- Opportunities
- National Aeronautics and Space Administration
- 80NSSC27948890Q
Mass production process development at NASA Ames, CA
NASA Ames Research Center wants a contractor to develop a repeatable, high-throughput mass production process, with the delivered parts serving as evidence that the process works.
Official title: Development of a mass production process
- Deadline
- Nov 27, 4:00 PM CT
- 2 days left
- Who can bid
- Small businesses
- Size standard for NAICS 541330: $25.5 million in average annual receipts; exceptions apply · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: NASA Shared Services Center
What they're buying
Data and components are wanted for integration by June 2027, but the contract period is not stated.
Top catches
“SAM will not allow me to attach the spt file here. It is available upon request.” Notice text
The statement of work file is a scanned image, and we could not review it. You must read it in full and ask for the spt file the notice says is available on request before you price.
“Quotes for the item(s) described in the RFQ are due by 11/23/2026 by 2:00 p.m. CT” SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 3
The RFQ still says quotes are due 11/23/2026 at 2:00 p.m. CT, which has passed. The notice text and SAM record give Friday, 11/27/2026 at 4:00 pm CT. Plan to the later time and confirm it in writing with the RFQ contact.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 2 of 3 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Develop a repeatable, high-throughput mass production process. The parts are evidence of that process, not a prototype run.
- Deliver design, tooling, a qualification lot and a scalability report, with pricing broken out by phase.
- Build the production press line and tooling. Subcontracting this to a domestic metal stamping or tool and die partner was answered as acceptable if contracting rules are met.
- Hold key characteristics: eight holes on center with the part diagonals, two per corner.
- Qualify the measurement system with a GR&R study (ANOVA, AIAG MSA). Total GR&R should not exceed 10% of tolerance, and up to 30% is possible with documented rationale.
- Price both tooling final destinations as options. Deliver data and components for integration by June 2027.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Statement of work not readable. The statement of work file is a scanned image, and we could not review it. You must read it in full and ask for the spt file the notice says is available on request before you price.
- Quote deadline date conflict. The RFQ still says quotes are due 11/23/2026 at 2:00 p.m. CT, which has passed. The notice text and SAM record give Friday, 11/27/2026 at 4:00 pm CT. Plan to the later time and confirm it in writing with the RFQ contact.
- Question cutoff unclear and may have passed. The notice says questions are due by day 3 of posting but gives no date. The RFQ gives 11/19/2026, which has passed. Send any questions in writing to Monica Wilson now and ask her to confirm the cutoff.“Questions must be sent no later than day 3 of the posting.” Notice text
- Small business set-aside and SAM registration. Only small businesses may bid, and you must be registered in SAM.gov to win. The size standard for NAICS 541330 is not stated, so check your own size status before you spend time on a quote.“Offeror’s shall be registered at www.sam.gov in order to be considered for award.” SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 3
- Lowest price among compliant quotes. Award goes to the lowest price among quotes that meet every requirement. A quote that does not show all requirements are met is removed, so a low price will not save a weak technical answer.“The Government will award a contract from this solicitation to the responsible Offeror whose offer conforming to the solicitation is the lowest price technically acceptable (LPTA) offer.” SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 11
- Pricing must follow phase format. Your quote must break out price by SOW phase and price both tooling final destinations as options. The contract price line is a blank placeholder, so ask how the total should be shown.“Quote format: Please break out pricing by Statement of Work phase” SATPC0043200 Tab 10 6 Questions.pdf, page 1
Key terms
| Who can bid | Small businesses registered in SAM.govSet aside for small business under NAICS 541330.SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 3 |
|---|---|
| How they choose | Lowest price technically acceptable (LPTA)A quote that does not show every requirement is met is removed.SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 11 |
| How to submit | Email to monica.d.wilson@nasa.govPut the RFQ notice ID in the email subject line.Notice text |
| Questions due | Day 3 of posting (no calendar date given)RFQ Section 2 gives 11/19/2026, 2:00 p.m. CT, which has already passed.Notice text |
| Contract type | Firm-fixed-price, amount left blankCommercial item order with FOB destination delivery.SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 7 |
How to respond
- Email your quote to monica.d.wilson@nasa.gov by Friday, 11/27/2026, 4:00 pm CT, as stated in the notice text.
- Put RFQ notice ID 62be765a534c4eff8f878018b9d3da5b in the email subject line.
- Include your CAGE/UEI code, FOB destination terms, delivery lead time, and two points of contact, each with name, phone and email. The notice text asks only for one name and email.
- Break out pricing by SOW phase and price both tooling destinations as options. The government will not pay by credit card. Quotes stay valid 30 days unless your quote says otherwise.
- Ask Monica Wilson for the spt file and the scanned SOW file you could not review before you finalize the price.
Attached files
From SAM.gov. Download links open the original files.
- SATPC0043200 Tab 10 1 SOW.pdf Scanned image, not read.
- SATPC0043200 Tab 10 6 Questions.pdfGovernment answers and added notes on delivery, schedule, quote format and tolerances. You must read it because it sets the pricing format and technical rules. Read.
- SATPC0043200 Tab 10 3 RFQ Open Market.pdfThe main request for quotation with instructions, clauses and evaluation rules. You must read it and follow its submission instructions; it has no form to fill in. Read.
Not stated in what we read
- Estimated value or total firm-fixed price: the amount is a blank placeholder.
- Contract period or end date: you are asked to propose it.
- Full statement of work content: the SOW file could not be read and the spt file is available only on request.
- Size standard for NAICS 541330.
- Exact calendar cutoff for questions (day 3 of posting).
Notice text
RFQ extended to Friday, 11/27/26, at 4:00 pm CT SAM will not allow me to attach the spt file here. It is available upon request. PLEASE INCLUDE THE FOLLOWING IN YOUR BID: • CAGE/UEI CODE • FOB DESTINATION • LEAD TIME FOR DELIVERY • POC NAME & EMAIL Questions must be sent no later than day 3 of the posting. ** SEE THE ATTACHMENTS ** We will not be paying with a credit card VENDORS MUST REFERENCE THE RFQ NOTICE ID NUMBER IN THE SUBJECT LINE OF YOUR EMAIL WHEN SUBMITTING A QUOTE
As published on SAM.gov.
Contacts
- Monica Wilson, monica.d.wilson@nasa.gov
- Will Garrett, will.c.garrett@nasa.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 27, 4:00 PM CT2 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 541330, engineering services, soonest deadline first.
- National Aeronautics and Space AdministrationUniversal Robotics UR10e arm, NASA Ames, Moffett Field, CA
- Department of the NavySteam turbine governor system replacement, Philadelphia, PA
- Department of the ArmyGovernor control programming at Libby Dam, MT (cancelled)
- Department of the NavyEnvironmental planning for ship homeporting, Norfolk, VA
- Department of the ArmyIntent to Sole Source - Type-C A&E Services for Construction of SFS Facility
- Department of the NavyNetwork lab operation and sustainment for Canadian FMS
- Department of Veterans AffairsLockout/tagout procedures at 3 New York VA hospitals
- National Aeronautics and Space AdministrationProgram Analysis and Control (PAAC V) Bridge
Free · at most one email a morning
Get new notices from National Aeronautics and Space Administration by email
Each morning we'll send the new solicitations and sources-sought notices from National Aeronautics and Space Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy