Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Open, 7 days left
- Deadline
- Nov 23, 12:00 PM ET
- Notice type
- Solicitation
- Set-aside
- Small business set-asideOnly small businesses under the size standard for the NAICS code can bid (FAR 19.5).
- Industry
- Other Heavy and Civil Engineering ConstructionNAICS 237990, Construction
- Place of performance
- Not stated
- Buying office
- W072 Endist PittsburghOffice W911WN, Department of the Army
- Solicitation number
- W911WN27QA005
- Product or service code
- Y1KZ
- Posted
- Oct 22, 2026
- Source
- SAM.govVersion 1, last change seen Nov 16, 2026, 4:30 AM UTC
Notice text
The U.S. Army Corps of Engineers (USACE), Pittsburgh District, has a project as the Canonsburg-Houston Local Protection Project (LPP) is an authorized federal flood damage reduction project spanning over 20,500 linear feet of channel improvements along Chartiers Creek. Originally constructed by USACE in two phases (Houston unit completed in 1970; Canonsburg unit completed in 1976), operation and maintenance responsibilities were subsequently transferred to Washington County. Severe storm events resulted in substantial damage to the channel embankment along the right bank of Chartiers Creek, including displacement of stone protection and loss of subgrade stabilization. This rehabilitation contract encompasses repair and re-armoring of the degraded channel reach to restore federal project integrity and design conveyance capacity. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). The Anticipated Construction Cost is between $150,000.00 and $350,000.00. The North American Industrial Classification Code (NAICS) is 237990 - Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45,000,000.00. Any resultant award will be for one (1) Firm-Fixed-Price (FFP) Purchase Order. The anticipated award date is 11 December 2026. The basis of award will be of best value to the Government. Quotes will be evaluated in accordance with (IAW) RFO Part 13 and 36, price and past performance. The Government reserves the right to reject any quotes that are unrealistically low or exceed available funds for this requirement. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on View FFP Contract Changes Playbook Here.
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Mario TAORMINA, Mario.Taormina@usace.army.mil, 4123957256
- Leanna C. Lesefka, Leanna.C.Lesefka@usace.army.mil, 4123957549
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 16, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Other open notices in other heavy and civil engineering construction
| Notice | Set-aside | Place | Due |
|---|---|---|---|
| USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CADepartment of the Army | Not stated | Not stated | Nov 17Due tomorrow |
| Yaquina River Clamshell Dredging 2027Department of the Army, sources sought | Not stated | Not stated | Nov 17Due tomorrow |
| Kona Low Storm Damage RepairsFederal Emergency Management Agency | Small business | Lahaina, HI | Nov 17Due tomorrow |
| Tampa Harbor Improvements Industry DayDepartment of the Army, special notice | Not stated | Tampa, FL | Nov 182 days left |
| Fort Sill NC Gravesite Expansion and FCA Deficiencies 920CM3006Department of Veterans Affairs | SDVOSB | Elgin, OK | Nov 182 days left |
| KC-46A ADAL Apron and Hydrant Fueling PitsDepartment of the Army | Not stated | Not stated | Nov 182 days left |
| Y FAIR Route 3 - 96-inch CMP Replacement ProjectBureau of Indian Affairs | ISBEE | Not stated | Nov 182 days left |
| East Bear Creek Pumping Plant and Pipeline ModerniDepartmental Offices, sources sought | Not stated | Not stated | Nov 182 days left |
Get new notices from Department of the Army by email
Each morning we send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.