- Opportunities
- Department of Agriculture
- Forest Service
- 12363N26R4016
Forest thinning, planting and roads, Salmon River, ID
A long-term stewardship contract to cut and haul timber, survey and rebuild forest roads, reduce fuels and plant trees on the Salmon River Ranger District of the Nez Perce-Clearwater National Forest, Idaho.
Official title: End of the World Long Term Stewardship
- Deadline
- Dec 11, 9:00 AM MT
- 15 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Grangeville, ID
- Buyer: USDA-FS, Stewardship Contracting Branch
What they're buying
The contract runs from 04/01/2027 to 10/30/2037, and optional Areas B to F start later.
Top catches
“Proposals are to be submitted via email to Bonnie Yoakum at bonnie.yoakum@usda.gov and Kasandra Meyer at kasandra.meyer@usda.gov.” Notice text
Proposals go by email only. Amendment 001 named Matt Daigle, and Amendment 002 replaced him with Kasandra Meyer, so use the Amendment 002 addresses and keep proof that your email was sent before 9:00 AM MST on 12/11/2026.
“Offerors are required to price Items 4–10 for Areas B–F with their offers (p.49).” C05c_SF-30_12363N26R4016_A002.pdf, page 3
Areas B to F are options, and you must price Items 4 to 10 for each now, though their quantities are unknown until the options are exercised. The question deadline has passed, so you will need to set your own pricing basis.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 8 of 82 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Cut, skid and deck timber on 1,913 acres in optional Area B: 1,725 acres by tractor and 188 acres by skyline or tether.
- Load, haul and maintain roads for about 105,195 tons of sawlog, 2,337 tons of nonsaw timber to a local facility, and 9,351 tons to a pulp facility in Area B.
- Road survey of 5 miles by vehicle and 5 miles on foot, road reconstruction, and 1 mile of new and 3 miles of existing temporary road in Area B.
- Fuels work in Area B: 1,725 acres of machine piling, 10,000 feet of manual fireline, and 191 acres of erosion control.
- Unit reconnaissance, layout, and marking and cruise over 1,913 acres in Area B.
- Precommercial thinning survey and hand tree planting under separate work statements; per-unit quantities are not in the text provided.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Email-only proposal delivery. Proposals go by email only. Amendment 001 named Matt Daigle, and Amendment 002 replaced him with Kasandra Meyer, so use the Amendment 002 addresses and keep proof that your email was sent before 9:00 AM MST on 12/11/2026.
- Areas B to F lack full quantities. Areas B to F are options, and you must price Items 4 to 10 for each now, though their quantities are unknown until the options are exercised. The question deadline has passed, so you will need to set your own pricing basis.
- Two wage determinations to price. Davis-Bacon rates apply to road reconstruction, and Service Contract Act rates apply to temporary roads and some maintenance. The two wage determination files are on SAM.gov but we could not review them, so you must read them before pricing labor.“Davis Bacon wages” C05c_SF-30_12363N26R4016_A002.pdf, page 7
- Certifications due with proposal. Exhibit 1 certifications must be sent with your proposal, not after award. Subcontractors in your workforce need their own signed certifications included in your response.“All certifications in exhibit 1 are required when proposals are submitted.” C05c_SF-30_12363N26R4016_A002.pdf, page 4
- Wage change claims within 30 days. A labor cost increase from a new wage determination can be claimed only by a written request within 30 days of receiving it. Overhead, profit and voluntary raises are excluded, so price the rest of the wage risk into your bid.“A contractor may apply FAR 52.222-43 by submitting a request to the Contracting Officer within 30 days of receiving a new wage determination” C05a_SF-30_12363N26R4016.pdf, page 11
- Slash throwback has no pay line. The bid schedule has no line for slash throwback. The Q&A says it is part of the cut, skid and deck lines, so price it there.“This is incidental to the Cut/Skid/Deck of included timber.” C05c_SF-30_12363N26R4016_A002.pdf, page 4
Key terms
| Who can bid | Open to all responsible sources; no set-asideNAICS 113310, small business size standard 500 employees.Notice text |
|---|---|
| Contract period | 04/01/2027 to 10/30/2037Optional Areas B to F start between 04/01/2028 and 04/01/2034.C05c_SF-30_12363N26R4016_A002.pdf, page 2 |
| How to submit | Email to Bonnie Yoakum and Kasandra MeyerAmendment 002 replaced the contact named in Amendment 001.Notice text |
| Questions due | 11/13/2026This date has passed.Notice text |
| Contract type | Long-term stewardship contract, request for proposalsCombined synopsis and solicitation for commercial items, in FAR Part 12 format.Notice text |
How to respond
- Email your proposal to Bonnie Yoakum at bonnie.yoakum@usda.gov and Kasandra Meyer at kasandra.meyer@usda.gov.
- Make sure it is received before 9:00 AM MST on Friday, 12/11/2026. The notice does not say how receipt time is recorded for email.
- Acknowledge receipt of Amendment 002 before the deadline by one of the three methods listed on the SF-30 form.
- Include the Exhibit 1 certifications with your proposal, plus signed certifications from any subcontractor in your workforce.
- Format, page limits and the list of required forms: Not stated.
Attached files
From SAM.gov. Download links open the original files.
- C04m_10 End of the World Marking Guide.pdf Not read: over our length limit.
- C04n_11 Least Cost Road Standards.pdf Not read: over our length limit.
- C05a_SF-30_12363N26R4016.pdfAmendment 001 form with the first set of questions and answers and the schedule of items; read it, but Amendment 002 replaces its contact list. Read.
- C04k_8 Layout Note Template.pdfBlank worksheet for logging method and layout notes; read it to see what layout data is expected. The text does not say it must be returned with the bid. Read.
- C04x_21 DBA WD ID20260080 Mod 1 Dated 05182026.pdf Not read: over our length limit.
- C04r_15 PCT Description of Work.pdfWork statement for precommercial thinning surveys, with plot rules and data format; read it to price survey work. Read.
- C04t_17 EOTW G-Z LTIRSC Lidar Volume Estimates.xlsx Not read: over our length limit.
- C05e_1b EOTW G-Z LTIRSC SOI_12363N26R4016_A002.xlsx Not read: over our length limit.
- C04s_16 Jungle Bird Mandatory Timber Cruise.pdf Not read: over our length limit.
- C04g_5b FSSS Jungle Bird.pdf Not read: over our length limit.
- C04l_9 Road Survey Description of Work.pdfWork statement for road surveys and road package preparation, with deliverables; read it to price road work. Read.
- C04q_14 Planting and Reforestation Description of Work.pdfWork statement for hand tree planting, including tree handling, spacing and quality rules; read it to price planting. Read.
- C04u_18 EOTW G-Z LTIRSC LiDAR Process.pdf Not read: over our length limit.
- C04o_12 FP-24 Specifications.pdfFederal construction specifications for roads and bridges; only pages 1 to 29 and 893 to 902 were provided, and the Q&A says surveys follow these specifications. Read the rest on SAM.gov. Read in part (pages 1–29 and 893–902 of 902).
- C05h_EOTW G-Z LTIRSC Appendix C_A002.pdf Not read: over our length limit.
- C04j_7 Project Design Elements.pdf Not read: over our length limit.
- C04f_5a_EOTW G-Z LTIRSC Appendix D-Jungle Bird Road Plans.pdf Not read: over our length limit.
- C04h_6a Jungle Bird Mandatory CAM.pdf Not read: over our length limit.
- C04w_20 SCA WD 1955-0228v68 Dated 08142026.pdf Not read: over our length limit.
- C05b_A001_Subcontracting Plan Template.docx Not read: over our length limit.
- C05g_3 EOTW G-Z LTIRSC Appendix B_A002.pdf Not read: over our length limit.
- C05c_SF-30_12363N26R4016_A002.pdfAmendment 002 form with the latest questions and answers, the current contact list, and the schedule of items; read it, since it overrides earlier answers. Read.
- C04i_6b_EOTW GZ LTIRSC Overview Map.pdf Not read: over our length limit.
- C05d_1a EOTW G-Z LTIRSC_12363N26R4016_A002.pdf Not read: over our length limit.
- C05f_2 EOTW G-Z LTIRSC Appendix A_A002.pdf Not read: over our length limit.
- C04p_13 PCT Survey Template.pdfBlank survey form for each precommercial thinning stand; read it to see the data the surveyor must record. Read.
56 more files from a ZIP archive
- EOTW_Plants.shx Could not be read.
- EOTW__Decision_HarvestUnits.CPG Could not be read.
- EOTW__Decision_HarvestUnits.dbf Could not be read.
- EOTW__Decision_HarvestUnits.prj Could not be read.
- EOTW__Decision_HarvestUnits.sbn Could not be read.
- EOTW__Decision_HarvestUnits.sbx Could not be read.
- EOTW__Decision_HarvestUnits.shp Could not be read.
- EOTW__Decision_HarvestUnits.shp.xml Could not be read.
- EOTW__Decision_HarvestUnits.shx Could not be read.
- EOTW_Avoidance.cpg Could not be read.
- EOTW_Avoidance.dbf Could not be read.
- EOTW_Avoidance.prj Could not be read.
- EOTW_Avoidance.sbn Could not be read.
- EOTW_Avoidance.sbx Could not be read.
- EOTW_Avoidance.shp Could not be read.
- EOTW_Avoidance.shp.xml Could not be read.
- EOTW_Avoidance.shx Could not be read.
- EOTW_ForestPlan_OG.cpg Could not be read.
- EOTW_ForestPlan_OG.dbf Could not be read.
- EOTW_ForestPlan_OG.prj Could not be read.
- EOTW_ForestPlan_OG.sbn Could not be read.
- EOTW_ForestPlan_OG.sbx Could not be read.
- EOTW_ForestPlan_OG.shp Could not be read.
- EOTW_ForestPlan_OG.shp.xml Could not be read.
- EOTW_ForestPlan_OG.shx Could not be read.
- EOTW_Goshawk_40acres_buffer.CPG Could not be read.
- EOTW_Goshawk_40acres_buffer.dbf Could not be read.
- EOTW_Goshawk_40acres_buffer.prj Could not be read.
- EOTW_Goshawk_40acres_buffer.sbn Could not be read.
- EOTW_Goshawk_40acres_buffer.sbx Could not be read.
- EOTW_Goshawk_40acres_buffer.shp Could not be read.
- EOTW_Goshawk_40acres_buffer.shp.xml Could not be read.
- EOTW_Goshawk_40acres_buffer.shx Could not be read.
- EOTW_Goshawk_PFA_420acres_buffer.CPG Could not be read.
- EOTW_Goshawk_PFA_420acres_buffer.dbf Could not be read.
- EOTW_Goshawk_PFA_420acres_buffer.prj Could not be read.
- EOTW_Goshawk_PFA_420acres_buffer.sbn Could not be read.
- EOTW_Goshawk_PFA_420acres_buffer.sbx Could not be read.
- EOTW_Goshawk_PFA_420acres_buffer.shp Could not be read.
- EOTW_Goshawk_PFA_420acres_buffer.shp.xml Could not be read.
- EOTW_Goshawk_PFA_420acres_buffer.shx Could not be read.
- EOTW_Past Timber Harvest.CPG Could not be read.
- EOTW_Past Timber Harvest.dbf Could not be read.
- EOTW_Past Timber Harvest.prj Could not be read.
- EOTW_Past Timber Harvest.sbn Could not be read.
- EOTW_Past Timber Harvest.sbx Could not be read.
- EOTW_Past Timber Harvest.shp Could not be read.
- EOTW_Past Timber Harvest.shp.xml Could not be read.
- EOTW_Past Timber Harvest.shx Could not be read.
- EOTW_Plants.cpg Could not be read.
- EOTW_Plants.dbf Could not be read.
- EOTW_Plants.prj Could not be read.
- EOTW_Plants.sbn Could not be read.
- EOTW_Plants.sbx Could not be read.
- EOTW_Plants.shp Could not be read.
- EOTW_Plants.shp.xml Could not be read.
Download the archive from SAM.gov.
Not stated in what we read
- Estimated contract value.
- How proposals are scored and how the award is made; the evaluation section is not in the text provided.
- Bid schedule lines for the base item 0001; the text provided starts at item 0002.
- Wage rates: we could not review the two wage determination files, so you must read them on SAM.gov.
- Final quantities for Areas B to F, which depend on the options and on appendices not yet issued.
- Mapped harvest units, avoidance areas and goshawk buffers: we could not review the GIS files, so you must read them on SAM.gov.
Notice text
Amendment 002: This amendment provides responses to questions received, corrections to several solicitation documents, and provides new contacts for the receipt of proposals. The response sue date and time are not extended. The following documents are amended and previous versions deleted: C05a_1a EOTW G-Z LTIRSC_12363N26R4016_A002 C05b_1b EOTW G-Z LTIRSC SOI_12363N26R4016_A002 C05c_2 EOTW G-Z LTIRSC Appendix A_A002 C05d_3 EOTW G-Z LTIRSC Appendix B_A002 C05e_4 EOTW G-Z LTIRSC Appendix C_A002 Proposals are to be submitted via email to Bonnie Yoakum at bonnie.yoakum@usda.gov and Kasandra Meyer at kasandra.meyer@usda.gov. Amendment 001: This amendment provides responses to questions received, updates the points of contact for proposal submission, extends the solicitation response due date and time to 9:00 AM MST on 12/11/2026 and sets a deadline of 11/13/2026 for additional questions.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Proposals are being requested and a separate written solicitation will not be issued. Solicitation number 12363N26R4016 is issued as a Request for Proposal (RFP) for the End of the World G-Z Long-Term IRSC (EOTW G-Z LTIRSC). The End of the World Project area is approximately 50,000 acres on the Salmon River Ranger District of the Nez Perce-Clearwater National Forest.
The End of the World EIS authorizes commercial treatment on over 17,000 acres primarily through intermediate harvest. The purpose of the EOTW G-Z LTIRSC is to thin overstocked stands to reduce the risk of catastrophic wildfire as well as improve stand health. The EOTW Project is within the Wildland Urban Interface and has numerous private inholdings with seasonal and permanent residents. This contracting tool will increase the pace and scale of active management beyond the current capacity of staffing levels.
A secondary objective of the EOTW G-Z LTIRSC is to provide a steady, dependable supply of timber and forest products to local facilities. This project aligns with Secretarial Memo 1078-006 and the Implementation of Secretarial Memo 1078-006 dated April 3, 2025 to utilize long term stewardship contracts for active management. This acquisition is not set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 113310 and the small business size standard is 500 Employees This acquisition is an unrestricted requirement.
All responsible sources may submit a proposal and offer which will be considered by the agency.
As published on SAM.gov.
Contacts
- Kasandra Meyer, Acquisition Program Support Officer, kasandra.meyer@usda.gov
- Bonnie Yoakum, Bonnie.Yoakum@usda.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 11, 9:00 AM MT15 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 113310, logging, soonest deadline first.
- Forest ServiceTimber market survey for Colorado National Forests, CO
- Department of the ArmyPine timber cutting and removal at Camp Navajo, AZ
- Department of the ArmyPonderosa pine timber sale, Camp Navajo, Arizona
- Forest ServiceHelicopter timber cutting near Bozeman, MT
- Department of the Air ForcePine timber sale on 264.5 acres, Eglin AFB, FL
- Department of the ArmyHardwood timber sale at Raystown Lake, Saxton, PA
- Forest ServiceR4014 Substantial Bundling D&F
Free · at most one email a morning
Get new notices from Forest Service by email
Each morning we'll send the new solicitations and sources-sought notices from Forest Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy