1. Opportunities
  2. Department of Defense
  3. Department of the Navy
  4. N0038327QNA16

Repair and testing of distributing system, Dayton, OH

The Navy wants a distributing system (NSN 6150-01-524-0925) repaired, tested and returned to Ready For Issue condition at a repair facility in Dayton, OH.

Official title: 61--DISTRIBUTING SYSTEM, IN REPAIR/MODIFICATION OF

Deadline
Dec 14, 3:30 PM ET
18 days left
Who can bid
Not stated
The notice names no set-aside
Last time
$448K
Likely Newvac, LLC
Place
Not stated
Buyer: NAVSUP Weapon Systems Support

What they're buying

The notice does not state the number of units, the contract period or the value.

Top catches

Your own tooling and test gear
“will not be provided by the Government and shall be the responsibility of the contractor” Notice text

The Government will not provide tooling, special test equipment or other manufacturing aids unless the notice expressly says so. Price in your own fixtures and test equipment, or ask which items are Government furnished.

Named repair source and site
“The contractor must perform all repairs/upgrades at the facility identified within this SOW.” Notice text

The notice names Projects Unlimited Inc at a fixed Dayton address and says all repairs must be done at the facility in the SOW. If that is not your facility, you probably cannot bid as written, so ask the contact before you price. Likely, not stated outright.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Repair, component replacement, reassembly and testing of the distributing system, NSN 6150-01-524-0925, part number 450-075-407-105, to Ready For Issue condition
  • Inspection and testing per the IETMS and available drawings, using the approved repair procedures
  • Supply all parts and material, which must be new under FAR 52.211-5, unless the notice names them as Government furnished
  • Provide the facility, labor, materials, and test and tooling equipment needed for the repairs
  • Maintain a quality system meeting ISO 9001 or SAE AS9100 and a calibration system
  • Keep items awaiting repair and repaired items in an enclosed warehouse; packaging per MIL-STD 2073

Who supplied it lately

$448K

on a recent contract for the same kind of product: Newvac, LLC. It ends Dec 15, 2026.

Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.

What to watch for

  • Your own tooling and test gear. The Government will not provide tooling, special test equipment or other manufacturing aids unless the notice expressly says so. Price in your own fixtures and test equipment, or ask which items are Government furnished.
  • Named repair source and site. The notice names Projects Unlimited Inc at a fixed Dayton address and says all repairs must be done at the facility in the SOW. If that is not your facility, you probably cannot bid as written, so ask the contact before you price.
  • Unpriced beyond-repair and extra-work units. Beyond-repair units and missing-part units are not in the contract price, and extra repair work may get an equitable adjustment. You need written DCMA concurrence and a go-ahead from the contracting officer before you start any of them.“Items determined BER are not included in the contract price.” Notice text
  • Referenced documents not attached. The notice relies on IETMS, drawings, a contract schedule and a CAV statement of work, but no files are attached. Ask the contact how to get them before you price the repair.“Refer to contract schedule for items to be repaired” Notice text
  • One-year warranty on repairs. The warranty runs one year after delivery, and a 45-day period runs from discovery of a defect. Include the cost of possible warranty repairs in your price.“1 YEAR AFTER DATE OF DELIVERY” Notice text
  • ISO 9001 or AS9100 required. The contract requires a quality system that conforms to ISO 9001 or SAE AS9100, plus a calibration system. Confirm you have both or can set them up before you bid.“ISO 9001/ SAE AS9100” Notice text

Key terms

Contract typeRepair, test and inspection under a statement of workItems are repaired to Ready For Issue condition, and you price the repair.Notice text

How to respond

  1. Read the notice and catches, then contact Marisa L. Tetkowski at +1 771-229-0588 or marisa.l.tetkowski.civ@us.navy.mil.
  2. Ask how to submit your offer, the required format and what to include. The notice does not say.
  3. Ask for the IETMS, drawings, contract schedule and CAV statement of work, which are not attached.
  4. Confirm whether you can repair at your own facility or must use the named repair source, and get any approval needed before you price.
  5. Submit before Monday, December 14, 2026, 16:30 (-04:00). Submission method: Not stated.

Not stated in what we read

  • Estimated value and number of units to repair.
  • Contract period and delivery schedule.
  • Who can bid, and whether the buy is set aside for small business.
  • How and where to submit the offer, and what forms are required.
  • Where to get the IETMS, drawings, contract schedule and CAV statement of work.
  • Whether the named repair source is required or you may propose your own facility.

Notice text

CONTACT INFORMATION|4|N731.39|M3H|+1 771-229-0588|marisa.l.tetkowski.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORTS (COMBO)|INSPECTION SITE SOURCE FINAL ACCEPTANCE SITE SOURCE|N/A|N00383|N/A|N/A|N/A|N/A||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 YEAR AFTER DATE OF DELIVERY|45 DAYS AFTER DISCOVERY OF DEFECT ||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| 1.

SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: DISTRIBUTING SYSTEM ;6150-01-524-0925; NSN , ;450-075-407-105; Part Number, Shall be performed IAW: DISTRIBUTING SYSTEM ;IETMS and available drawings.; Publication (s).

1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item.

It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract.

Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.

3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: DISTRIBUTING SYSTEM ;450-075-407-105; P/N, ;6150-01-524-0925; NSN, ;IETMS and available drawings; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).

3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.

3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.

3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval.

The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract.

Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.

The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs).

Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items.

Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.

3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item.

Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.

Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein.

Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract.

Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item.

If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change.

The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract.

3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications.

Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.

DISTRIBUTING SYSTEM ;PROJECTS UNLIMITED INC; Company Name , ;6300 sand lake rd DAYTON, OH 45414 2649; Address , ;04597; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality.

3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS.

3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6.

NOTES - NOT APPLICABLE

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who has supplied this lately

Contracts at Department of the Navy for the same kind of product (NAICS 335311, product code 6150) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.

ContractObligatedEndsState
Sepa Cable Assembly, UmbiNewvac, LLC · N0010423PXC07$447,840Dec 15, 2026within a monthCA
Cable Assembly, SpecL3 Technologies Inc · N0010425CNA08$819,750Oct 30, 2026endedMD
Cable Assembly, SpecL3 Technologies Inc · N0010425CNA09$1,664,300Jan 15, 2027in 1 monthMD
Vane Fan Motor AssyHansome Energy Systems Inc · N0010424CYB05$1,691,362Jan 21, 2027in 1 monthNJ
CBL Actr/Lock SigTeledyne Instruments Inc · N0010425PNB05$426,360Sep 1, 2026endedNH

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 17, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Navy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy