Circuit card assembly repair for the Navy
The Navy wants a contractor to repair circuit card assemblies on a 260-day repair turnaround time, with government source inspection and a price reduction for late repairs.
Official title: CIRCUIT CARD ASSEMB
- Deadline
- Nov 27, 3:30 PM ET
- 2 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- $285K
- Likely Lockheed Martin Corporation
- Place
- Not stated
- Buyer: NAVSUP Weapon Systems Support Mech
What they're buying
Quotes are due Friday, November 27, 2026 at 4:30 PM with a -04:00 offset, and the quantity, place of work and set-aside are not stated.
Top catches
“Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late” Notice text
If you miss the 260-day turnaround, the government reduces the price per unit per month you are late, and the reduction is taken at the end of the contract. The notice also keeps the right to terminate for default, so fill in the reduction amount and cap on the quote form only after you know your capacity.
“Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.” Notice text
The 260-day clock starts when the asset is physically received, as entered in the CAV system, and ends at government acceptance. You must report each receipt in CAV by the end of the fifth regular business day after receipt, so plan staff and records for that.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Repair circuit card assemblies under CAGE 70876, reference C810785G1, as listed in the notice
- Complete repair within 260 days of asset return, with final government inspection and acceptance inside that window
- Government source inspection is required; perform inspection and testing to the original manufacturer's specifications and drawings
- Mark items in accordance with MIL-STD-130, REV N, 17 DEC 2007
- Preserve and package items per MIL-STD 2073, as found in the schedule
- Option for increased quantity at the unit price, exercisable within 365 days after award
Who supplied it lately
$285K
on a recent contract for the same kind of product: Lockheed Martin Corporation. It ends Nov 27, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Late repair price reduction. If you miss the 260-day turnaround, the government reduces the price per unit per month you are late, and the reduction is taken at the end of the contract. The notice also keeps the right to terminate for default, so fill in the reduction amount and cap on the quote form only after you know your capacity.
- Turnaround clock and CAV reporting. The 260-day clock starts when the asset is physically received, as entered in the CAV system, and ends at government acceptance. You must report each receipt in CAV by the end of the fifth regular business day after receipt, so plan staff and records for that.
- Cybersecurity level not stated. The notice includes a CMMC level clause but does not say which level applies. Confirm your required CMMC level with the contracting office before you bid, because a missing certification could make you ineligible.“NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))” Notice text
- Conflicting freight terms. The notice says all freight is FOB Origin and also says the Navy handles freight. Ask the contracting office who pays shipping in each direction before you price the repair.“All freight is FOB Origin.” Notice text
- Price must match past pricing. If your price differs from historical pricing, you must explain the basis, and prior sales need a copy of your invoice. Gather past invoices and a written pricing basis before you quote.“If pricing is not in line with historical pricing, provide the basis of your company's pricing.” Notice text
- Option priced at the same unit rate. The government may add quantity at the same unit price in the option period. Set your unit price so you can deliver extra units at that rate, since the quantity is not stated.“The Government may increase the quantity of supplies called for in the Schedule at the unit price specified.” Notice text
Key terms
| Contract period | Not statedAn option for increased quantity may be exercised within 365 days after award.Notice text |
|---|
How to respond
- Confirm your required CMMC level and any other certifications with the contracting office before you price the work, since the notice does not state the level.
- Complete the quote form: unit price, total price, RTAT in days, and if you cannot meet 260 days, your capacity constraints.
- Include the price reduction amount per unit per month and the maximum cap, and any T&E fee basis if an asset is beyond repair.
- Send the quote to Kailyn Muro at Kailyn.m.muro.civ@us.navy.mil or 771-229-0523. The notice does not state the submission method, so confirm it with her.
- Have the quote reach the government by Friday, November 27, 2026 at 4:30 PM, -04:00. If you win, sign the bilateral acceptance before the contract is executed.
Not stated in what we read
- Quantity of circuit card assemblies to repair, and the estimated value.
- Where the assets will be shipped and repaired, since the place of performance is blank.
- How and where quotes must be submitted, and whether email is accepted.
- The evaluation method and how the award will be chosen.
- Base contract length and the part number, NSN or item nomenclature being repaired.
- Which CMMC level applies and whether certification is needed before award.
Notice text
CONTACT INFORMATION|4|N7M1.15|HSB|771-229-0523|Kailyn.m.muro.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE & RECEIVING||TBD|N00104|TBD|TBD|See schedule|See schedule|See schedule||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Kailyn Muro| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 days after date of award.| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| CASREP ACCELERATED DELIVERY IS ENCOURAGED AND ACCEPTED AT NO ADDITIONAL COST TO GOVERNMENT.
All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's signed acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 260 days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.
For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ IF ITEM NOT PREVIOUSLY PURCHASED BY NAVSUP WSS - or - PRICES INCREASED Provide the NSN of a similar item or, if current NSN is an upgrade part, provide the previous NSN. If previously sold to another buying activity or in the commercial marketplace, provide a copy of your company's invoice (redacted versions are acceptable).
If pricing is not in line with historical pricing, provide the basis of your company's pricing. TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment.
The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________. AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":__________ The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified.
The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction.
If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a ""reconciliation modification"" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1.
SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the CIRCUIT CARD ASSEMB . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.
CAGE___Ref. No. ;70876 C810785G1; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 17 DEC 2007.; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order.
When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation.
When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts.
Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein.
Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.
The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.
4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format.
Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document.
On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH.
6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited.
B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161.
As published on SAM.gov.
Contacts
- Telephone: 7176051350, KAILYN.M.MURO.CIV@US.NAVY.MIL
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Navy for the same kind of product (NAICS 334412, product code 5998) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| SepaLockheed Martin Corporation · N0010425FCU04 | $285,000 | Nov 27, 2026within a month | VA |
| Circuit Card AssembRaytheon Company · N0010425PUA53 | $317,142 | Nov 20, 2026ended | FL |
| Circuit Card AssyNorthrop Grumman Systems Corporation · N0010425PYB41 | $231,860 | Nov 18, 2026ended | MD |
| Circuit Card AssembRaytheon Company · N0010425CSA01 | $1,268,522 | Nov 16, 2026ended | MA |
| Circuit CardHamilton Sundstrand Corporation · N0010426FVV02 | $100,000 | Nov 13, 2026ended | CT |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 27, 3:30 PM ET2 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 334412, bare printed circuit board manufacturing, soonest deadline first.
- Department of the NavyRepair of circuit card assemblies for the Navy
- Defense Logistics AgencyManufactured circuit cards for Defense Logistics Agency
- Defense Logistics AgencyTwo F-16 circuit card assemblies for foreign military sales
- Department of the NavyCircuit card repair for Navy, Endicott, NY
- Department of the NavyRepair of 28 Navy circuit card and cooler units
- Department of the NavyRepair of circuit card assemblies for Navy supply
- Department of the NavyRepair of electronic components and altered laptop for Navy
- Department of the NavyRepair of 24 circuit card assemblies for the Navy
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy