- Opportunities
- Department of Defense
- Department of the Army
- W519TC-27-R-B129
Renovate lunch and locker room, McAlester Army plant, OK
Sources sought notice asking firms to show they can design and build a renovated Building 129 lunch and locker room facility at McAlester Army Ammunition Plant, Oklahoma.
Official title: Design and Construction of a Modernized Facility (Building 129 Lunch and Locker Room Facility) at McAlester Army Ammunition Plant (MCAAP)
- Deadline
- Nov 23, 12:00 PM CT
- 3 days left
- Who can respond
- Any business
- Market research, not a bid
- Last time
- $8.85M
- Likely Southwind Construction Services, LLC
- Place
- Mcalester, OK
- Buyer: W6QK ACC-Ri
What they're buying
Responses go by email by 12:00 PM CDT on 23 November 2026, and no contract value or period is stated.
Top catches
“no later than 12:00 PM CDT on 23 NOVEMBER 2026” Notice text
The amendment says 12:00 PM CDT. The SAM.gov record says 12:00 PM at minus 06:00. Noon CDT comes one hour earlier, so plan to send before 12:00 PM CDT on Monday, November 23.
“Responses shall be submitted electronically via e-mail to the POCs listed below” Notice text
Responses must go by email to contacts the notice calls listed below, but no contact list is in the text we could review. Confirm the email addresses on the SAM.gov notice before the deadline and keep a copy of what you send.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 3 of 6 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Demolish the east wing of Building 129 (base scope), including foundations, and backfill to grade. The existing building has 24,310 sq ft interior.
- Build a two-story pre-engineered metal building with foundation, finished interiors and utility systems (base scope).
- Option 1: keep the existing ground floor and central block and renovate it. Option 2: demolish the west wing and build a one-story building instead.
- Interior fit-out for men's, women's and unisex locker rooms, a lunch room, offices, a conference room and a shower room.
- Civil site work per the site plan, with soil retaining walls where the wings are removed.
- The drawings are marked concept development, so final design and quantities are not given.
Who did it before
$8.85M
on the contract that likely holds this work now: Southwind Construction Services, LLC. It ends Jan 11, 2027.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Deadline time zone conflicts. The amendment says 12:00 PM CDT. The SAM.gov record says 12:00 PM at minus 06:00. Noon CDT comes one hour earlier, so plan to send before 12:00 PM CDT on Monday, November 23.
- Email only, contacts not listed. Responses must go by email to contacts the notice calls listed below, but no contact list is in the text we could review. Confirm the email addresses on the SAM.gov notice before the deadline and keep a copy of what you send.
- Statement of Work not readable. The Statement of Work and the notice PDF are scanned images, so we could not review them. The notice says more information is in the attachments. Open those files on SAM.gov and read them before you price or respond.“Additional information regarding SSN can be found in attachments” Notice text
- Business day count does not match. The amendment gives 23 November but calls it the 5th business day after posting. Counted from the 18 November posting, the 5th business day is 25 November. Treat 23 November as the deadline.“on 23 NOVEMBER 2026 the 5th business day following official publication” Notice text
- Site visit needs advance details. If you plan to visit Building 129 on 12/09/2026, send each visitor's details at least 72 hours ahead. Every visitor needs Real ID compliant identification to enter the installation. The notice does not say whether the visit is required.“least 72 hours prior to the intended site visit” Attachment 0004.1 - Site Visit Requirements.pdf, page 1
- Drawing issue dates differ. The cover sheet says the drawings were issued 10 AUG 2026, but the title blocks say 10 JUL 2026. The sheets are also marked concept development. Ask which set is current before you price.“10 AUG 2026” Attachment 0003 - Project_Designs.pdf, page 1
Key terms
| Who can bid | Any interested source; traditional, non-traditional and consortia encouragedSet-aside is shown as Not stated in the SAM.gov record.Notice text |
|---|---|
| How they choose | Capabilities shown in response to the follow-on request for solutionsResponses are market research; they are not a bid.Notice text |
| How to submit | Email to the points of contact named in the noticeThe contact emails are not in the text we could review.Notice text |
| Contract type | Stand-alone other transaction agreement (OTA), not finalThe approach may change. The notice also cites 10 U.S.C. 4022 and FAR Part 12.Notice text |
| Site visit | 12/09/2026, requested 0900 to 1100Meeting point is Bldg 129. The notice does not say whether a visit is required.Attachment 0004.1 - Site Visit Requirements.pdf, page 1 |
How to respond
- Confirm the email addresses of the points of contact named in the notice, since they are not in the text we could review.
- Email a written statement of your capabilities to perform the work described in this notice. Format and page limits: Not stated.
- Send it by 12:00 PM CDT on Monday, 23 November 2026, and treat that as the deadline.
- Send any input on the strategy under separate cover to the same contacts.
- If you plan to attend the site visit on 12/09/2026, send the required details to the ACC-RI specialist at least 72 hours before.
Attached files
- Attachment 0004.2 - MF190-20 MCAAP.pdfWe could not review this file, because the text extracted was only a PDF viewer message. You must open it on SAM.gov and read it. Read.
- Attachment 0003 - Project_Designs.pdfConcept drawings for the Building 129 renovation, including phasing, floor plans and a civil site plan. Read only; you do not sign it. Read.
- Attachment 0004 - Site Visit Requirements.pdf Scanned image, not read.
- Sources Sought Notice (SSN)_Corrected.pdf Scanned image, not read.
- Attachment 0002 - Statement of Work.pdf Scanned image, not read.
- Attachment 0004.1 - Site Visit Requirements.pdfVisitor instructions for MCAAP site visits. Read it; if you visit, you must complete the gate pass form it refers to and send the listed details. Read.
Not stated in what we read
- Estimated value or budget for the work.
- Contract period, schedule and completion dates.
- Set-aside status and size standard; the SAM.gov record says Not stated.
- Email addresses of the points of contact, and whether the site visit is required.
- Full requirements in the Statement of Work, which we could not read.
- Whether the follow-on will be an OTA or a FAR contract, and when it will be issued.
Notice text
AMENDMENT 0002 Amendment 0002 hereby issued against Sources Sought Notice W519TC-27-R-B129. Changes: From Original language: Submission Instructions, Delivery: Responses shall be submitted electronically via e-mail to the POCs listed below no later than 12:00 PM CDT on the 5th calendar day following official publication. To Revised language: Submission Instructions, Delivery: Responses shall be submitted electronically via e-mail to the POCs listed below no later than 12:00 PM CDT on 23 NOVEMBER 2026 the 5th business day following official publication. All terms and conditions remain unchanged. ****************************************************************************************************************************************************** AMENDMENT 0001 Amendment 0001 is hereby issued against Sources Sought Notice W519TC-27-R-B129.Changes: From Original language: Description: The Army Contracting Command–Rock Island (ACC-RI), on behalf of the Project Lead Joint Services (PL JS) and the McAlester Army Ammunition Plant (MCAAP) Directorate of Public Works (DPW), is seeking capable sources for the design and construction of a modernized facility (Renovation and Modernization of Building 129, Lunch and Locker Room Facility) capable of supporting consolidated personnel operations at MCAAP while complying with strict Department of Defense physical security, environmental, and facility modernization standards. The United States Government (Government) intends to utilize the information submitted in response to this Sources Sought Notice (SSN) to issue a follow-on Request for Solutions (RFS) that will encompass the full requirement for the modernized Building 129 facility. The Government is contemplating using a Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants) to satisfy this requirement. This authority allows the Department of Defense to carry out repair and construction projects for facilities outside the traditional Federal Acquisition Regulation (FAR) framework. However, if the acquisition approach changes, the information obtained from this SSN will be utilized in the planning and award of the project. The Government's intent is to award the proposed transaction(s) based on the capabilities demonstrated in response to the follow-on RFS; therefore, all interested sources shall ensure that they have fully identified, in writing, their capabilities to perform the requirements included in this SSN and subsequent updates. The Government encourages responses from traditional defense contractors, non-traditional defense contractors, construction technology companies, commercial innovators, and consortia, even if they have not previously performed work for the Department of Defense. To Revised Language: Description: The Army Contracting Command–Rock Island (ACC-RI), on behalf of the Project Lead Joint Services (PL JS) and the McAlester Army Ammunition Plant (MCAAP) Directorate of Public Works (DPW), is seeking capable sources for the design and construction of a modernized facility (Renovation and Modernization of Building 129, Lunch and Locker Room Facility) capable of supporting consolidated personnel operations at MCAAP while complying with strict Department of War physical security, environmental, and facility modernization standards. The United States Government (Government) intends to utilize the information submitted in response to this Sources Sought Notice (SSN) to issue a follow-on solicitation, request for solutions, request for quote that will encompass the full requirement for the modernized Building 129 facility. The Government is contemplating using a Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants, 10 U.S.C § 4022 Authority of the Department of Defense to carry out certain prototype projects, and Federal Acquisition Regulation (FAR) 12, Acquisition of Commercial Products and Services to satisfy this requirement. The Other Transaction authorities allow the Department of War to carry out repair and construction projects for facilities, prototype projects outside the traditional Federal Acquisition Regulation (FAR) framework. However, if the acquisition approach changes, the information obtained from this SSN will be utilized in the planning and award of the project. The U.S Government is seeking input from interested parties related to the strategy considerations. Please provide input under separate cover to the points of contact listed below. Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants Stand-Alone Other Transaction Agreement (OTA) 10 U.S.C. § 4022 Authority of the Department of Defense to carry out certain prototype projects Federal Acquisition Regulation (FAR) 12, Acquisition of Commercial Products and Services The Government's intent is to award the proposed transaction(s) based on the capabilities demonstrated in response to the follow-on RFS; therefore, all interested sources shall ensure that they have fully identified, in writing, their capabilities to perform the requirements included in this SSN and subsequent updates. The Government encourages responses from traditional defense contractors, non-traditional defense contractors, construction technology companies, commercial innovators, and consortia, even if they have not previously performed work for the Department of War. All terms and conditions remain unchanged. ****************************************************************************************************************************************************** DESCRIPTION: The Army Contracting Command-Rock Island (ACC-RI), on behalf of the McAlester Army Ammunition Plant (MCAAP) Directorate of Public Works (DPW), is seeking capable sources for the design and construction of a modernized facility (Renovation and Modernization of Building 129, Lunch and Locker Room Facility) capable of supporting consolidated personnel operations at MCAAP while complying with strict Department of Defense physical security, environmental, and facility modernization standards. The United States Government (Government) intends to utilize the information submitted in response to this Sources Sought Notice (SSN) to issue a follow-on Request for Solutions (RFS) that will encompass the full requirement for the modernized Building 129 facility. The Government is contemplating using a Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants) to satisfy this requirement. This authority allows the Department of Defense to carry out repair and construction projects for facilities outside the traditional Federal Acquisition Regulation (FAR) framework. However, if the acquisition approach changes, the information obtained from this SSN will be utilized in the planning and award of the project. The United States Governement's (Government) intends to award the proposed transaction(s) based on the capabilities demonstrated in response to the RFS; therefore, all interested sources shall ensure that they have fully identified, in writing, their capabilities to perform the requirements included in this SSN and subsequent updates. The Government encourages responses from traditional defense contractors, nontraditional defense contractors, construction technology companies, commercial innovators, and consortia, even if they have not previously performed work for the Department of Defense. ATTACHMENTS Additional information regarding SSN can be found in attachments
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Jessica Parr, jessica.m.parr2.civ@army.mil
- Christina Joniak, christina.l.joniak2.civ@army.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Army for the same kind of work (NAICS 236220, service code Z2JZ) in Oklahoma that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Repair Roofs at Fort Sill, Ok. Group 2 Roofs Include B0500, 1603, 1712 and 1718.Southwind Construction Services, LLC · W912BV24F0319 | $8,851,468 | Jan 11, 2027in 1 month | OK |
| Fort Sill Roof Repairs (B912, B1605, & B1606), Fort Sill, Oklahoma. Roofs Are Clay Tile With a Portion of B912 Being a Flat Roof.Trumble Construction LLC · W912BV24F0390 | $4,133,049 | Sep 19, 2026ended | OK |
| OK001, Joc Repair Hvac, Fire, LightingPatriot Strategies, LLC · W911SA26FA055 | $214,411 | Jan 30, 2027in 2 months | OK |
| Building 6050 Repair - Water and Parapet Damage at Fort Sill, Oklahoma.Tatitlek Universal Services Inc · W912BV25C0019 | $1,270,595 | Aug 26, 2026ended | OK |
| Please See Section As Follows: Section 00 00 00 Procurement and Contracting Requirementsgeneral Amplification of RequirementsFederal Constructors, Inc. · W50S8T25CA011 | $9,547,882 | Jun 1, 2027in 6 months | OK |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Similar open notices
Open now under NAICS 236220, commercial and institutional building construction, soonest deadline first.
- Department of the ArmyEmergency Operations Center Savannah River Site
- Department of Veterans Affairs642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC
- Department of Veterans AffairsPhysical therapy renovation at Richmond VA hospital
- Department of the ArmyF-15 Aerospace Ground Equipment (AGE) Facility, Vandenberg SFB
- Forest ServiceGMF Rochester Workshop Bathrooms
- Departmental OfficesKiosk restroom rebuild at Oregon Caves, Cave Junction, OR
- Department of the NavyBoat maintenance facility, Buliluyan, Palawan, Philippines
- Department of the ArmyGIS lab for Maun, Botswana
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy