- Opportunities
- Department of Veterans Affairs
- 36C24626B0041_1
FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)
Official title: Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)
Open, 16 days left
- Deadline
- Dec 2, 9:00 AM ET
- Notice type
- Solicitation
- Set-aside
- SDVOSB set-asideReserved for service-disabled veteran-owned small businesses (FAR 19.14).
- Industry
- Commercial and Institutional Building ConstructionNAICS 236220, Construction
- Place of performance
- Durham, NC
- Buying office
- 246-Network Contracting Office 6 (36C246)Office 36C246, Department of Veterans Affairs
- Solicitation number
- 36C24626B0041_1
- Product or service code
- Z2DA
- Posted
- Oct 23, 2026
- Source
- SAM.govVersion 1, last change seen Nov 16, 2026, 4:30 AM UTC
Notice text
Replace Domestic Water, Chilled Water, and Steam Piping Project Number 558-24-160 STATEMENT OF WORK Description of Work - Summary: The piping at the Durham VA Health Care Center, 508 Fulton St, Durham, NC is aging. There is an immediate need to replace the domestic water, chilled water and steam piping. General: The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact of normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. All work shall be performed according to the attached drawings and specifications. The VA will accept the Superintendent shall perform the roles and responsibilities of Superintendent and Quality Control—dual hat. Safety officer must remain separate. Place of Performance: Tasks will be performed at the VA Medical Center Durham, VA. Work will be around an occupied healthcare facility in operation 24 hours a day. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to clinic and medical center operations. Period of Performance: Completion of project shall be 603 calendar days from NTP. This includes procurement of long lead time items.
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Alice Custis, Contracting Officer, alice.custis@va.gov, 757.722.9961 ext. 18670
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 16, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Other open notices in commercial and institutional building construction
Get new notices from Department of Veterans Affairs by email
Each morning we send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.