1. Opportunities
  2. Department of Defense
  3. Department of the Army
  4. W912HV26RA009

DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan

Open, 69 days left

Deadline
Jan 25, 2027, 2:00 PM UTC+09:00
Notice type
Solicitation
Set-aside
Not stated
Place of performance
Not stated
Buying office
W2SN Endist JapanOffice W912HV, Department of the Army
Solicitation number
W912HV26RA009
Product or service code
Y1NA
Posted
Oct 19, 2026
Source
SAM.govVersion 1, last change seen Nov 16, 2026, 4:30 AM UTC

Notice text

Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 16, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Other open notices in oil and gas pipeline and related structures construction

NoticeSet-asidePlaceDue
Gas Line RepairDepartment of the Air Force, sources soughtSmall businessOffutt AFB, NENov 17Due tomorrow
NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American LakeDepartment of Veterans AffairsSDVOSBTacoma, WANov 17Due tomorrow
FMC Rochester- Install Above Ground TanksFederal Prison System / Bureau of PrisonsNoneRochester, MNNov 193 days left
WH Ford RTC Fueling System RepairsDepartment of the ArmySmall businessNot statedNov 237 days left
Mather Fueling System RepairsDepartment of the ArmySmall businessMather, CADec 418 days left
API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, AlaskaDepartment of the Army, presolicitation8(a)Not statedNo deadline stated

All open notices under NAICS 237120

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

Free. We use your email only for these alerts and never share it. Privacy