Construction oversight for nature center, Wichita, KS
The U.S. Fish and Wildlife Service wants an architect-engineer firm to provide construction administration for the Great Plains Nature Center renovation in Wichita, Kansas, for 300 days after notice to proceed.
Official title: C--USFWS_KS_Great Plains NC_TITLE III ServicesI
- Deadline
- Nov 30, 12:00 PM ET
- 5 days left
- Who can bid
- Small businesses
- Size standard for NAICS 541330: $25.5 million in average annual receipts; exceptions apply · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: FWS Contracting Activity
What they're buying
The work covers construction questions, submittal reviews, site inspections, commissioning and as-built drawings.
Top catches
“Date for submission of questions is by 1200 EST,” B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdf, page 1
The notice text gives 11/30/2026 for questions, but the amendment file gives 11/23/2026. Send any questions by 11/23/2026, 1200 EST, to be safe.
“2026-11-30T12:00:00-05:00” SAM.gov record
Noon EST is 11:00 AM Central, one hour earlier than Wichita time. The government's own availability hours use Mountain time, so confirm your send time against the EST deadline and submit early.
Read by AI (Claude Haiku) on Nov 18, 2026 from the notice and 5 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Attend the kick-off teleconference and give detailed meeting notes.
- Review and answer about 25 construction RFIs and review about 200 submittals, recommending approve, approve with notations or disapprove.
- Join about 44 construction teleconferences of about 60 minutes each, plus an hour-long pre-construction kick-off.
- Make 14 engineering inspections and 25 field inspections (about weekly during active work), with reports showing weather, worker and equipment counts, photos and inspector signature.
- Provide fundamental commissioning under ASHRAE Standard 202-2013 and Guideline 0-2013, including witnessing tests and extra site visits.
- Deliver updated as-built drawings in .dwg and .pdf formats, plus punch lists and meeting minutes on set deadlines.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Questions deadline conflicts. The notice text gives 11/30/2026 for questions, but the amendment file gives 11/23/2026. Send any questions by 11/23/2026, 1200 EST, to be safe.
- Deadline is in Eastern time. Noon EST is 11:00 AM Central, one hour earlier than Wichita time. The government's own availability hours use Mountain time, so confirm your send time against the EST deadline and submit early.
- Key staff rules are strict. Four roles must each have 10 or more years of experience and a state or professional certification where one applies: cost estimator, geotechnical engineer, project manager and structural engineer. Your firm must have them in-house or through subconsultants, and the work must be directly supervised by a Kansas-licensed architect or engineer.“Function Code 27 - Foundation / Geotechnical Engineer *” B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdf, page 3
- Insurance amounts conflict. The insurance clause shows two sets of amounts: $500,000 and $275,000 for each person, and $250,000 and $20,000 for property damage. The Contracting Officer sets the final amounts, so ask before you price insurance.“($275,000.00 each person*)” B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdf, page 14
- Some RFI and redesign work is unpaid. RFIs caused by unclear documents must be answered at no added cost, and redesign to fit the budget and corrections to errors are also unpaid. Price those hours in or ask the Contracting Officer to define the limits.“insufficient clarity of construction documents shall be responded to by the A/E at no additional cost to the Government.” A04_SOW_Title_III_GPNC_Visitor_Center_10_20.pdf, page 2
- Price proposal due in 14 days. After the top firm is selected, you have 14 calendar days to submit a full price proposal with labor rates. Have fully loaded labor rates for the listed positions ready before the invitation arrives. Late replies follow FAR 52.215-1.“The A/E firm will have fourteen (14) calendar days to submit their price proposal.” B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdf, page 4
Key terms
| Who can bid | Small businesses only (total set-aside, NAICS 541330)Size standard stated as $25.5 million.B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdf, page 2 |
|---|---|
| Contract period | 300 days after notice to proceedOther dates conflict: December 2026 to October 2027 in the solicitation, October 2026 to August 2027 in the SOW.Notice text |
| How they choose | Most qualified firm chosen first, then price negotiatedRatings are based on qualifications; the price proposal is requested only after selection.B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdf, page 4 |
| How to submit | Email to Thomas_ikner@ios.doi.govInclude the SF 330 and the SF 1447 amendment acknowledgment.Notice text |
| Questions due | 11/23/2026 or 11/30/2026, 1200 EST (sources conflict)Send any questions by 11/23/2026 to be safe.B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdf, page 1 |
| Estimated value | Construction estimate $1M to $5M; A-E fee Not statedThis is the construction estimate from the design funding clause, not the value of this contract.B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdf, page 10 |
| Contract type | Firm-fixed-price, one contractInvoices are monthly, submitted through the Treasury Invoice Processing Platform.B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdf, page 2 |
| Site visit | Available on requestNo date is given. Clause 52.237-1 Site Visit is incorporated.Notice text |
How to respond
- Read the full solicitation and amendments on SAM.gov. The drawing set was only partly provided here, so pages 6 to 27 must be read on SAM.gov.
- Send any questions to Thomas_ikner@ios.doi.gov by 11/23/2026, 1200 EST, to be safe. The notice also lists 11/30/2026, so confirm with the Contracting Officer.
- Prepare the SF 330: up to 15 resumes of 2 pages or less in Part I Section E, 2 to 5 projects in Section F, a team narrative in Section H, and the role titles and registration details in Blocks 13 and 17.
- Complete and sign the SF 1447 acknowledging each amendment and return it with your response.
- Email the complete response to Thomas_ikner@ios.doi.gov by Monday, November 30, 2026, 1200 EST. File format, file size limits and subject line requirements: Not stated.
Attached files
From SAM.gov. Download links open the original files.
- A04_Great_Plains_Nature_Center_Drawings.pdfCivil, foundation and structural drawing set; only pages 1 to 5 and 28 to 31 were provided, so read the rest on SAM.gov. Read only, no form to fill. Read in part (pages 1–5 and 28–31 of 31).
- A04_SOW_Title_III_GPNC_Visitor_Center_10_20.pdfStatement of work listing the five tasks, estimated counts, deliverable deadlines and staffing rules. Read only, no form to fill. Read.
- Sol_140FF027R0002.pdfBase solicitation with the SF 1447 cover form, the notice to offerors, clauses and provisions. The SF 1447 must be completed and signed if you respond. Read.
- B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdfAmendment 1 notice to offerors with the full clause and provision text, including insurance, set-aside and evaluation terms. Read only. Read.
- Sol_140FF027R0002_Amd_0001.pdfSF 30 amendment 0001 that sets the period of performance to 12/01/2026 to 10/01/2027. You must acknowledge it under the instructions on the form. Read.
Not stated in what we read
- Estimated value of the A-E contract (fee) is not stated.
- The exact period of performance start and end dates; the sources give three different versions.
- File format, file size and page limits for the full response beyond the resume and project limits.
- Final insurance amounts, which the Contracting Officer will set.
- Site visit dates and how to request one.
- The content of drawing pages 6 to 27, which were not provided.
Notice text
USFWS_Wichita, KS_Great Plains Nature Center Rehabilitation_A-E Title III Services Amendment 1 - Due Date extended to November 30, 2026 Description: This project is for an Architect-Engineer (A-E) to provide Construction Administration Services (Title III Services) for the Great Plains Nature Center Renovation project. Location: Great Plains Nature Center 6232 East 29th Street North Wichita, KS 67220 Period of Performance: 300 Days after NTP Site Visit: Site Visits at the Great Plains Nature Center will be available upon request.
Date for submission of Questions: Date for submission of questions is by 1200 EST, 11/30/2026. Submit questions to Theo Ikner, Contracting Officer@ Thomas_ikner@ios.doi.gov Solicitation Package RFP #140FGA26R0032 ¿ 21 Pages Statement of Work ¿ 7 pages GPNC Drawings ¿ 31 Pages Instructions to Offeror: 1. Before submitting an offer, read the entire solicitation package carefully. Return the following items with your response: 1. SF 330 including all portions listed for evaluation Factors 2.
SF 1447 Acknowledgment of any/all Amendments to Solicitation Proposal Due Date: 11/30/2026 1200 EST Your proposal shall be electronically submitted to the Contracting Officer: @Thomas_ikner@ios.doi.gov If your firm is unable to meet the due date for reasons outside of your control, please notify the Contracting Officer as soon as practicable. DESCRIPTION This project is for an Architect-Engineer (A-E) to provide Construction Administration Services (Title III Services) for the Great Plains Nature Center Renovation project.
Period of performance for Title III Services will be from the date of contract issuance until 300 days, unless modified by the Contracting Officer. The work of this contract shall be provided from December 2026 ¿ October 2027(estimated). The intent is to provide support to the Great Plains Nature Center Renovation project, from solicitation through completion of construction. Task 1 ¿ Attend Teleconference Construction Support Kick-Off Meeting Task 2 ¿ Perform Construction Support Services Task 3 ¿ Provide On-Site Inspections and Reports Task 4 ¿ Perform Commissioning Services Task 5 ¿ Prepare Updated As-Built Drawings See Statement of Work and solicitation for Full Task Details and requirements.
As published on SAM.gov.
Contacts
- Ikner, Thomas, thomas_ikner@fws.gov, 0000000000
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 30, 12:00 PM ET5 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 541330, engineering services, soonest deadline first.
- National Aeronautics and Space AdministrationUniversal Robotics UR10e arm, NASA Ames, Moffett Field, CA
- Department of the NavySteam turbine governor system replacement, Philadelphia, PA
- Department of the ArmyGovernor control programming at Libby Dam, MT (cancelled)
- Department of the NavyEnvironmental planning for ship homeporting, Norfolk, VA
- Department of the ArmyIntent to Sole Source - Type-C A&E Services for Construction of SFS Facility
- Department of the NavyNetwork lab operation and sustainment for Canadian FMS
- Department of Veterans AffairsLockout/tagout procedures at 3 New York VA hospitals
- National Aeronautics and Space AdministrationProgram Analysis and Control (PAAC V) Bridge
Free · at most one email a morning
Get new notices from Departmental Offices by email
Each morning we'll send the new solicitations and sources-sought notices from Departmental Offices, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy