Compressor unit repair for U.S. Navy
The Navy wants a firm-fixed price to fully repair a COMPRESSOR UNIT,REC under a sole source repair requirement, with a requested 150-day turnaround per asset.
Official title: COMPRESSOR UNIT,REC
- Deadline
- Dec 21, 3:30 PM ET
- 25 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- $1.14M
- Likely Rix Industries
- Place
- Not stated
- Buyer: NAVSUP Weapon Systems Support Mech
What they're buying
The notice gives no quantity or place of work, and the response deadline is Monday, December 21, 2026.
Top catches
“2026-12-21T16:30:00-04:00” SAM.gov record
The deadline is 4:30 PM at a -04:00 offset, as written. Convert it to your own clock and plan to submit well before that time.
“This is an Advanced Equipment Repair Program (AERP) sole source repairrequirement.” Notice text
The notice describes this as a sole source repair. Call the buyer to confirm they will accept offers from you before you spend time on a full proposal.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Fully repair the compressor unit to CAGE 93236 drawing 200134AE and SUBMEPP Repair Instruction NO. 5130-012-0682 REV I (CSD702), except as amended.
- Replace parts in line with the technical data package and the repair instruction.
- Price all work to make the unit serviceable, including damaged, missing or worn parts, missing hardware, and handling damage.
- Report all transactions in CAV by the end of the fifth regular business day after receipt.
- Package per MIL-STD 2073 as found elsewhere in the schedule.
- Deliver within the requested 150-day repair turnaround, measured from asset return to Government acceptance.
Who supplied it lately
$1.14M
on a recent contract for the same kind of product: Rix Industries. It ends Dec 6, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Deadline uses -04:00 offset. The deadline is 4:30 PM at a -04:00 offset, as written. Convert it to your own clock and plan to submit well before that time.
- Sole source repair requirement. The notice describes this as a sole source repair. Call the buyer to confirm they will accept offers from you before you spend time on a full proposal.
- Late-asset price reduction is TBD. If you miss the turnaround, each late asset reduces your price. The amount is blank (TBD), so you cannot size this risk. Ask the buyer for the figure before you price the job.“will incur a price reduction of (TBD Price) per unit” Notice text
- 150-day turnaround clock. The 150 days run from physical receipt of the asset at your facility to Government acceptance. Check your capacity and throughput before you commit to that date.“a)Requested RTAT: 150 Days” Notice text
- Cost of new item required. Your proposal must include the cost of new or estimated cost of new. It must also give your teardown rate, RTAT, throughput constraint and induction expiration date. Missing items could leave your proposal incomplete.“Please include the cost of new or estimated cost of newwith the submitted proposal.” Notice text
- OEM authorization letter needed. If you are not the original manufacturer, name the OEM with its company name and CAGE. You must also supply a signed letter of authorization on the OEM's letterhead, so get it before you bid.“the Offeror must be able to provide a signed letter of authorization toperform repairs from the OEM on the company's letterhead.” Notice text
Key terms
| Who can bid | Sole source repair; set-aside not statedThe notice calls this a sole source repair. The SAM.gov record gives no set-aside.Notice text |
|---|---|
| Contract type | Firm-fixed price repairPrice the full repair effort as one firm-fixed price.Notice text |
How to respond
- Call or email the buyer, Robert H. Langel, at robert.h.langel.civ@us.navy.mil or 771-229-1967, to confirm you can bid on this sole source repair.
- Submission method: Not stated. Ask the buyer whether proposals go by email, portal or mail, and confirm the address.
- Include a firm-fixed price for the full repair, the cost of new or estimated cost of new, teardown and evaluation rate, proposed RTAT, throughput constraint and induction expiration date.
- If you are not the OEM, name the OEM with company name and CAGE and attach a signed letter of authorization on its letterhead.
- Send your proposal by Monday, December 21, 2026, 4:30 PM (-04:00). Certification documents must go through WAWF to the maximum extent possible.
Not stated in what we read
- Quantity of compressor units and estimated contract value. The notice gives neither.
- How and where to send your proposal, and whether questions are accepted and by when.
- Place of performance and contract period, including any option years.
- Evaluation and award basis. The clause is listed by title only and its text is not provided.
- Dollar amount of the price reduction per late unit (listed as TBD).
- Drawing 200134AE, repair instruction 5130-012-0682 REV I, and CSD489, CSD490, CSD491 and CSD702 are referenced but not provided here. I could not review them. You must obtain them from ECDS and read them before pricing.
Notice text
CONTACT INFORMATION|4|N742.16|WR2|771-229-1967|robert.h.langel.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|TBD|N60138 QTY 2|TBD|N/A|N/A|N/A|TBD|N/A|N/A|See form DD1423|| MONETARY LIMITATION REPAIR PURCHASE ORDERS|1|TBD| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECH| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| EVALUATION-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEV 2026-O0028)(FEB 2026))|3|||| 1.This is an Advanced Equipment Repair Program (AERP) sole source repairrequirement.
2.Please provide a Firm-Fixed Price (FFP) proposal for the full repair effortof the requirement. Please include the cost of new or estimated cost of newwith the submitted proposal. 3.In repair price, include all costs associated with receipt and completerepair of the material that may be in unwhole condition, missing hardware,damaged, handling damage, missing parts, wear damage, and CAV Reporting. Alsoprovide the following information: a.Teardown & Evaluation Rate: b.Repair Turn Around Time (RTAT): c.Throughput Constraint: d.Induction Expiration Date: 4.Repair Turn Around Time (RTAT) - the resultant contractual deliveryrequirement is measured from the asset return to the asset acceptance underthe terms of the contract.
For purposes of this section, return is defined asphysical receipt of the F-condition asset at the contractor's facility asreflected in the Action Date entry in the Commercial Asset Visibility (CAV)system. In accordance with the CAV Statement of Work, the contractor isrequired to accurately report all transactions by the end of the fifth regularbusiness day after receipt and the Action Date entered in CAV must be dated toreflect the actual date of physical receipt.
The contractor must obtain finalinspection and acceptance by the Government for all assets within the RTATestablished in the contract. a)Requested RTAT: 150 Days b)Proposals shall reference the proposed RTAT and any capacity constraints. 5.Price Reductions - Any asset for which the contractor does not meet therequired RTAT will incur a price reduction of (TBD Price) per unit. Thisadjustment will be implemented via a Reduction Modification at the end ofcontract performance.
Price reductions made pursuant to this section shall notlimit other remedies available to the Government for failure to meet requiredRTATs, including but not limited to the Government's right to terminate fordefault. 6.If requirement will be packaged at a location different from the Offeror'saddress, the Offeror shall provide the Company Name, Street Address and CAGE ofthe Packaging Facility. 7.If the Offeror is not the Original End Manufacturer (OEM) of the materialcalled out in the requirement, the OEM must be stated (Company Name and CAGE),and the Offeror must be able to provide a signed letter of authorization toperform repairs from the OEM on the company's letterhead.
8.All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce method such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
9.The contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTAT established in the resulting contract. 10.Any contract awarded as a result of this solicitation will be DO certifiedfor national defense under the Defense Priorities and Allocations System(DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense,Emergency Preparedness, and Energy Program Use, shall be inserted insolicitations when the contract to be awarded will be a rated order. \ 1.
SCOPE 1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the COMPRESSOR UNIT,REC . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS 3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;93236; , drawing ;200134AE; ,and the applicable SUBMEPP Repair Instruction ;NO. 5130-012-0682 REV I (CSD702); , except as amplified or modified herein. 3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction. 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD489, CSD490, CSD491, and CSD702; in ECDS at https://register.nslc.navy.mil/ 4.
QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. 5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6.
NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
As published on SAM.gov.
Contacts
- Telephone: 7176053353, ROBERT.H.LANGEL.CIV@US.NAVY.MIL
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Navy for the same kind of product (NAICS 333914, product code 4310) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| CompressorRix Industries · N0010423CZA24 | $1,142,857 | Dec 6, 2026within a month | CA |
| Compressor Unit, RotMeggitt Defense Systems, Inc. · N0010426PJA62 | $188,273 | Nov 9, 2026ended | CA |
| Pump Assembly, OilJohnson Controls Navy Systems, LLC · N0010426PTB41 | $201,039 | Dec 21, 2026within a month | PA |
| Fixture Assembly, GThe Boeing Company · N0010425PUB15 | $159,400 | Dec 22, 2026within a month | CA |
| Vacuum Pump Unit, RoGardner Denver Nash LLC · N0010424CZA28 | $936,149 | Jan 6, 2027in 1 month | PA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 21, 3:30 PM ET25 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 333914, measuring, dispensing, and other pumping equipment manufacturing, soonest deadline first.
- Defense Logistics AgencyCentrifugal pumps for Defense Logistics Agency
- Department of the NavyReciprocating pump repair and overhaul for the Navy
- Defense Logistics AgencyRotary pumps for DLA Aviation, Philadelphia, PA
- Department of the NavyRepair of rotary pump units for the Navy
- Defense Logistics Agency624 fluid filter elements for DLA San Joaquin distribution
- Defense Logistics Agency21 pressure pumping kits for DLA Distribution Red River
- Department of the NavyPlunger pump assembly repair for the Navy
- Department of the NavyRepair of rotary pump units for the Navy
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy