  4. SPE60326R0526

Fuel storage and sales at two Fort Bragg sites, NC

DLA Energy wants a contractor to own, build, operate and maintain two bulk and retail fuel facilities at Fort Bragg, NC, one at East Bragg and one at the 82nd ABN site.

Official title: Contractor-owned, Contractor-operated (COCO) bulk retail services at two locations on Fort Bragg, NC.

Deadline
Dec 7, 9:00 AM ET
11 days left
Who can bid
Not stated
The notice names no set-aside
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Fort Bragg, NC
Buyer: DLA Energy

What they're buying

The contract can run up to 360 months including options, and offers for only one site will not be accepted.

Top catches

Both sites or no bid
“Only offers for both locations will be accepted.” Attachment XV-Preproposal Questions and Answersfinal.pdf, page 26

The Government will accept offers for both locations only, and it will make one award. If you cannot staff and build two sites, do not bid.

Deadline may have changed
“Amendment 0006 (issued systematically as Amendment 0005 in error) is issued to extend the proposal due date from October 2, 2026 at 1700 EST Fort Belvoir to October 30, 2026 at 1700 EST Fort Belvoir.” Amendment 0006.pdf, page 2

SAM.gov shows Monday, December 7 at 9:00 AM at -05:00, but an amendment in this packet set October 30, 2026. Several amendments could not be read, so check SAM.gov for the latest version before you plan your bid.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 7 of 22 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Design, permit, build and equip two new fuel facilities, including tanks, dispensers, bulk loading, a 20-foot canopy, an operations building and backup generators.
  • Run retail and bulk fuel receipt, storage and issue, with dispensers ready to issue 24 hours a day and bulk service during posted duty hours.
  • Sample and test fuel, and ship samples to an approved lab within 72 hours. Testing and shipping costs are yours.
  • Keep inventory and accounting in government systems (FMD, EPoS and EBS) and reconcile each month within 2 days of month end.
  • Maintain tanks, piping and equipment, keep records in a maintenance system, and handle spill response and hazardous waste disposal.
  • Keep video surveillance for 30 days, staff with CAC cards, and restore the land at contract end.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Both sites or no bid. The Government will accept offers for both locations only, and it will make one award. If you cannot staff and build two sites, do not bid.
  • Deadline may have changed. SAM.gov shows Monday, December 7 at 9:00 AM at -05:00, but an amendment in this packet set October 30, 2026. Several amendments could not be read, so check SAM.gov for the latest version before you plan your bid.
  • Payment starts at acceptance. Monthly payments start only after DLA accepts each facility, and both sites must be operational within 12 months of award. You fund design, permits and construction before any payment, so price that carrying cost.“Payments begin after facility acceptance per PWS Att A section 1.A.” Attachment XV-Preproposal Questions and Answersfinal.pdf, page 28
  • Permanent backup generator needed. Portable generators do not meet the requirement. Price permanent backup generators with automatic transfer that keep the facility fully running during outages.“Portable generators with a response plan fails to meet this requirement.” Attachment XV-Preproposal Questions and Answersfinal.pdf, page 8
  • Wage classes are fixed. Staff must be priced to the listed wage classes, and alternate titles are not accepted. Keep daily time records for staff who do more than one job, or pay them at the highest applicable rate.“Alternate classifications will not be accepted.” Attachment XV-Preproposal Questions and Answersfinal.pdf, page 29
  • Award basis conflicts. The Q&A says award will be LPTA, but it also says discussions will be held and award may be made without them. Ask the contracting officer which method applies before you price.“The Government intends to evaluate offers and award a contract with negotiations with offerors, however, reserves the right to award without negotiations.” Attachment XV-Preproposal Questions and Answersfinal.pdf, page 27

Key terms

Contract periodUp to 360 months, including optionsBase period starts August 1, 2027. The final option may run to January 31, 2056.Attachment XV-Preproposal Questions and Answersfinal.pdf, page 27
How they chooseLPTA, with discussions possibleThe Q&A describes LPTA but also says discussions will be held. The texts conflict; see catches.Attachment XV-Preproposal Questions and Answersfinal.pdf, page 27
Contract typeFirm fixed price, paid monthlyThe contractor covers all costs, including repairs and after-hours response.Att 1 - Ft Bragg COCO Services PWS (30Oct2026) changes highlited.pdf, page 6
Site visitPre-proposal conference already passedSupplemental site visits may be coordinated after award, according to the Q&A.Attachment XV-Preproposal Questions and Answersfinal.pdf, page 30

How to respond

  1. Check SAM.gov for the current due date and every amendment. The provided text does not state where or how to send an offer: Not stated.
  2. Offer both locations. One award covers both, and common content may be listed once if it is marked for both.
  3. Keep the technical proposal to 75 pages per location offered. Drawings, schedules, equipment cut sheets and resumes count toward that limit.
  4. Include the staffing plan with your proposal, along with design details and schematics for each site.
  5. Complete the past performance reference list in Attachment V using three references, plus up to two DLA Energy contacts if you have them.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • How to submit the offer, including the address, portal and format: Not stated in the provided text.
  • Estimated contract value: Not stated in the provided text.
  • Whether any amendment after October 30, 2026 changed the deadline or terms; amendments 0002, 0003, 0004, 0005 and 0008 were scanned and could not be read.
  • Which wage determination revision applies, Rev 30 or Rev 31; the wage determination file could not be read and must be checked.
  • Terms in the main solicitation (SPE603-26-R-0526) and the environmental condition reports for both sites (Attachments XIII and XIV), which were not reviewed. You must read them yourself.
  • The cutoff date for questions, and whether questions are still open.

Notice text

The requirement is for non-personal, Contractor-Owned, Contractor-Operated (COCO) fuel storage, operations, and distribution at two locations on Fort Bragg, NC. The contractor will be responsible for the management, operation, maintenance, product quality surveillance, inventory control and accounting, security, safety, and environmental protection of the COCO fuel facilities at DFSP Fort Bragg, NC

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 25, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Defense Logistics Agency by email

Each morning we'll send the new solicitations and sources-sought notices from Defense Logistics Agency, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy