- Opportunities
- Department of Energy
- 89303326REM000152
Operate Hanford 222-S analytical lab, Richland, WA
DOE wants one contractor to run the 222-S Laboratory at the Hanford Site in Richland, WA, starting with a transition of about 120 days.
Official title: HANFORD 222-S LABORATORY – FINAL REQUEST FOR PROPOSAL
- Deadline
- Dec 17, 5:00 PM ET
- 22 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- $572M
- Likely Hanford Laboratory Management and Integration LLC
- Place
- Richland, WA
- Buyer: Em-Environmental Mgmt Con Bus Ctr
What they're buying
The contract can run up to seven years and mixes cost-plus-award-fee work with a firm-fixed-price transition.
Top catches
“The due date for receipt of proposals has been extended to 05:00 PM Eastern Standard Time on December 17, 2026.” Amendment 0001 - SF30_89303326REM000152 0001.pdf, page 2
Use Thursday, December 17, 2026, 5:00 p.m. Eastern Standard Time. The October cover letter still shows December 10, so do not plan around that older date.
“RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.” Amendment 0001 - SF30_89303326REM000152 0001.pdf, page 1
You must acknowledge Amendment 0001 before the deadline. A late or missing acknowledgment can get your offer rejected. A separate letter or email that cites the solicitation and amendment numbers is allowed.
Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 23 of 61 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Take over the 222-S Laboratory from the current contractor, HLMI, during a transition of about 120 days.
- Run analytical services: archive 100 new samples a year in 250 ml jars and reconstitute 10 archived samples a year.
- Operate and maintain the 38 structures listed in the 200 West area, including the Central Analytical Laboratory (222S).
- Take over 11 listed waste sites, including tanks and stacks, after transition.
- Provide key personnel: Laboratory Manager, Analytical Operations Manager and Facility Operations Manager.
- Submit contract deliverables on schedule, starting with a Transition Plan within 15 days after notice to proceed.
Who did it before
$572M
on the contract that likely holds this work now: Hanford Laboratory Management and Integration LLC. It ends Jan 4, 2027.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Deadline moved to December 17. Use Thursday, December 17, 2026, 5:00 p.m. Eastern Standard Time. The October cover letter still shows December 10, so do not plan around that older date.
- Acknowledge the amendment. You must acknowledge Amendment 0001 before the deadline. A late or missing acknowledgment can get your offer rejected. A separate letter or email that cites the solicitation and amendment numbers is allowed.
- Set-aside status conflicts. The SAM record shows no set-aside, but the cover letter calls this a total small business set-aside with a 1000-employee size standard. Check your headcount against that standard before you spend time on a bid.“The Hanford 222-S Laboratory procurement will be conducted as a competitive Total Small Business Set-Aside competition.” Cover Letter [Final RFP] - Hanford 222-S Laboratory - 89303326REM000152.pdf, page 1
- Two sets of cost assumptions. The amendment uses 8.8% use tax, 0.5% B&O tax and 3.3% escalation, with 402 FTE staff. The earlier L-8 sheet shows 8.6%, 0.471%, 2.30% and 280 individuals. Price from the amendment version, since the question period has closed.“Include an escalation rate of 3.3% compounded annually.” Amendment 0001_222-S_Attachment L-8_Assumptions.xlsx
- Service Contract Act wage rates. Labor for service jobs likely must follow this Service Contract Act wage determination for Benton and Franklin Counties. Pages 7 to 12 were not provided, so check every labor category you plan to use against the full list before pricing.“Wage Determination No.: 2015-5527” Sec J [Final RFP] Att. J-09.a - 89303326REM000152.pdf, page 1
- Past performance and accounting forms. Your proposal likely needs an L-3 form for each reference contract, the L-10 list of DOE contracts, and written answers on your accounting system in L-9. Each L-3 form is limited to seven pages, so gather reference data early.“Completed Form limited to seven pages per reference contract.” Sec L [Final RFP] Att. L-03 - 89303326REM000152.pdf, page 1
Key terms
| Who can bid | Small businesses, per cover letterSAM record shows no set-aside. The size standard for NAICS 562910 is 1000 employees.Cover Letter [Final RFP] - Hanford 222-S Laboratory - 89303326REM000152.pdf, page 1 |
|---|---|
| Contract period | Up to 7 years: 5-year base plus two 1-year optionsThe 5-year base includes the transition period.Cover Letter [Final RFP] - Hanford 222-S Laboratory - 89303326REM000152.pdf, page 1 |
| How they choose | One award to the best value to the GovernmentEvaluation factors are in Section M, which was not provided.Cover Letter [Final RFP] - Hanford 222-S Laboratory - 89303326REM000152.pdf, page 1 |
| Questions due | 11:59 p.m. Eastern Daylight Time, October 22, 2026 (passed)Questions were due by email to 222S.laboratory@emcbc.doe.gov on the Industry Comment Template.Cover Letter [Final RFP] - Hanford 222-S Laboratory - 89303326REM000152.pdf, page 1 |
| Estimated value | About $30M a year, for evaluation onlyNo total contract value is stated in the text provided.Sec L [Final RFP] Att. L-03 - 89303326REM000152.pdf, page 2 |
| Contract type | Hybrid: cost-plus-award-fee plus firm-fixed-price transitionSingle award to one contractor.Cover Letter [Final RFP] - Hanford 222-S Laboratory - 89303326REM000152.pdf, page 1 |
How to respond
- Acknowledge Amendment 0001 in writing before the deadline. Cite solicitation 89303326REM000152 and the amendment number, in a separate letter or email, or on each copy of your offer.
- Submit your proposal by Thursday, December 17, 2026, 5:00 p.m. Eastern Standard Time. Where to send it and the format: Not stated in the text provided.
- Download the past performance forms from https://www.emcbc.doe.gov/SEB/Hanford222S. Complete an L-3 form for each reference contract, the L-4 cover letter and questionnaire, the L-10 list of DOE contracts, and L-5 on any terminated or cure-notice contracts.
- Answer the L-9 accounting system questions in writing. Complete the L-6 cost worksheets using the Amendment 0001 L-8 assumptions.
- Check the procurement website and SAM.gov again before the deadline, since DOE posts updates there.
Attached files
From SAM.gov. Download links open the original files.
61 more files from ZIP archives, 23 read
- Amendment 0001 - SF30_89303326REM000152 0001.pdfAmendment form that extends the due date to December 17, 2026 and requires you to acknowledge receipt; you must sign and return the acknowledgment. Read.
- Amendment 0001 - Summary of Changes.pdf Not read: over our length limit.
- Amendment 0001_222-S_Attachment J-02_Directives.pdf Not read: over our length limit.
- Amendment 0001_222-S_Attachment L-10_List of DOE Contracts.pdfBlank form for DOE prime contracts from the last five years; you must complete it. Read.
- Amendment 0001_222-S_Attachment L-3_Past Performance Reference Information Form.pdf Not read: over our length limit.
- Amendment 0001_222-S_Attachment L-4_Past Performance Cover Letter and Questionnaire.pdf Not read: over our length limit.
- Amendment 0001_222-S_Attachment L-6_Cost Proposal Worksheets.xlsx Not read: over our length limit.
- Amendment 0001_222-S_Attachment L-7_Consolidated Direct Cost Schedules.xlsx Not read: over our length limit.
- Amendment 0001_222-S_Attachment L-8_Assumptions.xlsxCost assumptions for pricing; you must price to these values. Read.
- Amendment 0001_222-S_Section_A.pdf Older version, not read.
- Amendment 0001_222-S_Section_B.pdf Older version, not read.
- Amendment 0001_222-S_Section_C.pdf Older version, not read.
- Amendment 0001_222-S_Section_H.pdf Not read: over our length limit.
- Amendment 0001_222-S_Section_I.pdf Older version, not read.
- Amendment 0001_222-S_Section_K.pdf Older version, not read.
- Amendment 0001_222-S_Section_L.pdf Older version, not read.
- Amendment 0001_222-S_Section_M.pdf Older version, not read.
- Cover Letter [Final RFP] - Hanford 222-S Laboratory - 89303326REM000152.pdfDOE cover letter with dates, set-aside wording and award basis; it says it is not part of the RFP, so read it for context only. Read.
- Enclosure - Industry Comment Template.xlsxBlank template for questions; the question period has closed, so you need not complete it unless DOE reopens questions. Read.
- Sec A [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec B [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec C [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec D [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec E [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec F [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec G [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec H [Final RFP] - 89303326REM000152.pdfSection H contract clauses; only the first four pages and last three were included, so read the full section on SAM.gov. Read in part (pages 1–4 and 68–70 of 70).
- Sec I [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec J [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec J [Final RFP] Att. J-01 - 89303326REM000152.pdfAcronym list for reference only; read as needed. Read.
- Sec J [Final RFP] Att. J-02 - 89303326REM000152.pdfList of DOE directives and regulations the contractor must follow; read it, since Amendment 0001 also revises J-2 and we could not review that version. Read.
- Sec J [Final RFP] Att. J-03.a - 89303326REM000152.pdf Older version, not read.
- Sec J [Final RFP] Att. J-03.b - 89303326REM000152.pdfMatrix of Hanford site services and interfaces; read the full matrix for any services you would use or provide. Read in part (pages 1–7 and 129–134 of 134).
- Sec J [Final RFP] Att. J-04 - 89303326REM000152.pdfSample performance evaluation plan for FY2027, showing fee tied to performance incentives; the real plan is inserted after award, so read it for the fee approach only. Read in part (pages 1–6 and 27–31 of 31).
- Sec J [Final RFP] Att. J-05 - 89303326REM000152.pdf Older version, not read.
- Sec J [Final RFP] Att. J-06 - 89303326REM000152.pdf Scanned image, not read.
- Sec J [Final RFP] Att. J-07 - 89303326REM000152.pdf Older version, not read.
- Sec J [Final RFP] Att. J-08 - 89303326REM000152.pdf Older version, not read.
- Sec J [Final RFP] Att. J-09.a - 89303326REM000152.pdfService Contract Act wage determination; you must price labor against its rates. Read in part (pages 1–6 and 13–14 of 14).
- Sec J [Final RFP] Att. J-09.b - 89303326REM000152.pdf Scanned image, not read.
- Sec J [Final RFP] Att. J-10 - 89303326REM000152.pdfContract deliverables with due dates after notice to proceed; you must plan to meet them, and pages 8 to 16 were not provided. Read in part (pages 1–7 and 17–20 of 20).
- Sec J [Final RFP] Att. J-11 - 89303326REM000152.pdfList of government-furnished services and information that DOE will provide; read it to know what DOE supplies. Read.
- Sec J [Final RFP] Att. J-12 - 89303326REM000152.pdfList of 38 structures in the 200 West area; read it to size the facility scope. Read.
- Sec J [Final RFP] Att. J-13 - 89303326REM000152.pdfList of 11 waste sites assigned to the new contractor after transition; read it to size the scope. Read.
- Sec J [Final RFP] Att. J-14 - 89303326REM000152.pdfCommunity commitment plan to be prepared after award; you do not fill it in now. Read.
- Sec J [Final RFP] Att. J-15 - 89303326REM000152.pdf Scanned image, not read.
- Sec J [Final RFP] Att. J-16 - 89303326REM000152.pdfList of fire protection exemptions and equivalencies at Hanford; read it, since they may affect your work. Read.
- Sec K [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec L [Final RFP] - 89303326REM000152.pdf Older version, not read.
- Sec L [Final RFP] Att. L-01 - 89303326REM000152.pdf Older version, not read.
- Sec L [Final RFP] Att. L-02 - 89303326REM000152.pdf Older version, not read.
- Sec L [Final RFP] Att. L-03 - 89303326REM000152.pdfPast performance reference form, one per reference contract; you must complete it. Read.
- Sec L [Final RFP] Att. L-04 - 89303326REM000152.pdf Older version, not read.
- Sec L [Final RFP] Att. L-05 - 89303326REM000152.pdfForm for contracts terminated for default and cure notices; you must complete it or submit a blank form saying you have none. Read.
- Sec L [Final RFP] Att. L-06 - 89303326REM000152.xlsxCost proposal worksheets; you must fill in costs by year and cost element. Read.
- Sec L [Final RFP] Att. L-07 - 89303326REM000152.xlsxLabor cost schedules; only the start was included, so read the full file on SAM.gov and fill it in. Read in part.
- Sec L [Final RFP] Att. L-08 - 89303326REM000152.xlsxEarlier cost assumptions with a different set of values; the Amendment 0001 version supersedes it. Read.
- Sec L [Final RFP] Att. L-09 - 89303326REM000152.pdfQuestions about your accounting system that you must answer in writing. Read.
- Sec L [Final RFP] Att. L-10 - 89303326REM000152.pdf Older version, not read.
- Sec L [Final RFP] Att. L-11 - 89303326REM000152.pdf Older version, not read.
- Sec M [Final RFP] - 89303326REM000152.pdf Older version, not read.
Not stated in what we read
- How and where to send your proposal, and the format rules (Section L.19 was not provided).
- How proposals are evaluated and how price is weighed (Section M was not provided).
- Total contract value. The only dollar figure is about $30M a year, stated for evaluation.
- Whether you must hire incumbent staff and honor their paid time benefit balances (H.4 to H.6 were not provided).
- Security clearance, insurance and bonding requirements (Sections H.11 to H.12 and I were not provided).
- What Amendment 0001 changed in full. Its summary of changes and its versions of Section H and J-2 were not included.
Notice text
The Department of Energy (DOE) is releasing the Final Request for Proposal (RFP), Solicitation Number (No.) 89303326REM000152, for the Hanford 222-S Laboratory procurement. The Final RFP can be found on the Environmental Management Consolidated Business Center (EMCBC) Hanford 222-S Laboratory’s procurement website at https://www.emcbc.doe.gov/SEB/Hanford222S. Amendment 0001 to the Final Request for Proposal under Solicitation Number 89303326REM000152 has been posted. Offerors are responsible for reviewing these changes to ensure understanding of the requirements identified.
As published on SAM.gov.
Contacts
- Ortiz Delgado, Jose E., jose.ortiz@emcbc.doe.gov, 5133102361
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of Energy for the same kind of work (NAICS 562910, service code F999) in Washington that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Services Described in Section C.2 to Operate and Maintain the 222-S Laboratory Complex.Hanford Laboratory Management and Integration LLC · 89303320CEM000075 | $572,390,977 | Jan 4, 2027in 1 month | WA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 25, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 17, 5:00 PM ET22 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 562910, remediation services, soonest deadline first.
- Department of Veterans AffairsAsbestos abatement at Montrose VA Medical Center, NY
- National Institutes of HealthSources Sought Notice: Asbestos and Lead Management Services
- Department of Veterans AffairsContaminated soil removal and disposal, Los Angeles, CA
- Department of the ArmyPFAS cleanup investigation and study, Monterey, CA
- Departmental OfficesAsbestos stockpile removal in Yuma County, AZ
- Departmental OfficesMold cleanup at Merritt Island refuge, Titusville, FL
- Departmental OfficesGasoline tank site cleanup at Putah Creek, Napa, CA
- Environmental Protection AgencyEmergency and rapid response services, Atlanta, GA
Free · at most one email a morning
Get new notices from Department of Energy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy