Pole barn roof replacement, Big Pine Key, FL
The U.S. Fish and Wildlife Service wants a small business to remove and replace the metal roof on a pole barn about 30 by 110 feet at Big Pine Key, Florida, and to repair rafters, purlins, and fascia as needed.
Official title: FL-GREAT WHITE HERON NWR POLE BARN ROOF REPLACEMEN
- Deadline
- Dec 23, 1:00 PM ET
- 27 days left
- Who can bid
- Small businesses
- Size standard for NAICS 238160: $19 million in average annual receipts · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: FWS Contracting Activity
What they're buying
Work runs 150 calendar days after notice to proceed and is priced as a lump sum.
Top catches
“The quotation MUST be electronically submitted via e-mail to adam_graham@ios.doi.gov by the due date and time listed on the System for Award Management synopsis for consideration.” Sol_140FF027Q0078.pdf, page 40
Section L says to email the quote to adam_graham@ios.doi.gov. Item 8 lists a Falls Church, Virginia address for offers. Ask the contract specialist which method is accepted, and get written confirmation that your emailed quote was received before the deadline.
“The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.” Sol_140FF027Q0078.pdf, page 31
This clause allows only domestic construction materials, and the exceptions list says none. Check where the aluminum panels, fasteners, flashing, and sealants are made before you price the job.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 3 of 4 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Remove the existing metal roofing and dispose of it lawfully, including flashing, trim, and fasteners.
- Repair, reinforce, or replace deteriorated rafters, purlins, and fascia found during the work, as part of the base price.
- Install a complete aluminum 5V crimp metal roof in single 30-foot panels, at least 20-gauge (.032 inch), with drip edge and all flashing and trim.
- Obtain permits, pass inspections, and submit product data, shop drawings, color selections, a quality control plan, and a submittal register.
- Provide a 5-year manufacturer warranty issued to the Government and a 2-year contractor installation warranty.
- Clean the site, remove all debris, and run a magnetic sweep for loose screws and nails. Deliver closeout documents, certified payrolls, and a release of claims.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Email or mail? Submission method conflicts. Section L says to email the quote to adam_graham@ios.doi.gov. Item 8 lists a Falls Church, Virginia address for offers. Ask the contract specialist which method is accepted, and get written confirmation that your emailed quote was received before the deadline.
- Buy American rules cover materials. This clause allows only domestic construction materials, and the exceptions list says none. Check where the aluminum panels, fasteners, flashing, and sealants are made before you price the job.
- Payment protection due in 10 days. After award you must provide a payment bond or irrevocable letter of credit for 100 percent of the contract price within 10 calendar days. It must cover the contract period plus one year. Talk to your surety or bank before you submit your quote.“The submission of the payment protection is required within 10 calendar days of contract award.” Sol_140FF027Q0078.pdf, page 34
- Hidden framing repairs are in base price. Framing damage found during demolition must be fixed as part of the base price, not as extra work. Add a contingency for rafters, purlins, and fascia you cannot see yet. Read the drawings in Attachment 2 before pricing, since we could not review them.“All such work shall be included in the base bid/quote and shall not be considered optional work.” B08_Solicitation_Attachment_1_Scope_of_Work_(SOW__PWS__SOO)_11_4_26_6_pgs.pdf, page 1
- Panel gauge requirements conflict. The SOW sets 22-gauge panels for wide panels, but also requires a 20-gauge minimum. The 20-gauge rule is stricter. Ask the contracting officer which thickness governs before you price the metal.“The minimum gauge for aluminum panels must be 20-gauge, .032 inch thick (.8 mm thick) or greater.” B08_Solicitation_Attachment_1_Scope_of_Work_(SOW__PWS__SOO)_11_4_26_6_pgs.pdf, page 3
- Insurance limits not final. The clause lists liability limits of $100,000 per person, $300,000 per occurrence, and $50,000 property damage. A note says the Contracting Officer will set these amounts. Ask for the final limits and get an insurer quote before you price.“$100,000 each person” Sol_140FF027Q0078.pdf, page 36
Key terms
| Who can bid | Small businesses only (total 100% small business set-aside)NAICS 238160, Roofing Contractors, size standard $19M.Sol_140FF027Q0078.pdf, page 3 |
|---|---|
| Contract period | 150 calendar days after notice to proceedThe form lists 02/08/2027 to 07/08/2027 and delivery on 07/08/2027. These dates depend on the award date.Sol_140FF027Q0078.pdf, page 10 |
| How they choose | Lowest total price (price-only evaluation)Your quote must be responsive and you must be a responsible bidder. No technical rating is used.Sol_140FF027Q0078.pdf, page 45 |
| How to submit | Email to adam_graham@ios.doi.gov, due 1300 Eastern on 12/23/2026Section L says the quote must be emailed. Item 8 also lists a mailing address.Sol_140FF027Q0078.pdf, page 40 |
| Questions due | Monday, 12/14/2026 at 11:00 AM Eastern TimeSend written questions to adam_graham@ios.doi.gov.Sol_140FF027Q0078.pdf, page 40 |
| Contract type | Firm-fixed-price, lump sumSection B lists eight lump-sum lines and a grand total.Sol_140FF027Q0078.pdf, page 3 |
| Site visit | 8 December 2026, 9AM to 12PM local time. Notify by 4 December 2026 at 1PM Eastern.Attendance is encouraged, not required. Meeting place is 610 Wilder Road.Sol_140FF027Q0078.pdf, page 40 |
How to respond
- Email your quote to adam_graham@ios.doi.gov by 1300 local time (-05:00) on Wednesday, 12/23/2026.
- Include the completed SF 1442 (blocks 14 through 20C), the Section B price schedule for all eight lines, and your representations and certifications, or a statement that they are already in SAM.
- Include any signed amendments. The text provided lists none.
- Number of paper copies: Not stated. Confirm with Adam Graham whether a copy must also go to the Falls Church, VA address in Item 8.
- To attend the 8 December 2026 site visit, notify jeremy_dixon@fws.gov by 4 December 2026 at 1PM Eastern, with a copy to adam_graham@ios.doi.gov.
Attached files
From SAM.gov. Download links open the original files.
- B08_Solicitation_Attachment_2_Drawings_Specifications_Pole_Barn_Roof_Photos_11_4_26_(9pgs).pdf Scanned image, not read.
- B08_Solicitation_Attachment_3_Wage_Determination_FL20260022_dated_5_18_26_(4_pgs).pdfThis is the Davis-Bacon wage determination with the required labor rates. The text in our copy came out garbled, so I could not read the rates reliably. You must read the file to price labor. Read.
- Sol_140FF027Q0078.pdfThis is the solicitation with the SF 1442 cover form, pricing schedule, clauses, and award rules. You must complete and sign the SF 1442 and fill in the Section B price schedule. Read.
- B08_Solicitation_Attachment_1_Scope_of_Work_(SOW__PWS__SOO)_11_4_26_6_pgs.pdfThis is the statement of work for the roof replacement and its requirements. You must read it and price every item, but you do not fill it in. Read.
Not stated in what we read
- Estimated contract value. The notice does not give a dollar amount.
- Contents of Attachment 2, the drawings, specifications, and photos (9 pages). It is a scanned image and I could not review it. You must read it.
- Davis-Bacon wage rates for this job. I could not read them reliably from Attachment 3.
- Final liability insurance amounts. The notice says the Contracting Officer will set them.
- Number of copies to submit. Item 13a leaves the copy count blank.
- How many calendar days your offer must stay open. Item 17 is blank and the minimum is 0 days.
Notice text
FL-GREAT WHITE HERON NWR POLE BARN ROOF REPLACEMENT
As published on SAM.gov.
Contacts
- Graham, Adam, adam_graham@ios.doi.gov, 7623250609
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 23, 1:00 PM ET27 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238160, roofing contractors, soonest deadline first.
- Federal Prison System / Bureau of PrisonsReplace 10 housing unit roofs at Bastrop prison, TX
- Indian Health ServiceRoof leak repairs at IHS sites in New Mexico
- Forest ServiceRoof replacement and painting at Mesa Falls, Idaho
- Forest ServiceThree roof replacements, Stevensville and Darby, MT
- Federal Prison System / Bureau of PrisonsRoof replacement at FMC Lexington, Lexington, KY
- Department of EnergyRoof replacement on two buildings at PPPL, Princeton, NJ
- Department of the ArmyGate house roof repairs at Thomaston Lake Dam, CT
- Department of Veterans AffairsBid-Build (BB) Replace Miami VAHCS BLDG1 Roof
Free · at most one email a morning
Get new notices from Departmental Offices by email
Each morning we'll send the new solicitations and sources-sought notices from Departmental Offices, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy