRepair and test of generator control units, Phoenix, AZ
Free · at most one email a morning
Get new notices from Department of the Air Force by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy