1. Opportunities
  2. Department of Defense
  3. Department of the Army
  4. W912WJ27X1CUP

Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.

Open, 17 days left

Deadline
Dec 3, 1:00 PM ET
Notice type
Sources Sought
Set-aside
Not stated
Industry
Other Heavy and Civil Engineering ConstructionNAICS 237990, Construction
Place of performance
Concord, MA
Buying office
W2SD Endist New EnglandOffice W912WJ, Department of the Army
Solicitation number
W912WJ27X1CUP
Posted
Oct 28, 2026
Source
SAM.govVersion 1, last change seen Nov 16, 2026, 4:30 AM UTC

Notice text

The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement for the upcoming dredging project located in Providence, Rhode Island. This announcement is to determine the interest, availability and capability of Small and Large Business concerns as described below. The NAICS code for this procurement is 237990. The solicitation for this project is anticipated to be issued on or about 15 March 2027. The construction will begin in September 2027 and is expected to take approximately 2 years to complete. The estimated construction cost is between $80,000,000 and $100,000,000. The Providence River Maintenance Dredging project involves two major sequences of dredging and disposal activities. The first work sequence will be the construction of a new Confined Aquatic Disposal (CAD) cell adjacent to the Providence River. The second work sequence under this contract will include maintenance dredging of the Providence River and Harbor Federal Navigation Project (FNP) to its authorized depths and dimensions. The proposed work consists of mechanically dredging approximately 5,500,000 cubic yards (cy) of material using closed clamshell buckets for both major sequences of work over the course of two years. The new CAD cell will be in the Edgewood Basin area located adjacent to the Providence FNP (hereafter the “Edgewood Shoals North (ESN) CAD cell”). To access the CAD cell area, an access channel will be dug between the Providence FNP and the CAD cell area. The access channel will be approximately 100 ft wide and -25 MLLW deep. The CAD cell will have surface dimensions of approximately 1000 ft. by 1000 ft. and be dug to a depth of -60 MLLW. The material excavated to build the access channel is generally a mix of sandy silt and shell fragments. Within the CAD cell area the material is generally described as soft grey to black organic silt with some layers of firm sandy silt and some shell fragments and coarse-grained material. Material excavated from the access channel and CAD cell area will be placed at four locations: Port Edgewood Basin, the Fox Point Reach CAD cells, Prudence Island Disposal Site, and the Rhode Island Sound Disposal Site. This work consists of mechanically dredging approximately 3,200,000 cy to construct thew ESN CAD cell and its access channel, which must be completed before maintenance dredging of the FNP can begin. The maintenance dredging proposed work consists of mechanically dredging the Providence River FNP to the full -40 MLLW depth plus 2-feet of allowable overdepth. 2,300,000 cy (1,200,000 cy required depth, with up to 1,100,000 cy overdepth) of shoaled material consisting generally of poorly graded medium to fine sand with silt. The dredge material from this maintenance portion of work will be placed in the ESN CAD cell. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. All dredging and disposal activities for this project have prescribed work windows that incorporate environmental and recreational time of year restrictions. Refer to the Draft Specification Section provided with this announcement for specifics on the time of year work restrictions. In order to accomplish all dredging requirements within the specified dredging window it is expected that the Contractor will need to meet a production rate of 300,000 CY per 30 calendar days. The U.S. Army Corps of Engineers, New England District is requesting responses to the questions below from both small and large businesses[MC1] . Draft drawings showing a concept design plan and draft Specification Section of 01 11 00 SUMMARY OF WORK have been provided with this announcement to help provide more context for the contract work and responses to these questions. Considering the different disposal locations, are there suggestions on a bid structure that will provide for the most accurate costs of different disposal locations? Any draft restrictions that may impact dredging and/or disposal operations? Any concerns on the period of performance of September 2027 to September 2029 considering the environmental windows and amount of work? If so, why? Any comments about the bed leveling planned in the Fox Point Reach? Are there concerns about this part of the plan, if so, why? Interested firms should also demonstrate their project experience, by providing two (2) projects within the last ten years, which meet the following requirements: Dredging by mechanical means demonstrating a minimum production rate of 300,000 cubic yards in one consecutive 30-day period. Experience with placement of dredged material at an open water placement site in New England during the fall/winter months of October through March. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, etc.), type of equipment the firm is proposing to use on the project, and two (2) example projects performed by the firm in the last ten (10) years (including Points of Contact for those projects) showing experience with the proposed equipment at the production rate listed above. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications meeting the same qualifications listed above, which will be used to support the bidder's effort. Firms may use subcontractor experience to demonstrate experience with the requirements, but the role and work performed by each team member (prime and subcontractors) on projects demonstrating that team member's experience shall be the same as the role for that team member for this project. Bid bond will need to be provided with the bid. Responses are limited to twenty pages and due by December 03 , 2026. Responses should be addressed to the U.S. Army Corps of Engineers, New England District, 696 Virginia Road, Concord, MA 01742-2751, ATTN: Kyle Hall, or electronically to Kyle.K.Hall@usace.army.mil. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. Government Agency URL: www.nae.usace.army.mil Government Agency URL Description: New England District, Corps of Engineers

As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 16, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Other open notices in other heavy and civil engineering construction

NoticeSet-asidePlaceDue
USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CADepartment of the ArmyNot statedNot statedNov 17Due tomorrow
Yaquina River Clamshell Dredging 2027Department of the Army, sources soughtNot statedNot statedNov 17Due tomorrow
Kona Low Storm Damage RepairsFederal Emergency Management AgencySmall businessLahaina, HINov 17Due tomorrow
Tampa Harbor Improvements Industry DayDepartment of the Army, special noticeNot statedTampa, FLNov 182 days left
Fort Sill NC Gravesite Expansion and FCA Deficiencies 920CM3006Department of Veterans AffairsSDVOSBElgin, OKNov 182 days left
KC-46A ADAL Apron and Hydrant Fueling PitsDepartment of the ArmyNot statedNot statedNov 182 days left
Y FAIR Route 3 - 96-inch CMP Replacement ProjectBureau of Indian AffairsISBEENot statedNov 182 days left
East Bear Creek Pumping Plant and Pipeline ModerniDepartmental Offices, sources soughtNot statedNot statedNov 182 days left

All open notices under NAICS 237990

Get new notices from Department of the Army by email

Each morning we send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.