1. Opportunities
  2. Department of Defense
  3. Department of the Air Force
  4. FA853827RB009

C-5 flap asymmetry brake overhaul, Warner Robins, GA

The Air Force wants depot-level overhaul of C-5 flap asymmetry brakes at Warner Robins, GA, plus upgrade of one configuration to the final 5903-105L version.

Official title: C-5 Flap Asymmetry Brake Overhaul

Deadline
Dec 10, 5:00 PM ET
14 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Warner Robins, GA
Buyer: FA8538 AFSC Pzaab

What they're buying

The firm-fixed-price requirements contract runs five years, with best estimated quantities of 10 to 35 units per period, and you must first be pre-approved under the Source Pre-Qualification Requirements.

Top catches

Pre-approval required before award
“To be eligible for award, offerors must be pre-approved by the Government's Design Control Activity (C-5 AFLCMC/SPO Engineering) in accordance with the Source Pre-Qualification Requirements (SQS).” Notice text

You cannot be eligible for award unless the Design Control Activity pre-approves you under the source pre-qualification rules. Start the qualification package now, before the RFP is posted.

NSN and part number conflict
“NSN: 1680-01-525-8920 (and 1680-01-164-0384) Part Nos: 5903-105L (4C95003-105L) and 5903-105K (4C95003-105K)” Notice text

The notice pairs NSN 1680-01-164-0384 with 5903-105K, but the attached requirements list that NSN as 5903-105J. Ask the contact to confirm which part is meant before you price the work.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Overhaul of 5903-105L flap asymmetry brakes (CLIN x001): 30 each in basic and ordering periods I and II, 35 each in III and IV
  • Overhaul and upgrade of 5903-105K brakes to the final 5903-105L configuration (CLIN x002): 10 each period
  • No Fault Found and Beyond Economical Repair CLINs: estimated at 1 each per period
  • Repair, inspection and testing under USAF overhaul manual 16C1-4-18-3
  • Special tooling and test equipment to test each brake after repair

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Pre-approval required before award. You cannot be eligible for award unless the Design Control Activity pre-approves you under the source pre-qualification rules. Start the qualification package now, before the RFP is posted.
  • NSN and part number conflict. The notice pairs NSN 1680-01-164-0384 with 5903-105K, but the attached requirements list that NSN as 5903-105J. Ask the contact to confirm which part is meant before you price the work.
  • 80 percent in-house repair rule. You must perform at least 80% of the repair workload in-house, so heavy outsourcing would likely fail this rule. Check your own capacity before you prepare a package.“Potential bidders shall perform a minimum of 80% of the repair workload in-house.” SQS Repair_Flap Asymmetry Brakes_20260218.pdf, page 2
  • Deadline comes before the RFP. The response deadline is 14 days away, but the RFP is not yet posted and the notice does not say what a response must include. Ask the contact what to send by that time.“The formal Request for Proposal (RFP) will be posted to the SAM.gov webpage.” Notice text
  • Named firm skips qualification. Thomas Instrument, Incorporated (CAGE 5H860) is listed as already qualified and exempt from this process. You would compete against a firm that skips the step you must complete, so weigh that before you invest.“The following companies are currently qualified to repair, test, and manufacture:” SQS Repair_Flap Asymmetry Brakes_20260218.pdf, page 3
  • You pay qualification costs. The Air Force pays none of the pre-qualification costs. Include those costs in your decision before you start, since the award basis is lowest price.“All costs related to pre-qualification shall be paid by the applicant.” SQS Repair_Flap Asymmetry Brakes_20260218.pdf, page 3

Key terms

Who can bidQualified sources under the SQS, or sources currently seeking qualificationFull and open among qualified sources. No set-aside is used.Notice text
Contract periodFive years: one-year basic period plus four one-year ordering periodsProjected period of performance.Notice text
How they chooseLowest Price/Technically Acceptable (LPTA)Anticipated basis of award.Notice text
Contract typeFirm-fixed-price requirements contractOrdering periods are set by the Best Estimated Quantities listed in the notice.Notice text

How to respond

  1. Watch SAM.gov for the RFP, which the notice says will be posted there. No hardcopies will be provided.
  2. Prepare the source pre-qualification package: capabilities summary, facility layout, equipment list, ISO 9001 quality plan (or third-party certificate), and overhaul process plan citing manual 16C1-4-18-3.
  3. Add similar-item evidence: contract numbers, agencies, values, assets shipped, drawings, test results, and at least five references with phone numbers if you have made similar items for commercial customers.
  4. Confirm how and where to send the package with Samuel Stahl, AFLCMC/WLSEA, 235 Byron Street Suite 19A, Robins AFB, GA 31098, before 5:00 PM, offset -05:00, on Thursday, December 10, 2026. The notice does not state a submission method.

Attached files

From SAM.gov. Download links open the original files.

  • SQS Repair_Flap Asymmetry Brakes_20260218.pdfThis is the source pre-qualification requirements document. It lists the part numbers and the package you must submit to be approved, and you must complete that package before you can bid. Read.

Not stated in what we read

  • Estimated contract value or dollar amount
  • What a response to the December 10 deadline must contain, since the RFP is not yet posted
  • When the RFP will be posted on SAM.gov
  • How and where to submit the qualification package
  • Which part number NSN 1680-01-164-0384 belongs to, 5903-105J or 5903-105K
  • How long the Design Control Activity takes to give pre-approval

Notice text

Pre-Solicitation, C-5 Flap Asymmetry Brake Overhaul NSN: 1680-01-525-8920 (and 1680-01-164-0384) Part Nos: 5903-105L (4C95003-105L) and 5903-105K (4C95003-105K) The United States Air Force (USAF) has a requirement for depot-level overhaul and configuration upgrade of the C-5 Flap Asymmetry Brake. This critical flight control component is part of the Secondary Flight Control Flap System used on the C-5 Galaxy aircraft. It is designed to stop the flap system when an asymmetrical condition is detected in flight, preventing uneven aerodynamic loads and severe damage to the wings and flap actuation system.

The purpose of this requirement is two-fold: Overhaul of the 5903-105L configuration assets. Overhaul and Upgrade of the 5903-105K configurations to the final 5903-105L configuration. This effort will utilize a firm-fixed-price (FFP) Requirements Type Contract. The projected period of performance is five (5) years, consisting of a one (1) year basic period and four (4) individual one-year ordering periods. To be eligible for award, offerors must be pre-approved by the Government's Design Control Activity (C-5 AFLCMC/SPO Engineering) in accordance with the Source Pre-Qualification Requirements (SQS).

The USAF anticipates this acquisition will be a Full and Open Competition among qualified sources under the SQS, with the basis of award being Lowest Price/Technically Acceptable (LPTA). The Best Estimated Quantities (BEQ) for each ordering period are outlined below: Overhaul CLIN x001 (P/N 5903-105L) Year / Period BEQ Basic 30 EA Ordering Period I 30 EA Ordering Period II 30 EA Ordering Period III 35 EA Ordering Period IV 35 EA Overhaul & Upgrade CLIN x002 (P/N 5903-105K) Year / Period BEQ Basic 10 EA Ordering Period I 10 EA Ordering Period II 10 EA Ordering Period III 10 EA Ordering Period IV 10 EA (Note: Best Estimated Quantities for No Fault Found (NFF) and Beyond Economical Repair (BER) CLINs are estimated at 1 EA per period.)

The formal Request for Proposal (RFP) will be posted to the SAM.gov webpage. NO HARDCOPIES WILL BE PROVIDED. All responsible sources qualified under the SQS (or currently seeking qualification) may submit a proposal, which shall be considered by the agency. Offerors are encouraged to register on the site to receive notifications regarding the solicitation and any amendments/revisions.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 26, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Air Force by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy