Playground refresh at Keesler AFB, Biloxi, MS
Keesler Air Force Base (AFB) in Biloxi, Mississippi wants playgrounds designed and built at its Child Development Center (CDC) and Youth Center.
Official title: Child Development Center Playgrounds
- Deadline
- Jan 5, 2027, 10:00 AM CT
- 41 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Biloxi, MS
- Buyer: FA3010 81 Cons
What they're buying
The base award covers design and a preschool playground, and four options add infant, pretoddler, toddler and school-age playgrounds, with 180 calendar days for the base award.
Top catches
“Sealed offers in original and 1 copies to perform the work required are due at the place” Solicitation - FA301027Q0002.pdf, page 1
Block 13a asks for sealed paper copies at the Item 8 address, but Section L says to email the offer. Ask the contracting officer in writing which method applies before the deadline.
“must be sent to the Contract Specialist by 30 November 2026 at 12:00 P.M. CST.” Solicitation - FA301027Q0002.pdf, page 30
Each attendee needs a base pass, which includes a background check, so send names by that date. Bring photo ID, vehicle registration and proof of insurance.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 6 of 21 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Design the playgrounds to 100 percent, with 50 percent and 95 percent design reviews at Keesler AFB.
- Base award: preschool playground at the CDC, with concrete slabs, installing government-furnished equipment, shade, eight planter boxes and a trike shed pad.
- Options 1 to 3 at the CDC: infant, pretoddler and toddler playgrounds with demolition, regrading, new 12 by 12 foot storage sheds and surfacing.
- Option 4 at the Youth Center: school-age playground with a basketball court, about 450 feet of new 6-foot fence, and a fire evacuation pad at least 75 feet from the building.
- Poured-in-place impact surfacing at least 2-1/2 inches thick under equipment, with a 2 percent slope for drainage.
- Storm water permits, a storm water pollution prevention plan, and hauling away all demolition debris.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Two submission methods conflict. Block 13a asks for sealed paper copies at the Item 8 address, but Section L says to email the offer. Ask the contracting officer in writing which method applies before the deadline.
- Base pass names due 30 November. Each attendee needs a base pass, which includes a background check, so send names by that date. Bring photo ID, vehicle registration and proof of insurance.
- Five years playground experience. Check this before you spend time on the bid. The notice does not say whether a subcontractor's years can count toward this minimum.“Contractor needs a minimum of five years” Attachment 15 - CDC Playground SOW.pdf, page 19
- Design criteria add LEED and radon. The attached CDC design criteria require a LEED Silver certification and radon testing, and the SOW mentions neither. Ask the contracting officer in writing whether these apply before you price the work.“a LEED Silver level of certification through USGBC and provide the government” Attachment 12 - Specifications 18-1083 Replace Exterior Fencing w CDC Requirements.pdf, page 9
- Weather days total 90. The notice lists monthly weather delays that total 90 days, and you must build them into your schedule. This likely reduces the time you have inside the 180-day base period, so plan crews and pricing with that in mind.“Contractors shall incorporate inclement weather delays into their schedules” Solicitation - FA301027Q0002.pdf, page 11
Key terms
| Who can bid | Open to all businesses, no set-asideSize standard is 19,000,000 dollars in annual receipts, but no set-aside is used. Experience minimums apply.SAM.gov record |
|---|---|
| Contract period | 180 calendar days for the base awardDesign takes 120 days and the preschool build 60 days. Each option runs 45 to 75 days.Solicitation - FA301027Q0002.pdf, page 1 |
| How they choose | All, some or none; lowest price technically acceptableOptions may be funded later or not at all. The technical review is pass or fail.Solicitation - FA301027Q0002.pdf, page 1 |
| How to submit | Email to the Contract Specialist, the Contracting Officer and 81CONS.PKA.Flight@us.af.milOffer has three parts: price, technical and past performance. Block 13a also mentions sealed copies.Solicitation - FA301027Q0002.pdf, page 30 |
| Questions due | Wednesday, 16 December 2026, 10:00 A.M. CSTEmail questions about the solicitation and the site visit to the two people in block 7.Solicitation - FA301027Q0002.pdf, page 1 |
| Contract type | Firm fixed price, design and build with four optionsFunded by non-appropriated funds (NAF). FAR and DFARS rules do not apply.Solicitation - FA301027Q0002.pdf, page 4 |
| Site visit | Wednesday, 9 December 2026, 9:00 AM CSTBase pass names are due 30 November 2026 at 12:00 P.M. CST. Attendance is not stated as mandatory.Solicitation - FA301027Q0002.pdf, page 30 |
How to respond
- Ask the Contract Specialist or the Contracting Officer in writing whether offers go by email or as sealed copies to the Item 8 address.
- Email the offer to the Contract Specialist, the Contracting Officer and 81CONS.PKA.Flight@us.af.mil, with separate files for Part I price, Part II technical and Part III past performance. Keep all price information out of Part II.
- Keep each file under 50 MB if scanned and the total under 150 MB. Use searchable PDF for every part except the price proposal, and send no zipped or password-protected files.
- Include the signed SF 1442, acknowledgment of any amendments, current SAM.gov representations and certifications, CMMC Level 1 (Self) status, and the completed Attachment L-01 reference list.
- Submit by Tuesday, 5 January 2027, 10:00 AM local time, and confirm the government received it, since the notice makes verifying receipt your responsibility. If you win, performance and payment bonds are due within 10 calendar days after award.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 15 - CDC Playground SOW.pdfStatement of work for all playground work at both sites. You must price and build to it, and it has no form to sign. Read.
- Attachment 6 - Construction Document Drawings.pdf Not read: over our length limit.
- Attachment 1 - NAF Standard and Construction Clauses.pdf Not read: over our length limit.
- Attachment 11 - Playground Equipment Areas.pdf Scanned image, not read.
- Attachment 14 - LSI Trash Receptacle.pdf Not read: over our length limit.
- Attachment 8 - UFC 4 470 14 - Child Development Centers.pdf Not read: over our length limit.
- Attachment 4 - Storm Sewer Pipe.pdf Scanned image, not read.
- Attachment 3 - Existing Utilities.pdfTwo utility map pages for the CDC and Youth Center with legends only and no readable locations. Read only. Read.
- Attachment 16 - CDC Playground Technical Factors.pdf Not read: over our length limit.
- Attachment 2 - Playground 3D Cutsheets.pdf Scanned image, not read.
- Attachment 18 - Submittal Prodcedures.pdf Not read: over our length limit.
- Attachmen L-02 Past Performance Questionnaire.pdf Not read: over our length limit.
- Attachment 13 - GFE List Musical Equipment.pdf Not read: over our length limit.
- Attachment 17 - Wage Determination.pdf Not read: over our length limit.
- Attachment 12 - Specifications 18-1083 Replace Exterior Fencing w CDC Requirements.pdfFence specification and CDC design criteria, provided for pages 1 to 19 and 173 to 184 only. Pages 20 to 172 were not provided, so you must read them on SAM.gov. No form to sign. Read in part (pages 1–19 and 173–184 of 184).
- Attachment L-01 Past Performance Reference List.pdfBlank form for up to five recent, relevant contracts. You must complete it and send it with your offer. Read.
- Attachment 10 - Drawings - Topo.pdf Scanned image, not read.
- Attachment 7 - UFGS Standard Specifications.pdf Scanned image, not read.
- Solicitation - FA301027Q0002.pdfMain solicitation with offer form, price lines, submission rules and evaluation terms. Pages 1 to 16 and 24 to 34 were provided; pages 17 to 23 were not. You must complete and sign the offer form. Read in part (pages 1–16 and 24–34 of 34).
- Attachment 9 - Civil Drawings Playground - As Built.pdf Scanned image, not read.
- Attachment 5 - GFE List Playground Equipment.pdfList of government-furnished playground equipment and surfacing by area, with weights. Read only, but these are items you install. Read.
Not stated in what we read
- Whether an offer guarantee is required. Block 13b reads 'is, is not required' and the choice is not clear in the provided text.
- Whether the 180-day performance period is mandatory or negotiable. Item 11 does not show which word was chosen.
- Estimated value of the work. The notice gives only a cap on design fees.
- The technical factors that decide pass or fail (Attachment 16, not included).
- Wage determination terms and any pay rates (Attachment 17, not included).
- Where you may use toilets and store equipment. The notice bars existing toilets and states there is no covered or secure storage.
Notice text
Child Development Center Playground Refresh
As published on SAM.gov.
Contacts
- Zachary Willard, zachary.willard.1@us.af.mil, 2283770510
- Tiffany Aultman, tiffany.aultman@us.af.mil, 2283771807
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 5, 2027, 10:00 AM CT41 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238990, all other specialty trade contractors, soonest deadline first.
- Department of the Air ForceOpacity meter inspections at Hanscom AFB, MA
- Department of the Air ForceGATR grounding work, Tyndall AFB (market research)
- Department of the NavyZebra mussel removal and intake repair, Great Lakes, IL
- Department of Veterans AffairsNotice of Intent to Sole Source Perimeter Fence Line and Gates Replacement & Expansion Hines VA Medical Center in Illinois.
- Defense Logistics AgencyDoor repair at Defense Supply Center Richmond, VA
- Department of Veterans AffairsAutomatic door repair at Bedford VA campus, Bedford, MA
- Bureau of Engraving and PrintingEntry plaza renovation and sun sails, Fort Worth, TX
- Departmental OfficesSpecial Notice of Intent to Award to Sole Source
Free · at most one email a morning
Get new notices from Department of the Air Force by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy