1. Opportunities
  2. Department of Homeland Security
  3. US Coast Guard
  4. 70Z08027R17004B00

MTU engine parts and overhauls for Coast Guard, Baltimore

The Coast Guard wants genuine MTU engine parts and overhauled engine components for its 154-foot patrol boats.

Official title: FRC MTU PARTS AND COMPONENT OVERHAULS

Deadline
Nov 30, 4:00 PM ET
4 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
$471K
Likely Johnson & Towers LLC
Place
Not stated
Buyer: CG-Sea-C21

What they're buying

It will award a requirements contract with five one-year ordering periods, with work done at your facility and delivery to Baltimore, MD.

Top catches

Due date conflicts across records
“Response deadline: 2026-11-30T16:00:00-05:00” SAM.gov record

The SAM.gov record shows November 30, 2026, but the amendment sets November 23, 2026 at 4:00 p.m. Eastern Time. Plan to send your quote by November 23 and confirm the date with the contracting officer.

MTU distributor letter required
“Contractors shall provide a letter from MTU verifying that their company is a distributor with MTU authorized to service and supply parts for the MTU 20V4000M93L series main diesel engine.” FRC MTU Solicitation RFO Part 15.109 Final.pdf, page 32

Without a letter from MTU naming your company as an authorized distributor, your technical plan fails. Your lead technician must also be trained and certified to MTU standards CM3 and CE3.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 4 of 10 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Open, inspect and overhaul MTU engine components: four turbos, cylinder heads (280), two starters, coolant and sea water pumps, intercooler core, control lever, oil cooler (14 each) and LOP 8-06 (5).
  • Submit an inspection report and a final test report for each overhaul. Inspections are due 30 days after receipt of GFP. Overhauls are due 45 days after Coast Guard approval.
  • Furnish genuine OEM replacement parts from the parts CLINs (58 items, such as gaskets, O-rings, transmitters, restrictors and tube assemblies), with a percentage markup or discount on other catalog parts.
  • Core exchange for nine items, including a conrod, crankcase, crankshaft, HP fuel pump and 23 injector assemblies.
  • Provide on-site technical support for the 20V4000M93L engine, plus its travel, within 3 days after the contracting officer says to proceed.
  • Pack, mark, bar code and ship each item F.O.B. destination to Baltimore, MD, with a packing list citing the contract or delivery order number.

Who supplied it lately

$471K

on a recent contract for the same kind of product: Johnson & Towers LLC. It ended May 11, 2026.

Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.

What to watch for

  • Due date conflicts across records. The SAM.gov record shows November 30, 2026, but the amendment sets November 23, 2026 at 4:00 p.m. Eastern Time. Plan to send your quote by November 23 and confirm the date with the contracting officer.
  • MTU distributor letter required. Without a letter from MTU naming your company as an authorized distributor, your technical plan fails. Your lead technician must also be trained and certified to MTU standards CM3 and CE3.
  • Signed amendments required with quote. Sign each amendment and send it with your quote, or your offer may be rejected. We could not review the signed SF 30-P00002 file, so you must open and read it on SAM.gov.“Please submit a signed copy of the amendment, SF 30-P00002, with your quote to acknowledge receipt of this amendmet.” Notice text
  • Part numbers change across periods. Ordering Period 5 lists different part numbers for some parts, such as an arm rocker, so you could price the wrong item. Ask the contracting officer to confirm the part list and CLIN numbers before you price.“Arm Rocker, P/N: X52405500365” Attachment 1 - Schedule of Supplies R3.xlsx
  • Fixed prices versus price adjustment. The notice calls for firm-fixed prices but also includes an economic price adjustment clause. Ask how price changes work before you lock prices for all five years.“Requirements contract with Firm-Fixed-Price (FFP) delivery orders with Economic Price Adjustment for five (5), one (1) year ordering periods.” FRC MTU Solicitation RFO Part 15.109 Final.pdf, page 1
  • Award rule is unclear. Section M.1 points to the lowest priced quote with a valid distributor agreement, but M.2 says technical and past performance matter more than price. Ask the contracting officer which rule applies before you set your price.“The technical and past performance factors are significantly more important than price and the Government may award to others other than the lowest priced quote based on the technical and past performance ratings.” FRC MTU Solicitation RFO Part 15.109 Final.pdf, page 32

Key terms

Who can bidOpen to all business sizes; no set-asideLarge businesses must submit a subcontracting plan. An MTU distributor letter is also required.SAM.gov record
Contract periodFive one-year ordering periods starting 12/27/2026The cover page ends the last period on 12/26/2031. Section F.1 ends it on 12/28/2031.FRC MTU Solicitation RFO Part 15.109 Final.pdf, page 9
How they chooseBest value; technical and past performance count more than priceThe technical plan is pass/fail. Price is compared only among technically acceptable quotes.FRC MTU Solicitation RFO Part 15.109 Final.pdf, page 32
How to submitEmail quote to Yaisa.O.Goodwin@uscg.milZIP files are not permitted. Split files into separate emails if needed.FRC MTU Solicitation RFO Part 15.109 Final.pdf, page 28
Questions dueClosed: November 9, 2026, 4:00 PM Eastern Standard TimeThis date has passed.FRC MTU Solicitation RFO Part 15.109 Final.pdf, page 1
Contract typeRequirements contract; firm-fixed-price orders with economic price adjustmentOrders are placed as needed. The price sheets list estimated quantities only.FRC MTU Solicitation RFO Part 15.109 Final.pdf, page 1

How to respond

  1. Email your quote to Yaisa.O.Goodwin@uscg.mil. The amendment sets November 23, 2026 at 4:00 p.m. Eastern Time, but the SAM.gov record shows November 30, so confirm the date first.
  2. Complete Attachment 1 pricing for all CLINs and all five ordering periods, plus Attachment 2 technical plan (5 pages maximum), Attachment 3 delivery schedule, Attachment 4 past performance (3 pages maximum), Attachment 5 warranty (3 pages maximum) and Attachment 6 reps and certs.
  3. Attach the signed SF 30 for amendment 00001 and the signed SF 30-P00002 for the later amendment with your quote.
  4. Include a cover letter with solicitation number 70Z08027R17004B00, company name, DUNS Number, business category, address, point of contact, telephone and email.
  5. Do not send ZIP files. Split files into separate emails where USCG email size restrictions require it.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated value: the price sheets are blank and show a total of 0, so the notice does not state a value.
  • Which due date applies: November 23, 2026 under the amendment, or November 30, 2026 under the SAM.gov record.
  • Attachment 2, the Statement of Work: the file could not be read, so we could not review it. You must read it, along with specification P-233-2039, which is not in the provided text.
  • Government-furnished property: delivery times run from receipt of GFP, but the notice does not say what it is or when it arrives.
  • Attachments 4 to 6 (past performance, warranty, reps and certs) are named in the notice but are not in the attachment list. Check SAM.gov for them.
  • Full text of the 11/12 and 11/19 amendments: the notice gives only summaries, and the signed SF 30-P00002 could not be read.

Notice text

See Attached File(s) 11/10/2026 The due date for this solicitation has been extended from November 16, 2026, to November 23, 2026, at 4:00 p.m. Eastern Time. This amendment also includes revisions to: Attachment 1, Schedule of Supplies Attachment 3, Quoter's Proposed Delivery Schedule Please submit a signed copy of the amendment, SF 30, with your quote to acknowledge receipt of this amendment. 11/12/2026 This amendment includes revisions to Attachment 1, Schedule of Supplies, for Ordering Periods 1 through 5, line items F28 through F31, and adds the cell information to the formula for line item F108.

11/19/2026 This amendment includes revisions to Attachment 1, Schedule of Supplies for Ordering Periods 1 through 5 line items 35 and 36 to ensure the fees associated with on-site technical supplor for 20V4000M93L and the on-site technical support travel. Please submit a signed copy of the amendment, SF 30-P00002, with your quote to acknowledge receipt of this amendmet.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who has supplied this lately

Contracts at U.S. Coast Guard for the same kind of product (NAICS 333618, product code 2990) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 20, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from US Coast Guard by email

Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy