- Opportunities
- Department of Energy
- RFP-376508-CD
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Open, 31 days left
- Deadline
- Dec 17, 4:00 PM CT
- Notice type
- Solicitation
- Set-aside
- None: open to all businesses
- Industry
- Industrial Building ConstructionNAICS 236210, Construction
- Place of performance
- Batavia, IL
- Buying office
- Fermilab - DOE ContractorOffice 899034, Department of Energy
- Solicitation number
- RFP-376508-CD
- Product or service code
- Z2EZ
- Posted
- Oct 30, 2026
- Source
- SAM.govVersion 1, last change seen Nov 16, 2026, 4:30 AM UTC
Notice text
On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026. On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Chris Daley, cdaley@fnal.gov, 6308404256
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 16, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Other open notices in industrial building construction
| Notice | Set-aside | Place | Due |
|---|---|---|---|
| Sources Sought - POST TEST LITHIUM BATTERY STORAGEDepartment of the Navy, sources sought | Not stated | Not stated | Nov 182 days left |
| IE181 - WHS Greenhouse ConstructionBureau of Indian Affairs | ISBEE | Ft. Wingate, NM | Nov 193 days left |
| Y Construction Contract Sources SoughtDepartment of Energy | Not stated | Not stated | Nov 193 days left |
| Tinker AFB 2026 Multiple Award Construction Contract (MACC)Department of the Air Force | Small business, partial | Tinker AFB, OK | Nov 3014 days left |
| Multiple Award Construction Contract (MACC)Department of the Air Force, sources sought | Not stated | Bolling AFB, DC | Nov 3014 days left |
| F-15EX 8-Bay Maintenance Hangar Complex-Industry DayDepartment of the Army, special notice | None | Harrison Township, MI | Dec 115 days left |
| NNSY DD4 Duct Insulation ReplacementDepartment of the Navy | Not stated | Not stated | Dec 1024 days left |
| Travis AFB MACCDepartment of the Air Force, sources sought | Small business | Travis AFB, CA | Dec 1024 days left |
Get new notices from Department of Energy by email
Each morning we send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.