Power plant leases at nine Army bases in several states

The Army wants proposals for 25-year Enhanced Use Leases of Army land at nine installations, including Blue Grass Army Depot near Richmond, KY, to build commercial power generation, with an optional data center.

Official title: Enhanced Use Lease for Commercial Power Generation Facility

Deadline
Jan 18, 2027, 5:00 PM ET
53 days left
Who can bid
Not stated
The notice names no set-aside
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Richmond, KY
Buyer: W072 Endist Louisville

What they're buying

Each lessee must supply resilient backup power to the installation during grid outages, and rent must be at least fair market value set by a Army appraisal.

Top catches

Deadline may fall on a holiday
“must be received no later than 5:00 P.M. (EST), January 18, 2027” RFP No. DACA27-1-27-0015900.pdf, page 1

January 18, 2027 is a Monday and is likely Martin Luther King Jr. Day, a federal holiday. DA takes no responsibility for upload or transmission failures, so plan to upload well before 5:00 P.M. (EST). Likely, not stated outright.

Contingency power is a gate
“DA will not evaluate any Proposal(s) that does not include provision of contingency power in the event of a grid outage” RFP No. DACA27-1-27-0015900.pdf, page 35

A proposal without resilient power within 1 hour of a grid outage, for at least 14 continuous days, will not be evaluated. Design and price that power into your proposal from the start.

3 more catches below ↓

Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 12 of 15 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Design, finance, permit, build and operate a commercial power plant on leased Army land. Technologies may include gas turbines, engines, fuel cells, small modular reactors, battery storage, or solar with storage.
  • Provide resilient power to the installation within 1 hour of any grid outage, for at least 14 continuous days, as in-kind rent.
  • Pay for any utility or infrastructure upgrades needed for the installation to accept that power.
  • Optional data center under Profile 1 or Profile 2 standards. Data-center-only proposals will not be considered.
  • Fund NEPA review, the Environmental Condition of Property report, permits, the perimeter fence and gate, access roads and parking.
  • Submit a decommissioning plan and post a bond or letter of credit before land disturbance, remove structures to 4 feet below grade, and restore the land.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline may fall on a holiday. January 18, 2027 is a Monday and is likely Martin Luther King Jr. Day, a federal holiday. DA takes no responsibility for upload or transmission failures, so plan to upload well before 5:00 P.M. (EST).
  • Contingency power is a gate. A proposal without resilient power within 1 hour of a grid outage, for at least 14 continuous days, will not be evaluated. Design and price that power into your proposal from the start.
  • Pages over limit are destroyed. Table 1 sets page limits of 5, 10, 5, 10 and 5 pages by section, and pages over a limit are destroyed unread. Supporting maps and cost estimates have a separate 10-page cap, and the whole proposal must be one PDF.“Any pages exceeding the page limits for each Section of the Proposal in Table 1 above will be destroyed and not evaluated.” RFP No. DACA27-1-27-0015900.pdf, page 26
  • Tour RSVPs close today. RSVPs for the Fort Bragg, Blue Grass, Pine Bluff and Fort Rucker tours are due today, November 25, 2026. Virtual attendance is not allowed, and each company may be limited to four people.“(RSVP by November 25)” RFP No. DACA27-1-27-0015900.pdf, page 24
  • Water source rule conflicts. The RFP bars draws on water aquifers, yet it lists brackish groundwater as an allowed process water source. Ask DA in writing which source it accepts before you design the water plan.“Projects must avoid draws on water aquifers” RFP No. DACA27-1-27-0015900.pdf, page 7

Key terms

Who can bidU.S.-organized entities with majority domestic ownership and a U.S. place of businessPrivate, public and not-for-profit entities may apply. DA will review every offeror for undue foreign influence.RFP No. DACA27-1-27-0015900.pdf, page 21
Contract period25-year initial lease termA renewal option is possible only if you propose one and DA agrees.RFP No. DACA27-1-27-0015900.pdf, page 8
How they chooseBest overall value, judged on five equally weighted factorsDA may select a proposal that does not offer the highest consideration.RFP No. DACA27-1-27-0015900.pdf, page 33
How to submitOne single PDF uploaded to the Smartsheet form linkDo not send appendices or other files separately. The link is in section 4 of the RFP.RFP No. DACA27-1-27-0015900.pdf, page 23
Questions dueWednesday, January 6, 2027, 5:00 P.M. (EST)Send questions by email to DLL-usarmy.rfp.question@usace.army.mil.RFP No. DACA27-1-27-0015900.pdf, page 1
Contract typeEnhanced Use Lease, a long-term land leaseGranted under 10 U.S.C. 2667. The Federal Acquisition Regulation does not apply.RFP No. DACA27-1-27-0015900.pdf, page 20
Site visitOptional tours November 30 to December 17, 2026; RSVP date varies by tourRSVPs for the first four tours are due today, November 25. Virtual attendance is not allowed.RFP No. DACA27-1-27-0015900.pdf, page 24

How to respond

  1. Today, November 25, 2026, email DLL-usarmy.rfp.question@usace.army.mil with attendee names, organization, contact details and installations if you want to tour Fort Bragg, Blue Grass, Pine Bluff or Fort Rucker. RSVPs for later tours are due December 2 or December 9, 2026.
  2. Send any questions to DLL-usarmy.rfp.question@usace.army.mil by 5:00 P.M. (EST) on Wednesday, January 6, 2027. Use the subject line in section 9.1, which reads DACA27-1-27-27-0015900 and does not match the solicitation number, so confirm the wording in your question.
  3. Build one PDF with a title page showing your name, complete address, and the contact person's name, phone and email. Keep each section within the Table 1 page limits, keep supporting data to 10 pages, and mark confidential data with the required legend.
  4. Upload the single PDF at https://app.smartsheetgov.com/b/form/5f94d65191464a37b69c4a7559bcdb48 by 5:00 P.M. (EST) on Monday, January 18, 2027, and enter an email as your point of contact.
  5. If you are selected, you must sign a Term Sheet with a Milestone Timetable within 90 days of the Selection Notice, or the selection can be terminated.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • The fair market rent amount, which DA will set by an appraisal that has not been done yet.
  • The terms of the sample lease (Attachment C) and the NEPA procedures (Attachment M), which were not provided to me, and the SAM.gov file linked as a resource, which could not be read.
  • The terms in pages 8 to 27 of the Term Sheet, which were not provided.
  • Whether the Fort McCoy, Fort Hood and JBLM attachments are the revised versions Amendment No. 1 required, since the amendment does not say what changed. The Fort McCoy map caption also reads Pine Bluff Arsenal.
  • Whether any buyer, price or demand exists for the power or data center capacity. DA says the selected offeror must find buyers.
  • The cost of police, fire and EMS services on the lease site, which DA says will be set in separate agreements not yet made.

Notice text

The Department of the Army (“DA”) is issuing this Request for Proposals (“RFP” or “Solicitation”) to solicit competitive proposals from private, public and/or not-for-profit entities interested in leasing non-excess DA land (“Properties”) for development of commercial power generation facilities and data centers under a long-term lease agreement(s) (“Enhanced Use Lease” or “EUL”) at Blue Grass Army Depot, Pine Bluff Arsenal, Tooele Army Depot, Sierra Army Depot, Fort McCoy, Fort Bragg, Fort Hood, Fort Rucker, and Joint Base Lewis-McChord (“Installations”).

The EUL(s) that would result from this RFP would be for the purpose of the selected Offeror(s) designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, securing, and decommissioning a commercial power generation facility and a data center (“Project”). DA’s preference is for integrated power generation facility and commercial data center Projects, but an Offeror can elect to propose power generation only.

DA may elect to award one or more EULs pursuant to this RFP. Prior to expiration of the EUL(s), Lessee(s) will be required to restore the Property to the condition it was in prior to execution of the EUL(s).Offerors may submit proposals for a power generation facility only, or for a power generation facility and a data center as further described below. Proposals for a data center-only will not be considered. (1)Power Generation Facility without a Data Center Project.

Offerors may submitproposals that do not include a Data Center. The proposals should includecombinations of power generation, energy storage systems, and microgrids to servepower markets. Projects will require the provision of resilient energy capabilities to DAas part of the consideration to be paid to DA. The Project may include a singletechnology or a hybrid generation portfolio, including but not limited to: •Advanced low-emission natural gas turbines •High-efficiency reciprocating internal combustion engines (RICE) •Stationary fuel cells and hydrogen generation/combustion systems •Small Modular Reactors (SMRs) •Advanced nuclear systems •Utility-scale Battery Energy Storage Systems (BESS) •Dispatchable generation combined with utility-scale solar photovoltaic (PV)arrays and energy storage (2)Power Generation Facility and Data Center Project.

Offerors may submit proposalsfor both power generation and a data center. Proposals are not restricted to anyparticular data center size or capacity. However, DA’s preference is for the followingdata center frameworks in order of preference: Profile 1: Hardened, physically isolated campuses built to ICD 705 standards for Top Secret/IL6 workloads. Profile 2: Large-scale hyperscale and AI/HPC facilities targeting PUE ? 1.15. Offerors electing to integrate commercial data centers alongside generation assets may do so within a unified campus master plan.

Proposed Projects must provide energy resilience capabilities to the DA that will bepart of the lease consideration to be provided to DA by the Lessee. These capabilitiesmust include the provision of resilient power within one (1) hour of a grid outage and fora minimum of fourteen (14) continuous days, and providing any required improvementsto DA’s utility infrastructure that may be required to enable the Installation to acceptdelivery of the resilient power.

For purposes of this RFP, a grid outage is defined asany loss of power from the grid serving the Installation. Preference will be given toOfferors whose Proposal is for the provision of contingency power in excess offourteen (14) continuous days. DA expects that all power generated and data center capacity (where applicable) willbe sold to third-party off-taker(s). The selected Offeror will be responsible for identifyingand securing off-taker(s).

The Installations included in this solicitation are located in both competitive andvertically integrated utility markets. All Projects must comply with the utility regulations,such as retail sale of electricity and interconnection requirements, that are applicable tothe service territory. Projects must avoid draws on water aquifers and must prioritize industrial greywater,treated municipal effluent, or closed-loop cooling towers. Water usage must be net-neutral or better.

Offeror shall, at its sole expense, source all industrial process waterfrom non-potable alternative sources, which may include brackish groundwater,reclaimed municipal wastewater (graywater), or treated industrial/agricultural runoff,subject to DA approval and regulatory compliance. Pursuant to its leasing authority codified at 10 U.S.C. § 2667 and provided asAttachment A, DA intends to execute an EUL(s) with a selected Offeror(s) (“Lessee”) foran initial term of twenty-five (25) years.

DA may consider including one or more optionsto renew the EUL for an additional period of time following expiration of the initial term ifproposed by the Offeror in its Proposal and as further described in Section 6.1.a.Consideration to be provided by the Lessee for the EUL will be in-kind, cash, or acombination thereof in an amount not less than the fair market value of the leaseinterest as determined by an appraisal to be completed by DA. The Lessee(s) under the EUL(s) will, among other things and subject to the termsand conditions of the EUL, be authorized and responsible for financing, designing,developing, operating, and maintaining the Project and shall be responsible forcomplying with all applicable Federal, state and local laws, codes, ordinances andregulations, including building codes, as they may be amended from time to time.

TheProject(s) shall be viable without any commitment or contribution, monetary orotherwise, from DA. DA envisions that development of the Project(s) will utilize theProperties in a manner that will not conflict with adjacent Installation ongoing mission-related activities or the surrounding community. Offerors may propose a Project(s) on all or a portion of the Properties at any one or more of the Installations. DA may also elect to select more than one Offeror for awardand may consider multiple Projects at the same Installation if more than one Project canbe accommodated without conflict.

Offerors may submit proposals to develop a singletract or multiple tracts. Proposals must clearly identify the portion(s) and associatedacreage(s) of the Properties proposed for lease by the Offeror. By submitting a proposal, each Offeror acknowledges terms and conditions set forth inthis RFP and its Attachments, including but not limited to, the Term Sheet and the EUL,samples of which are provided as Attachments B and C. Offerors are advised thatsubstantive lease terms and clauses are not subject to further negotiation.

This RFP may be amended or supplemented and all such amendments andsupplements shall be considered part of this RFP (and references to the RFP shallinclude all amendments and supplements, unless otherwise specified). To receive anyamendments or supplements to this RFP, Offerors will be required to refer to the RFPposting on sam.gov. DA reserves the right, at any time, without notice, at its sole and absolute discretion,to (a) modify, update, supplement, revise, suspend, or waive any terms and conditionsof this RFP; (b) independently waive any deficiency or irregularity in any proposalsubmitted where it is in the Government’s best interest to do so; (c) reject any or allproposals at any time prior to award; (d) extend any deadline set forth in this RFP; (e) cancel the RFP process, in whole or in part; (f) make an award or awards as a result of initial proposals submitted; (g) discuss any submission with the Offeror that submitted it and require the submission of additional information regarding any aspect of the Offeror’s proposal; (h) make award to an Offeror who submits a proposal that is not the proposal that would provide DA with the highest value in terms of consideration to be paid under the EUL; (i) make an award to more than one Offeror if the Properties proposed for lease by said Offerors do not conflict; and (j) initiate further discussions or negotiations directly with the Offeror(s) (after DA selects it for award), if DA believes that the amount of consideration offered for the EUL in the Offeror’s proposal warrants further refinement or enhancement.

DA’s objective for this RFP and the Project(s) is to maximize the financial return to DAthrough the lease of non-excess available land on the Installations. In leasing theProperties, DA will capitalize their value.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 25, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy