1. Opportunities
  2. Department of Defense
  3. Department of the Air Force
  4. FA860127Q0018

Facility signage replacement, Wright-Patterson AFB, OH

You would remove existing signs and furnish and install 120 new signs, mainly 2/90 modular signs or an approved equal, in Building 11 at Wright-Patterson Air Force Base, Ohio.

Official title: Facility 30011 - Facility Signage Update

Deadline
Dec 4, 4:00 PM ET
8 days left
Who can bid
Small businesses
Size standard for NAICS 339950: 500 employees · Who qualifies
Last time
$164K
Likely Standard Signs, Incorporated
Place
Wright Patterson AFB, OH
Buyer: FA8601 AFLCMC Pzio

What they're buying

The work must be completed within 120 days of award.

Top catches

Cover page shows an old due date
“25 Nov 2026” Solicitation FA8601Q0018.pdf, page 1

The cover page still lists 25 Nov 2026 at 04:00 PM, which is today. Amendments changed it to 4 December at 4:00 PM EST, so plan for that date and confirm it in writing with the contracting officer.

Any exception can fail you
“Quotations that take exception to material solicitation requirements, fail to provide required information, or do not demonstrate compliance with the technical requirements may be determined technically unacceptable.” Notice text

Technical review is pass or fail, so a lower price cannot save a quote that misses a requirement. Take no exceptions and send every required item.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 5 of 7 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove existing signs one for one and patch and paint walls where needed to match the existing finish.
  • Furnish and install 120 signs in 11 sign types, for example 44 room ID signs (CLIN 0001) and one directory (CLIN 0008).
  • Provide design services, space planning, site verification, and 3D renderings of each typical, plus AutoCAD design hours if you include them.
  • Meet ADA and ABAAS requirements: tactile characters raised .8mm, Grade 2 Braille, color contrast, and mounting heights per ICC/ANSI A117.1.
  • Provide a warranty of at least 2 years on standard products and 1 year on custom signs, for materials and workmanship.
  • Deliver, store for up to 30 days, install, and close all punch list items before payment.

Who supplied it lately

$164K

on a recent contract for the same kind of product: Standard Signs, Incorporated. It ended Oct 15, 2026.

Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.

What to watch for

  • Cover page shows an old due date. The cover page still lists 25 Nov 2026 at 04:00 PM, which is today. Amendments changed it to 4 December at 4:00 PM EST, so plan for that date and confirm it in writing with the contracting officer.
  • Any exception can fail you. Technical review is pass or fail, so a lower price cannot save a quote that misses a requirement. Take no exceptions and send every required item.
  • CMMC timing conflicts. The clause asks for your CMMC UID in the proposal, but the Q&A says Level 1 only has to be complete before award. Enter your self-assessment in SPRS before you send the quote, and ask the contracting officer which rule applies.“The Offeror shall provide, in the proposal, the CMMC” Solicitation FA8601Q0018.pdf, page 28
  • Finish files not reviewed. The finishes list and cutsheets are part of the pass or fail review, and two attachments on SAM.gov could not be reviewed here. Download and read every file before you price, and do not rely on this summary for finish or color details.“compliance with all material solicitation requirements, including the Statement of Work (SOW), CLIN/Pricing Schedule, and Project Finishes List/Cutsheets” Notice text
  • Layout and price changes after award. The signage plan comes after award, but you must price now. Any deviation that raises the price has to be documented in writing and sent to the contracting officer, so write down your price assumptions.“any deviation that causes an increase in the price submitted during the bid process must be documented in writing” SOW - F30011 Facility Signage Update -rv1 .pdf, page 6
  • 3D renderings due with quote. The colored 3D renderings and price breakdown must come with your quote. The notice's list of quote items does not name renderings, so schedule design work before the due date.“Yes, the renderings and price breakdown due with the quote.” Quest_Answ.pdf, page 4

Key terms

Who can bidSmall businesses only, NAICS 339950, 500 employeesThe prime offeror must qualify as small under NAICS 339950 (Q&A 12).SAM.gov record
Contract periodComplete within 120 days of contract awardThe 120 days include the post-award site visit, finish selection, product lead time and installation.SOW - F30011 Facility Signage Update -rv1 .pdf
How they chooseLowest price among technically acceptable quotesTechnical acceptability is pass or fail. Price is not traded off against technical merit.Notice text
How to submitEmail to the contract specialist and contracting officerSend one email with the required subject line and total size under 5 MB.Notice text
Contract typeFirm-fixed-price purchase orderOne award to one quoter. The CLIN sheet lists no option items.Notice text
Site visitAfter awardThe SOW had said a visit could be scheduled within one week of posting. The Q&A changed this.Quest_Answ.pdf, page 3

How to respond

  1. Email the quote to christopher.hall.113@us.af.mil and jessica.stamper.2@us.af.mil so that it is received by Friday, 4 December 2026 at 4:00 PM EST.
  2. Use the subject line FA860127Q0018, Facility 30011 – Facility Signage Update. Without it, the base email filter may block your quote.
  3. Send one email under 5 MB with no zip or compressed files. Attach only .pdf, .doc, .docx, .xls or .xlsx files.
  4. Include pricing for all 13 CLINs in whole dollars, the completed Required Information Sheet with your CMMC UID, cutsheets for each sign type, 3D renderings, your warranty statement, and a completion date within 120 days of award.
  5. If you need a DoDSafe drop off, tell the contract specialist or contracting officer at least 48 hours before the due date.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated value or budget for the purchase.
  • When questions close. The notice does not state a questions deadline.
  • What the two attachments on SAM.gov that could not be reviewed contain, likely the finishes list or cutsheets.
  • Whether CAD files will be provided. The SOW limits them to NIST SP800-171 Level 1 until 9-NOV-2026, which has passed, and Q&A 8 says Level 2 is not required. Ask the contracting officer.
  • The revised size for CLIN 0011 notice holders. The Q&A changed it in an image that could not be read.
  • Lead time for each sign type, which determines whether the 120-day completion date is achievable.

Notice text

24 November 2026 Updated q/a document (end) 23 November 2026 Attached updated CLIN sheet to reflect design services and removal, delivery, and installation. (end) 17 November 2026 See updated questions and answers Attached a solicitation amendment document reflecting the new due date of 4 December 2026 at 4:00 PM EST (end) 12 November 2026 Updated response due date to 4 December 2026 at 4:00 PM EST See updated questions and answers (end) 5 November 2026: See attached questions and answers (end) Combined Synopsis/Solicitation AFLCMC/PZI Installation Contracting Support Wright Patterson AFB, OH 45323 Date: 2 November 2026 Title: Facility 30011 - Facility Signage Update Request for Quote (RFQ) / Solicitation Number: FA860127Q0018 Quotes Due: 4 December 2026 at 4:00 PM EST Contact Point(s): Chris Hall, Contract Specialist; christopher.hall.113@us.af.mil Contact Point(s): Jessica Stamper, Contracting Officer; jessica.stamper.2@us.af.mil Description: This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with RFO Part 12.

This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number [FA860127Q0018] is issued as a [request for quote (RFQ)] for [Facility 30011 – Facility Signage Update]. This acquisition [is] set-aside for small business concerns under NAICS code [339950] with a small business size of [500employees]. This solicitation incorporates provisions and clauses by reference.

The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The Government reserves the right to conduct interchanges with some, none, or all offerors, or make no award at all. The Government will make award in accordance with the evaluation criteria stated in Section 1, Evaluation Criteria and Basis for Award. The Government also reserves the right to cancel this solicitation, either before or after the closing date.

1. Evaluation Criteria and Basis for Award: The Government intends to award one firm-fixed-price purchase order to the responsible quoter whose quotation is determined to be technically acceptable and offers the lowest evaluated total price. Award will be made on a lowest-price technically acceptable (LPTA) basis. Technical acceptability and price are evaluated on a pass/fail basis; no tradeoff will be made between technical merit and price. Technical Acceptability A quotation will be determined technically acceptable when it demonstrates compliance with all material solicitation requirements, including the Statement of Work (SOW), CLIN/Pricing Schedule, and Project Finishes List/Cutsheets.

At a minimum, the quoter shall submit: A completed pricing schedule with unit and extended prices for all CLINs; A completed Required Information Sheet; The proposed manufacturer and part number for each sign type; Product literature and cutsheets sufficient to demonstrate compliance with the required sign dimensions, materials, finishes, colors, tactile characters, Braille, insert features, mounting method, and other requirements identified in the SOW and Project Finishes List; For any proposed “or equal” product, documentation demonstrating that the product meets or exceeds all stated salient characteristics and technical requirements; A statement confirming that quoted prices include all supervision, labor, materials, equipment, field verification, fabrication, delivery, removal and disposal of existing signs, patching, painting, mounting hardware, installation, cleanup, warranty, and all other work required by the solicitation; A proposed completion date not later than 120 calendar days after contract award; and A warranty statement consistent with the solicitation requirements.

Quotations that take exception to material solicitation requirements, fail to provide required information, or do not demonstrate compliance with the technical requirements may be determined technically unacceptable. Price Evaluation The Government will evaluate the total price by adding the extended prices for all CLINs. Quotations shall include pricing for every CLIN. The Government will evaluate prices for completeness, mathematical accuracy, and reasonableness.

The Government may evaluate quotations in order of lowest total evaluated price. If the lowest-priced quotation is determined technically acceptable and the price is determined fair and reasonable, no further quotations may be evaluated. Basis for Award Award will be made to the responsible quoter submitting the lowest-priced quotation that is determined technically acceptable and fair and reasonable. The Government reserves the right to conduct interchanges with some, none, or all offerors, or make no award at all. 2.

Requirement: This requirement is for Facility Signage Update in accordance with the Statement of Work (SOW), See attached 3. Delivery: Supplies: The delivery is required within [120 days] after receipt of order (ARO) to Wright Patterson AFB, Ohio. 4. Provisions and Clauses: See solicitation attachment for applicable provisions and clauses that apply to this acquisition. NOTE 1: In accordance with R-DFARS 252.204-7998, Alternate A, Annual Representations and Certifications (Deviation 2026-O0043) (FEB 2026), the offeror's quote submission legally binds and certifies that its SAM registration is current, complete, accurate, and has been updated within the preceding 12 months as of the offer's date.

NOTE 2: In accordance with R-DFARS 252.204-7021 and R-DFARS 252.204-7025, a CMMC Level 1 assessment is the mandatory minimum requirement for all offerors bidding with the Department of War. Under CMMC Level 1, all offerors must demonstrate full compliance by self-certifying with the 15 basic safeguarding requirements for Federal Contract Information (FCI) outlined in RFO 52.240-93(b)(1). Once your organization has confirmed its compliance with these 15 requirements, you must enter this self-certification into the Supplier Performance Risk System (SPRS) module within PIEE (https://piee.eb.mil).

Contract award cannot be made to any offeror that is not fully compliant and whose assessment results are not properly recorded in the system of record. You must verify the CMMC Level required for this award by checking the provisions and clauses within the solicitation. 5. Quotes Due Date: Quotes must be submitted electronically to the Contract Specialist via e-mail at christopher.hall.113@us.af.mil and Contracting Officer at jessica.stamper.2@us.af.mil. Quotes must conform to the requirements of this solicitation and be received no later than 4 December 2026 at 4:00 pm EST. It is the responsibility of the offeror to ensure that the quote and its attachments are received.

Any correspondence sent via e-mail must contain the subject line “FA860127Q0018, Facility 30011 – Facility Signage Update” The entire quotation must be contained in a single e-mail that does not exceed 5 megabytes including attachments, if any. E-mails with compressed files are not permitted. Note that e-mail filters at Wright-Patterson Air Force Base are designed to filter e-mails without subject lines or with suspicious subject lines or contents (i.e., .exe or .zip files).

Therefore, if the specified subject line is not included, the e-mail may not get through the e-mail filters. Also be advised that .zip or .exe files are not allowable attachments and may be deleted by the email filters at Wright-Patterson. If sending attachments with email, ensure only .pdf, .doc, .docx, .xls or .xlsx documents are sent. The email filter may delete any other form of attachments. If a DoDSafe drop off is needed, please notify the contract specialist or contracting officer at least 48 hours before quotes are due. Any quotes received after designated closing date and time need not be considered.

Quotes must include aggregate total of base plus all option year CLINS, if requested (IAW RFO 52.217-5 Evaluation of Options). All quotes shall be in whole dollars and conform to the Contract Line-Item Number (CLIN) structure of attached solicitation. 6. Notice to Vendor(s): All vendors must fully complete and return the 'Required Information Sheet' (attached to the solicitation) and return with their quotation. Additionally, quotations that contain pricing only with no description/detail of the supply/service that will be provided will not be accepted or considered for award.

7. Tariffs: In accordance with R-DFARS 252.225-7013, the contractor is prohibited from including any amount for customs duties on eligible items within the quote price. The claim for duty-free entry is restricted to supplies destined for government use, either as end items or as components thereof. The Government will provide assistance in the process of obtaining duty-free entry. 8. Period of Acceptance of Quotes: Offeror agrees to hold prices in its quote firm for 60 calendar days from the date specified for receipt of offers.

9. SAM Registration: Offerors shall be registered in the System for Award Management (SAM) at the time of quotation submission and at the time of award. By submitting a quotation, the offeror represents that its SAM registration is active, current, complete, and accurate, including its legal business name, Unique Entity Identifier (UEI), Commercial and Government Entity (CAGE) code, and Electronic Funds Transfer (EFT) information, as applicable. The offeror shall maintain an active, current, complete, and accurate SAM registration throughout contract performance and through final payment.

Failure to maintain the required SAM registration may render a quotation ineligible for award. Failure to maintain an active, current, complete, and accurate SAM registration may result in the quotation being determined ineligible for award, regardless of whether the quotation is otherwise complete, timely submitted, or technically acceptable. Information to register on SAM can be found at the web site, SAM.gov. List of Attachments: Solicitation Statement of Work Clin Structure Project Finishes List Required Info Sheet

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who has supplied this lately

Contracts at Department of the Air Force for the same kind of product (NAICS 339950, product code 9905) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 25, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Air Force by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy