D2 dipole magnets for electron storage ring, Upton, NY
Brookhaven National Laboratory wants one first article and 194 production D2 dipole magnets for its Electron-Ion Collider, plus about 730 tons of laminated steel, with final testing and acceptance at Upton, NY.
Official title: Electron Storage Ring D2 Dipole Magnets
- Deadline
- Dec 22, 5:00 PM ET
- 26 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Upton, NY
- Buyer: Brookhaven Natl Lab -DOE Contractor
What they're buying
Contract length and value are not stated, and the closing date is now Tuesday, December 22, 2026, 5:00 P.M. EST.
Top catches
“extend the closing date on Request for Proposal No. 462499 from December 8, 2026 (5:00 P.M. EST) to December 22, 2026 (5:00 P.M. EST)” Notice text
The closing date moved from December 8 to Tuesday, December 22, 2026 at 5:00 P.M. EST. Use the new date, since older copies of the RFP show December 8.
“This Addendum is to communicate upcoming design changes coming, post step files” Notice text
The addendum says design changes are coming after the step files, but it does not describe them. Ask BSA in writing which drawings are final before you price the magnets.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 23 of 34 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- One first article magnet, built and tested by you, then accepted by BSA in writing before production starts.
- 194 production magnets: 32 in the base quantity and 162 as options.
- About 730 tons of laminated steel bought in one procurement, from one heat where possible.
- Detailed magnet design and analyses in native ANSYS format, plus preliminary, final and manufacturing readiness design reviews.
- Hollow OFHC copper coils, vacuum-impregnated with epoxy, with water fittings and thermal switches.
- Core painting, survey monuments, lifting provisions rated 3:1, and shipping in plywood cases.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline moved to December 22. The closing date moved from December 8 to Tuesday, December 22, 2026 at 5:00 P.M. EST. Use the new date, since older copies of the RFP show December 8.
- Design changes are still coming. The addendum says design changes are coming after the step files, but it does not describe them. Ask BSA in writing which drawings are final before you price the magnets.
- 730 tons of steel bought up front. You must buy about 730 tons of steel in one lot, but you may not order it until BSA accepts the first article in writing. Price the carrying cost and delay risk, and ask BSA whether it will approve long-lead orders early.“The vendor will purchase all steel for D2 magnets totaling 730 tons in one single procurement” Enclosure 1- Draft Contract No. 462499/Attachment A- Statement of Work for the ESR D2 Dipole Magnets.pdf, page 8
- Five STEP files not reviewed. We could not read the five STEP model files for 2104M0025, 2104M0052, 2104M0055 and the two 2104M0061 files. The STEP model defines the interfaces, so you must open these files on SAM.gov before you price.“D2 Magnet Assembly with Required Interfaces (STEP Model and” Enclosure 1- Draft Contract No. 462499/Attachment A- Statement of Work for the ESR D2 Dipole Magnets.pdf, page 7
- Prices firm 120 days, bands mismatch. The form asks for option unit prices for 2027 to 2032 and says the price stays firm for 120 days. Its quantity bands run to 200, but the option is 162 magnets, so ask which band applies.“This price shall remain firm for 120 days.” Enclosure 3- Proposal Pricing Sheet- AMS-Form-043.docx
- Confirm SAM status and size. By signing, you affirm that your SAM registration, representations, certifications and size status are current. We could not review Enclosure 2, Annual Representations, so read it and confirm your size before you sign.“We affirm we are registered in SAM and our representations and certifications as well as our small business size status (if applicable) are current and complete.” Enclosure 3- Proposal Pricing Sheet- AMS-Form-043.docx
Key terms
| Who can bid | Not statedThe set-aside is not stated on the SAM.gov record. Size standards are not in the text we could review.SAM.gov record |
|---|---|
| Contract type | Per-magnet unit prices, with steel priced per tonDelivery is FOB Destination. Payment is Net 30, or Net 10 for small businesses.Enclosure 3- Proposal Pricing Sheet- AMS-Form-043.docx |
How to respond
- Read Addendum No. 1, then ask BSA in writing which drawings and step files are final, since design changes are coming.
- Fill in the pricing sheet with the first article price, base price per magnet, option prices, steel total tons and price per ton, and unit prices for 2027 through 2032.
- Check the commercial item box and answer whether you can meet the delivery timeline. If you make magnets or steel outside the U.S., add the country of origin, HTS code and export control contact.
- Sign the concurrence and certification. The notice does not state how to submit. Confirm the method with cblanchar@bnl.gov, then send the signed form to P.O. Box 5000, Bldg. 1005S, Upton, NY 11973 by Tuesday, December 22, 2026, 5:00 P.M. EST.
Attached files
From SAM.gov. Download links open the original files.
- B1. Request for Proposal EIC ESR D2 Dipole Magnets 11.05.2026.pdf Not read: over our length limit.
- Enclosure 3- Proposal Pricing Sheet- AMS-Form-043.docxPricing form you must complete, check and sign with your prices, delivery answer and commercial status. Read in part.
- Enclosure 2- Annual Representations- AMS-FORM-050.pdf Not read: over our length limit.
- RFP 462499 APP 00539 Addendum No 1 11 19 2026.pdfAddendum No. 1 that extends the closing date and warns of upcoming design changes. Read only. Read in part.
30 more files from ZIP archives, 21 read
- Step Files/2104m0025_asm.stp Could not be read.
- Step Files/2104m0052_asm.stp Could not be read.
- Step Files/2104m0055_asm.stp Could not be read.
- Step Files/2104M0061_ASM_1-turn.stp Could not be read.
- Step Files/2104M0061_ASM_5-turn.stp Could not be read.
- Enclosure 1- Draft Contract No. 462499/Attachment A- Statement of Work for the ESR D2 Dipole Magnets.pdfDraft statement of work covering design, reviews, steel purchase, testing and quantities. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment B- Technical Specification for the ESR D2 Dipole Magnets.pdfMagnet technical specification covering core, coil, insulation, thermal switches and tests. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment C- Technical Specification for the EIC D1 D3 and D2 Dipole Magnet Steel, Doc. No. EIC-MSG-SPC-010.pdfSteel specification for the laminations, including sampling and test rules. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment D - BNL-QA-101.pdf Not read: over our length limit.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0025_drw.pdfReference drawing for the D2 magnet assembly with required interfaces. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0039_drw.pdfDrawing for the 12 turn top coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0041_drw.pdf Not read: over our length limit.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0047_drw.pdfDrawing for the 12 turn bottom coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0050_drw.pdfDrawing for the D2 trim coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0052_drw.pdfInterface drawing for the 13 turn magnet assembly. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0053_drw.pdfDrawing for the 13 turn bottom coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0054_drw.pdfDrawing for the 13 turn top coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0055_drw.pdfInterface drawing for the 11 turn magnet assembly. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0056_drw.pdfDrawing for the 11 turn top coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0057_drw.pdfDrawing for the 11 turn bottom coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0058_drw.pdfInterface drawing for the 11 to 2 turn magnet assembly. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0059_drw.pdfDrawing for the 11 to 2 turn top coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0060_drw.pdf Not read: over our length limit.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0061_drw.pdfInterface drawing for the 5 to 1 turn magnet assembly. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0062_drw.pdfDrawing for the 5 to 1 turn top coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0063_drw.pdfDrawing for the 5 to 1 turn bottom coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0084_drw.pdfInterface drawing for the 21 to 5 turn magnet assembly. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0085_drw.pdfDrawing for the 21 to 5 turn top coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Attachment E - Technical Drawings/2104m0086_drw.pdfDrawing for the 21 to 5 turn bottom coil. Read only. Read in part.
- Enclosure 1- Draft Contract No. 462499/Enclosure 1- Draft Contract No. 462499.docx Not read: over our length limit.
Not stated in what we read
- Estimated value or budget is not stated.
- Evaluation factors and award basis are in RFP B1, which we could not review. You must read it on SAM.gov.
- The submission method (email, portal or mail) is not stated.
- Contract length and the delivery schedule are in SOW section 6, which was cut from the text we received. You must read it.
- Questions deadline, site visit and pre-bid meeting details are not stated.
- We could not review Enclosure 2 (Annual Representations), BNL-QA-101 or the draft contract Word file. You must read them on SAM.gov.
Notice text
ADDENDUM NO. 1 to Request for Proposal No. 462499 for EIC ESR D2 Dipole Magnets (APP # 00539) This Addendum is to communicate upcoming design changes coming, post step files, and extend the closing date on Request for Proposal No. 462499 from December 8, 2026 (5:00 P.M. EST) to December 22, 2026 (5:00 P.M. EST). **All other terms shall remain unchanged** If you have any questions, please contact the Senior Contracts Specialist below: Cindy Blanchard Senior Contracts Specialist Procurement & Property Management Division Brookhaven National Laboratory Upton, New York 11973 Phone: (631) 344-5770 Email: cblanchar@bnl.gov
As published on SAM.gov.
Contacts
- Cindy Blanchard, cblanchar@bnl.gov, 6313445770
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 22, 5:00 PM ET26 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 332999, all other miscellaneous fabricated metal product manufacturing, soonest deadline first.
- Defense Logistics AgencyEngine electric starters for DLA depots
- Defense Logistics Agency14 ARM units for DLA depots, CONUS and OCONUS
- Defense Logistics AgencySplash guard rods for DLA depots, 135 each
- Defense Logistics AgencyFriction lining, 448 each, for W1A8 DLA Distribution
- Defense Logistics AgencyDirect shock absorbers, 96 each
- Defense Logistics AgencyBell cranks for DLA Distribution Depot Hill
- Defense Logistics Agency16 nonmetallic hoses for 148 FW LRS
- Defense Logistics Agency26 vehicle fender liners for DLA depots, US and overseas
Free · at most one email a morning
Get new notices from Department of Energy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy