- Opportunities
- Department of Veterans Affairs
- 36C24827R0028
Temporary shoring in Building 1 crawl space, Bay Pines, FL
Presolicitation for a set-aside construction job to install temporary structural shoring and repair structural concrete in the crawl space of Building 1 at the Bay Pines VA Medical Center, Florida.
Official title: Y1DZ--FY27 NRM-Base (PROJ 516-23-604) BB - Install Temp Shoring in Crawl Space at Building 1
- Deadline
- Jan 19, 2027, 2:00 PM ET
- 54 days left
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Bay Pines, FL
- Buyer: 248-Network Contract Office 8 (36C248)
What they're buying
The work runs 90 calendar days from the notice to proceed, and no contract will be awarded from this notice.
Top catches
“A request for proposal will be posted on or about 16 December 2026.” Notice text
The notice says the RFP will be posted on or about 16 December 2026, but also says it will be published after the synopsis closes, which is near the 19 January 2027 response date. Ask the contracting officer which date is correct before you plan your bid.
“The complete scope and technical requirements will be contained in the solicitation attachments.” Notice text
The drawings file and specification pages 54 to 157 could not be reviewed here. The structural repair details are in the drawings, so you must read them before you price the job.
Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 3 of 4 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Install temporary structural shoring in the Building 1 crawl space, with all labor, equipment, materials and certifications.
- Repair structural concrete damage in three predominant areas of the crawl space.
- Concrete repair work in the specifications: remove unsound concrete, patch with mortar, apply FRP fabric reinforcement, and inject epoxy or hydrophilic grout where the drawings call for it.
- Run a daily confined space entry program, with 8 hours of OSHA training for every worker and a special inspector furnished by the general contractor.
- Prepare submittals, shop drawings, as-built drawings, meeting minutes and bi-weekly progress meetings with the COR.
- Provide a one-year construction warranty with joint 4 and 9 month inspections and a local warranty contact.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Conflicting RFP posting dates. The notice says the RFP will be posted on or about 16 December 2026, but also says it will be published after the synopsis closes, which is near the 19 January 2027 response date. Ask the contracting officer which date is correct before you plan your bid.
- Drawings and some specs not reviewed. The drawings file and specification pages 54 to 157 could not be reviewed here. The structural repair details are in the drawings, so you must read them before you price the job.
- Five years of FRP experience required. The FRP reinforcement section requires five years of experience with at least 10 successful installations, and training by the manufacturer. Confirm your firm meets this before you commit to a bid.“The Contractor shall have a minimum of five years experience in FRP” S02_Specifications - Final Submission-Rev1.pdf, page 159
- Crawl space is a confined space. Each worker needs 8 hours of OSHA confined space training before work starts. You must get a daily entry permit from the FMS Safety office and notify the Seminole Fire Department on each entry. Price the attendant and permit time.“The crawlspaces of Building 1 are considered confined spaces.” S02_Temp Shoring Construction SOW V2.pdf, page 2
- Work only on weekdays by default. Work is limited to 0700 to 1630, Monday through Friday, excluding federal holidays. Weekend or after-hours work needs a request to the COR 14 calendar days ahead, and approval is not guaranteed. Build this limit into your 90-day schedule.“Monday through Friday, excluding Federal holidays.” S02_Temp Shoring Construction SOW V2.pdf, page 2
- Nothing installed before submittal approval. Submittals are due within 10 calendar days of award, and the VA has 15 business days to review them. No materials can be installed until approved, so review time can eat into your 90 days. Plan an early submittal package.“Contractor shall submit all required material/shop drawing submittals to the Contracting Officer within 10 calendar days of award” S02_Temp Shoring Construction SOW V2.pdf, page 3
Key terms
| Who can bid | Service-disabled veteran-owned small businesses only (SDVOSB set-aside)Size is checked in the SBA Small Business Search. Size standard is $19M for NAICS 238120.Notice text |
|---|---|
| Contract period | 90 calendar days from receipt of Notice to ProceedWork must begin within 10 days of the notice to proceed, according to the SOW.Notice text |
| How to submit | Not stated for proposals. Express interest by email to Laurie.Whitmore@va.govThe notice asks SDVOSBs to contact the contract specialist. How proposals are delivered is not stated.Notice text |
| Estimated value | Between $500,000.00 and $1,000,000.00The notice gives a VAAR magnitude band, not an exact estimate.Notice text |
| Contract type | Bid/build construction contractThe specifications reference payment under fixed-price construction contracts (FAR 52.232-5).Notice text |
| Site visit | By appointment only, through the CORThe text does not say a visit is mandatory. Book one with the COR if you want to see the crawl space.S02_Specifications - Final Submission-Rev1.pdf, page 7 |
How to respond
- Email Contract Specialist Laurie Whitmore at Laurie.Whitmore@va.gov to say you want to compete. The notice asks SDVOSBs to do this so the VA can confirm enough eligible firms.
- Confirm your SDVOSB status and size in the SBA Small Business Search at https://search.certifications.sba.gov/, and keep your SAM.gov registration active through final invoice payment.
- Ask the contracting officer for the proposal due date, the question deadline and the evaluation basis. The notice does not state them.
- Watch for the RFP. The notice gives 16 December 2026 as the posting date and also says it comes after the synopsis closes, so confirm the date in writing.
- Proposal delivery method, format and required forms: Not stated. Read them in the RFP when it is posted.
Attached files
From SAM.gov. Download links open the original files.
- 36C24827R0028_1.docxThe solicitation notice record with set-aside, NAICS, dates and contacts. Read only; you fill in or sign nothing here. Read.
- S02_Drawings - Final Submission-Rev1.pdf Not read: over our length limit.
- S02_Temp Shoring Construction SOW V2.pdfThe statement of work covering hours, confined space steps, utility outage rules, submittals and payment terms. Read only; nothing to sign. Read.
- S02_Specifications - Final Submission-Rev1.pdfSpecifications, reviewed in part (pages 1 to 53 and 158 to 190 of 190). Covers general requirements, schedules, safety and repair materials. Read only; you must read the full file, including pages 54 to 157. Read in part (pages 1–53 and 158–190 of 190).
Not stated in what we read
- Proposal due date, delivery method and required forms, since the RFP is not yet posted.
- How proposals will be evaluated and whether price or best value decides the award.
- Performance and payment bond amounts, and insurance minimums.
- Contents of the drawings and of specification pages 54 to 157, which could not be reviewed here.
- Whether wage determinations apply to this work, and what rates they set.
- Whether liquidated damages apply for late completion, and the amount.
Notice text
PRESOLICITATION NOTICE Install Temporary Shoring in Crawl Space at Building 1 Bay Pines VAMC Set aside for service-disabled veteran-owned small business (SDVOSB) This procurement is set-aside pursuant to an order of priority established in 38 U.S.C. 8127. No contract shall be awarded from this pre-solicitation notice. A request for proposal will be posted on or about 16 December 2026. Project # 516-23-604: Install Temporary Shoring in Crawl Space at Building 1, located at the Bay Pines VAMC - 10000 Bay Pines Blvd., Bay Pines, FL 33744 RFP# 36C24827R0028.
Period of Performance: 90 calendar days from receipt of Notice to Proceed. THE BID/BUILD CONTRACTOR: The contractor will furnish all labor, supervision, materials, equipment, tools, certifications, and services required to install temporary structural shoring in the crawl space of Building 1 at the Bay Pines VA Medical Center, and perform associated structural work, inspections, and closeout in accordance with the statement of work, specifications, and drawings issued with the RFP. Work may involve constrained crawl-space access and structural safety controls.
The complete scope and technical requirements will be contained in the solicitation attachments. The NAICS code for this procurement is 238120, Structural Steel and Precast Concrete Contractors, with a small business size standard of $19M. The VAAR 836.204 magnitude of this project is between $500,000.00 and $1,000,000.00. The project will be 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. All businesses desiring to be considered must be registered with SAM.gov before contract award, during the contract period of performance, and must continue to remain registered through the final invoice payment.
Business size and NAICS will be verified using the Small Business Search (https://search.certifications.sba.gov/). The Contracting Officer for this project will be Laurie Whitmore. This is a pre-solicitation notice only. No contract shall be awarded from this pre-solicitation notice. The Request for Proposal (RFP) with further details will be published after the closing of the synopsis. All responsible sources may submit a proposal when requested, which shall be considered by the agency.
Definitization of equitable adjustments for construction change orders: In accordance with RFO FAR 5.101(c)(4)(v) and 36.101-4, the VA provides the following information concerning definitization of equitable adjustments for construction change orders. Under applicable FAR Part 43 and VA procedures, the Contracting Officer seeks to negotiate and definitize equitable adjustments as promptly as practicable. SDVOSBs are encouraged to respond to communicate interest in competing for this requirement to support the requirement set-aside.
To confirm sufficient eligible SDVOSBs, please contact Contract Specialist Laurie Whitmore at Laurie.Whitmore@va.gov.
As published on SAM.gov.
Contacts
- Laurie Whitmore, Contracting Officer, Laurie.Whitmore@va.gov, (813) 816-9093
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 25, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 19, 2027, 2:00 PM ET54 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportFree · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy