Playground refresh at Keesler AFB, Biloxi, MS

Keesler Air Force Base (AFB) in Biloxi, Mississippi wants playgrounds designed and built at its Child Development Center (CDC) and Youth Center.

Official title: Child Development Center Playgrounds

Deadline
Jan 5, 2027, 10:00 AM CT
41 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Biloxi, MS
Buyer: FA3010 81 Cons

What they're buying

The base award covers design and a preschool playground, and four options add infant, pretoddler, toddler and school-age playgrounds, with 180 calendar days for the base award.

Top catches

Two submission methods conflict
“Sealed offers in original and 1 copies to perform the work required are due at the place” Solicitation - FA301027Q0002.pdf, page 1

Block 13a asks for sealed paper copies at the Item 8 address, but Section L says to email the offer. Ask the contracting officer in writing which method applies before the deadline.

Base pass names due 30 November
“must be sent to the Contract Specialist by 30 November 2026 at 12:00 P.M. CST.” Solicitation - FA301027Q0002.pdf, page 30

Each attendee needs a base pass, which includes a background check, so send names by that date. Bring photo ID, vehicle registration and proof of insurance.

3 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 6 of 21 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Design the playgrounds to 100 percent, with 50 percent and 95 percent design reviews at Keesler AFB.
  • Base award: preschool playground at the CDC, with concrete slabs, installing government-furnished equipment, shade, eight planter boxes and a trike shed pad.
  • Options 1 to 3 at the CDC: infant, pretoddler and toddler playgrounds with demolition, regrading, new 12 by 12 foot storage sheds and surfacing.
  • Option 4 at the Youth Center: school-age playground with a basketball court, about 450 feet of new 6-foot fence, and a fire evacuation pad at least 75 feet from the building.
  • Poured-in-place impact surfacing at least 2-1/2 inches thick under equipment, with a 2 percent slope for drainage.
  • Storm water permits, a storm water pollution prevention plan, and hauling away all demolition debris.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Two submission methods conflict. Block 13a asks for sealed paper copies at the Item 8 address, but Section L says to email the offer. Ask the contracting officer in writing which method applies before the deadline.
  • Base pass names due 30 November. Each attendee needs a base pass, which includes a background check, so send names by that date. Bring photo ID, vehicle registration and proof of insurance.
  • Five years playground experience. Check this before you spend time on the bid. The notice does not say whether a subcontractor's years can count toward this minimum.“Contractor needs a minimum of five years” Attachment 15 - CDC Playground SOW.pdf, page 19
  • Design criteria add LEED and radon. The attached CDC design criteria require a LEED Silver certification and radon testing, and the SOW mentions neither. Ask the contracting officer in writing whether these apply before you price the work.“a LEED Silver level of certification through USGBC and provide the government” Attachment 12 - Specifications 18-1083 Replace Exterior Fencing w CDC Requirements.pdf, page 9
  • Weather days total 90. The notice lists monthly weather delays that total 90 days, and you must build them into your schedule. This likely reduces the time you have inside the 180-day base period, so plan crews and pricing with that in mind.“Contractors shall incorporate inclement weather delays into their schedules” Solicitation - FA301027Q0002.pdf, page 11

Key terms

Who can bidOpen to all businesses, no set-asideSize standard is 19,000,000 dollars in annual receipts, but no set-aside is used. Experience minimums apply.SAM.gov record
Contract period180 calendar days for the base awardDesign takes 120 days and the preschool build 60 days. Each option runs 45 to 75 days.Solicitation - FA301027Q0002.pdf, page 1
How they chooseAll, some or none; lowest price technically acceptableOptions may be funded later or not at all. The technical review is pass or fail.Solicitation - FA301027Q0002.pdf, page 1
How to submitEmail to the Contract Specialist, the Contracting Officer and 81CONS.PKA.Flight@us.af.milOffer has three parts: price, technical and past performance. Block 13a also mentions sealed copies.Solicitation - FA301027Q0002.pdf, page 30
Questions dueWednesday, 16 December 2026, 10:00 A.M. CSTEmail questions about the solicitation and the site visit to the two people in block 7.Solicitation - FA301027Q0002.pdf, page 1
Contract typeFirm fixed price, design and build with four optionsFunded by non-appropriated funds (NAF). FAR and DFARS rules do not apply.Solicitation - FA301027Q0002.pdf, page 4
Site visitWednesday, 9 December 2026, 9:00 AM CSTBase pass names are due 30 November 2026 at 12:00 P.M. CST. Attendance is not stated as mandatory.Solicitation - FA301027Q0002.pdf, page 30

How to respond

  1. Ask the Contract Specialist or the Contracting Officer in writing whether offers go by email or as sealed copies to the Item 8 address.
  2. Email the offer to the Contract Specialist, the Contracting Officer and 81CONS.PKA.Flight@us.af.mil, with separate files for Part I price, Part II technical and Part III past performance. Keep all price information out of Part II.
  3. Keep each file under 50 MB if scanned and the total under 150 MB. Use searchable PDF for every part except the price proposal, and send no zipped or password-protected files.
  4. Include the signed SF 1442, acknowledgment of any amendments, current SAM.gov representations and certifications, CMMC Level 1 (Self) status, and the completed Attachment L-01 reference list.
  5. Submit by Tuesday, 5 January 2027, 10:00 AM local time, and confirm the government received it, since the notice makes verifying receipt your responsibility. If you win, performance and payment bonds are due within 10 calendar days after award.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Whether an offer guarantee is required. Block 13b reads 'is, is not required' and the choice is not clear in the provided text.
  • Whether the 180-day performance period is mandatory or negotiable. Item 11 does not show which word was chosen.
  • Estimated value of the work. The notice gives only a cap on design fees.
  • The technical factors that decide pass or fail (Attachment 16, not included).
  • Wage determination terms and any pay rates (Attachment 17, not included).
  • Where you may use toilets and store equipment. The notice bars existing toilets and states there is no covered or secure storage.

Notice text

Child Development Center Playground Refresh

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 21, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Air Force by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy