Furniture and equipment for Atsugi naval base, Japan

This is a sources sought notice, which is market research only and not a solicitation, from the Army Corps of Engineers Louisville District.

Official title: Furniture, Fixtures and Equipment (FF&E) Package for NAVFAC Far East Host Nation Program Project NA311 for U.S. Naval Air Facility Atsugi, Japan - NAICS 337214

Deadline
Nov 24, 2027, 1:00 PM ET
363 days left
Who can respond
Any business
Market research, not a bid
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: W072 Endist Louisville

What they're buying

It asks firms that could supply and install a furniture, fixtures and equipment package at a building at U.S. Naval Air Facility Atsugi, Japan, over an estimated 12 months and an estimated $500,000 to $1,000,000.

Top catches

Deadline year conflicts
“Responses are due NLT 1:00 PM on 24 November 2026.” Sources Sought Market Survey FFE Japan 17 Nov 26.pdf, page 3

The survey says 1:00 PM on 24 November 2026, but the SAM record says 24 November 2027 at -05:00. Confirm the year and time zone with the contact, and plan as if the earlier date applies.

Only the web form counts
“The only authorized transmission method of responses is via filling out the survey form.” Sources Sought Market Survey FFE Japan 17 Nov 26.pdf, page 3

Email and any other route will not be accepted, and answers must fit the form's space. Draft your answers in a separate file first, then enter them in the form before the deadline.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 18, 2026 from the notice and 2 of 2 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Base package 1: desks, chairs, file cabinets, tables, blinds, appliances and shop equipment, by quantity in the Bill of Materials.
  • Option package 2: book shelves, conference tables, fans, air conditioners, welding machines and other shop equipment, which may be ordered within 90 days of award.
  • Receive, inspect, store, deliver to the building and install every product, including products from partner vendors.
  • Field verify space, power, exhaust, plumbing and window coverings before ordering, and supply power cords, dryer exhaust ducts, hoses and fittings.
  • Provide a Project Manager or Lead Installer, with daily reports and photos on active installation days, and document any damage.
  • Price shipping and freight to Japan, installation, and project administration with three visits as separate lines in the Bill of Materials.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline year conflicts. The survey says 1:00 PM on 24 November 2026, but the SAM record says 24 November 2027 at -05:00. Confirm the year and time zone with the contact, and plan as if the earlier date applies.
  • Only the web form counts. Email and any other route will not be accepted, and answers must fit the form's space. Draft your answers in a separate file first, then enter them in the form before the deadline.
  • Installation scope conflicts. The Bill of Materials says GOJ will install the paper towel dispensers, but the survey requires you to install all products. Ask the contact whether to price installation for those six dispensers, since GOJ is not defined in the notice.“Do not include labor to install. GOJ will install.” Sources Sought Attachment 1 of 1 - Bill of Materials_1833787.pdf, page 1
  • Equipment outside furniture code. The list includes bandsaws, welding machines and a 60-ton hydraulic press, and Option C covers garage and maintenance equipment. Check whether your firm fits NAICS 337214 (1100 employees) or the separate notice for NAICS 333998 (700 employees).“Option C (Equipment Scope): Sourcing, OCONUS delivery, and installation of the industrial garage/maintenance equipment portion only.” Sources Sought Market Survey FFE Japan 17 Nov 26.pdf, page 2
  • Option package has a 90-day window. Package 2 may be ordered up to 90 days after award, but it does not add time to the performance period. Price it separately and plan crews so the work fits within the 12 months.“The Option CLIN (FF&E Package 2) may be exercised within ninety (90) calendar days from the date of award.” Sources Sought Attachment 1 of 1 - Bill of Materials_1833787.pdf, page 2
  • Site checks before ordering. You must confirm space, power, exhaust, plumbing and window coverings before you place orders. Plan for someone to check these on site, since the notice does not say whether a site visit is offered.“field verify space availability and available utility connections” Sources Sought Market Survey FFE Japan 17 Nov 26.pdf, page 1

Key terms

Who can bidAny size firm may respond to this market researchSize standard for NAICS 337214 is 1100 employees. A response is not a bid.Sources Sought Market Survey FFE Japan 17 Nov 26.pdf, page 1
Contract period12 months (estimated)The option package does not extend the period of performance.Sources Sought Market Survey FFE Japan 17 Nov 26.pdf, page 1
How to submitMicrosoft Form only; email responses are not acceptedKeep your answers within the space provided in the form.Sources Sought Market Survey FFE Japan 17 Nov 26.pdf, page 2
Questions dueNot statedQuestions go to Jennifer King by email.Sources Sought Market Survey FFE Japan 17 Nov 26.pdf, page 4
Estimated value$500,000.00 to $1,000,000.00This is the government's estimate. The Bill of Materials has no prices.Sources Sought Market Survey FFE Japan 17 Nov 26.pdf, page 2
Contract typeFirm-fixed price (anticipated)The notice says a firm-fixed price contract is anticipated.Sources Sought Market Survey FFE Japan 17 Nov 26.pdf, page 1

How to respond

  1. Gather your business name, address, point of contact, business size status, any GSA contract numbers, and your UEI and CAGE code.
  2. For each example project from the last five years, give the contract or task order number, completion date, scope, type and size, the percentage you self-performed, and the original amount and any modifications.
  3. State whether you can perform Option A (full scope), Option B (furniture only) or Option C (equipment only).
  4. Enter everything in the Microsoft Form at https://forms.osi.apps.mil/r/J5V0yMcipa or the QR code in the survey, within its space limit. Email is not accepted. The survey says 1:00 PM on 24 November 2026 with no time zone, and the SAM record says 2027.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Which year is correct for the deadline, and the time zone for the 1:00 PM deadline.
  • Whether the solicitation will be set aside for small businesses. The set-aside is not stated.
  • When the solicitation is expected, and whether this survey leads to an award.
  • Whether a site visit or pre-bid meeting is planned.
  • What GOJ means and whether it will install anything besides the paper towel dispensers.
  • The deadline for questions about this notice.

Notice text

Updated 17 Nov 26 - See the attached Sources Sought Notice - NAICS 337214.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 18, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy