Battelle, which runs Pacific Northwest National Laboratory for the Department of Energy, wants 19 line items for a HIP can study: thin shims, aluminum pocket plates, foils, steel strongbacks, cans and lids, and two tooling sets.

Official title: HIP CAN Study

Deadline
Dec 4, 4:00 PM PT
8 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Richland, WA
Buyer: PNNL Contracts - DOE Contractor

What they're buying

Delivery is to Richland, WA by June 30, 2027.

Top catches

Old due date still printed
“November 13, 2026, 4:00 p.m. Pacific Time” RFP_0000963801_0.00 - 10-19-2026.pdf, page 1

Page 1 of the RFP still says November 13, 2026. Amendments moved the date to November 20, then to December 4, 2026. Plan to December 4 and ask the specialist in writing if the time differs.

Questions and intent dates have passed
“Questions received late may not be answered.” RFP_0000963801_0.00 - 10-19-2026.pdf, page 4

The questions deadline (November 6) and the intent to propose deadline (November 9) have already passed. Late questions may not be answered. Ask the specialist now whether you can still file the intent form.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 39 of 66 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Four shim sizes, 25 each: 0.001, 0.002, 0.005 and 0.010 inch, 1018 carbon steel or approved equal.
  • Pocket plates, 50 each: 0.009, 0.012 and 0.015 inch 6061-T6 aluminum. Sizes conflict with the drawings; see catches.
  • Thick foils, 25 each: 0.015, 0.019 and 0.027 inch Haynes 214, each vacuum sealed in 5 mil mylar bags.
  • Strongbacks: 50 bottom and 50 top 10 gauge, and 250 18 gauge, 1018 carbon steel. Pack in skids of 4,000 lb maximum.
  • HIP cans and lids: 25 each in DQ steel and 25 each in e-beam weldable stainless steel, plus 5 first articles each for items 15 and 17.
  • Two tooling sets (DQ steel and stainless), with design presented before first articles. Spray Neolube 1.1 (or Neolube 2) to a 0.4 mil target and bake at 75 C for 10 minutes.

Who supplied it lately

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Old due date still printed. Page 1 of the RFP still says November 13, 2026. Amendments moved the date to November 20, then to December 4, 2026. Plan to December 4 and ask the specialist in writing if the time differs.
  • Questions and intent dates have passed. The questions deadline (November 6) and the intent to propose deadline (November 9) have already passed. Late questions may not be answered. Ask the specialist now whether you can still file the intent form.
  • Partial bids versus all-items rule. Your notice says partial proposals are accepted, but the RFP says a proposal missing any item or quantity may be rejected. Ask in writing before you bid on only some lines.“Offerors that fail to provide ALL items and quantities specified in this RFP may be deemed non-responsive in their entirety and may not be considered for award.” RFP_0000963801_0.00 - 10-19-2026.pdf, page 4
  • Pocket plate sizes disagree. Table I lists 0.009, 0.012 and 0.015 inch pocket plates, but the drawings show 0.0085, 0.011 and 0.0145 inch pocket depths. Confirm the size in writing before you price these items.“0.0085" POCKET DEPTH - CLADDING” Plates/Cladding (Plate Pockets)/0.0085 Pocket Depth-cladding_MITR.pdf, page 1
  • First articles added for cans. Amendment 2 adds first articles of 5 each for line items 15 and 17, the DQ steel and stainless steel HIP cans. The draft contract predates this change and does not show it, so include these in your price and schedule.“First articles will be required for line items 15 and 17. A quantity of 5 for each line will be required as a first article.” RFP-963801-Amendment 2.pdf, page 1
  • Insurance minimums apply. The contract requires minimum insurance, including $100,000 employer's liability and $1,000,000 general liability and auto liability per occurrence, with Battelle named as additional insured. Confirm your policies meet these limits before you bid.“Employers' Liability: $100,000 per occurrence” RFP_0000963801_0.00 - 10-19-2026.pdf, page 13

Key terms

Who can bidOpen to all; no set-asideSize standard is 750 employees. You must have an approved PNNL Vendor Portal registration to be awarded.SAM.gov record
Contract periodDelivery by June 30, 2027Draft contract completion date. No option years are stated.RFP_0000963801_0.00 - 10-19-2026.pdf, page 7
How they chooseLowest price that meets all technical requirementsBattelle may award without talks, so your first price should be your best price.RFP_0000963801_0.00 - 10-19-2026.pdf, page 3
How to submitEmail to christopher.martin@pnnl.gov (preferred)Subject line should include the words Proposal to RFP 963801.RFP_0000963801_0.00 - 10-19-2026.pdf, page 4
Questions dueFriday, November 6, 2026, 4:00 p.m. Pacific Time (passed)Passed. Late questions may not be answered.RFP_0000963801_0.00 - 10-19-2026.pdf, page 1
Contract typeFirm fixed pricePrices must cover materials, labor, testing, taxes, duties, tariffs, overhead, profit and delivery.RFP_0000963801_0.00 - 10-19-2026.pdf, page 1

How to respond

  1. Email your complete proposal to christopher.martin@pnnl.gov by Friday, December 4, 2026, 4:00 p.m. Pacific Time, with a subject line that includes Proposal to RFP 963801.
  2. Include a company capability statement, a statement that you can meet Appendix A and the drawings, and the ECCN or ITAR category for each item you propose.
  3. Include the signed Representations and Certifications form, including the Buy American certificate, and acknowledge Amendments 1 to 4 in writing or your offer may be rejected.
  4. Sign page 1 of the RFP with your price, payment term choice and point of contact. Do not include banking information anywhere in your proposal.
  5. Add the lead time for each item and your technical proposal. Maximum file size and accepted formats are Not stated.

Attached files

From SAM.gov. Download links open the original files.

43 more files from a ZIP archive, 16 read
  • Plates/Hip Can Assembly.pdfAssembly drawing showing how the cans, cladding, foils, strongbacks and shims stack; read only. Read.
  • Plates/Cladding (Plate Pockets)/0.0085 Pocket Depth-cladding_MITR.pdfCopy of the 0.0085 inch pocket depth cladding drawing; read only. Read.
  • Plates/Cladding (Plate Pockets)/0.0085 Pocket Depth-cladding_MITR.SLDDRW Could not be read.
  • Plates/Cladding (Plate Pockets)/0.011 Pocket Depth-Cladding_MITR.pdfCopy of the 0.011 inch pocket depth cladding drawing; read only. Read.
  • Plates/Cladding (Plate Pockets)/0.011 Pocket Depth-Cladding_MITR.SLDDRW Could not be read.
  • Plates/Cladding (Plate Pockets)/0.0145 Pocket Depth-cladding_MITR.pdfCopy of the 0.0145 inch pocket depth cladding drawing; read only. Read.
  • Plates/Cladding (Plate Pockets)/0.0145 Pocket Depth-cladding_MITR.SLDDRW Could not be read.
  • Plates/Cladding (Plate Pockets)/cladding_MITR.SLDPRT Could not be read.
  • Plates/Foil - F1/0.015 Thick Foil_MITR.pdfCopy of the 0.015 inch thick foil drawing; read only. Read.
  • Plates/Foil - F1/0.015 Thick Foil_MITR.SLDDRW Could not be read.
  • Plates/Foil - F1/0.019 Thick Foil_MITR.pdfCopy of the 0.019 inch thick foil drawing; read only. Read.
  • Plates/Foil - F1/0.019 Thick Foil_MITR.SLDDRW Could not be read.
  • Plates/Foil - F1/0.027 Thick Foil_MITR.pdfCopy of the 0.027 inch thick foil drawing; read only. Read.
  • Plates/Foil - F1/0.027 Thick Foil_MITR.SLDDRW Could not be read.
  • Plates/Foil - F1/f1_MITR.SLDPRT Could not be read.
  • Plates/Hip Can/Hipcan_Length_MITR.pdfCopy of the hip can length drawing, which lists ASTM A1008; read only. Read.
  • Plates/Hip Can/Hipcan_Length_MITR.SLDDRW Could not be read.
  • Plates/Hip Can/Hipcan_MITR.SLDPRT Could not be read.
  • Plates/Hip Can/Hipcan_Width_MITR.pdfCopy of the hip can width drawing, which lists ASTM A1008; read only. Read.
  • Plates/Hip Can/Hipcan_Width_MITR.SLDDRW Could not be read.
  • Plates/Hip Can Lid/Hip Can Lid_MITR.pdfCopy of the hip can lid drawing, which lists ASTM A1008 steel; read only. Read.
  • Plates/Hip Can Lid/Hip Can Lid_MITR.SLDDRW Could not be read.
  • Plates/Hip Can Lid/Lid_MITR.SLDPRT Could not be read.
  • Plates/Shim/0.001in-Shim_MITR.pdfCopy of the 0.001 inch shim drawing; read only. Read.
  • Plates/Shim/0.001in-Shim_MITR.SLDDRW Could not be read.
  • Plates/Shim/0.002in-Shim_MITR.pdfCopy of the 0.002 inch shim drawing; read only. Read.
  • Plates/Shim/0.002in-Shim_MITR.SLDDRW Could not be read.
  • Plates/Shim/0.005in-Shim_MITR.pdfCopy of the 0.005 inch shim drawing; read only. Read.
  • Plates/Shim/0.005in-Shim_MITR.SLDDRW Could not be read.
  • Plates/Shim/0.010in-Shim_MITR.pdfCopy of the 0.010 inch shim drawing; read only. Read.
  • Plates/Shim/0.010in-Shim_MITR.SLDDRW Could not be read.
  • Plates/Shim/Shim_MITR.SLDPRT Could not be read.
  • Plates/Strong Backs/10Gabottom_MITR.pdf Not read: over our length limit.
  • Plates/Strong Backs/10Gabottom_MITR.SLDDRW Could not be read.
  • Plates/Strong Backs/10Gabottom_MITR.SLDPRT Could not be read.
  • Plates/Strong Backs/10Gatop_MITR.pdfCopy of the 10 gauge top strongback drawing, which lists 1018 steel; read only. Read.
  • Plates/Strong Backs/10Gatop_MITR.SLDDRW Could not be read.
  • Plates/Strong Backs/10Gatop_MITR.SLDPRT Could not be read.
  • Plates/Strong Backs/18gauge_MITR.pdfCopy of the 18 gauge strongback drawing, which lists 1018 steel; read only. Read.
  • Plates/Strong Backs/18gauge_MITR.SLDDRW Could not be read.
  • Plates/Strong Backs/18gauge_MITR.SLDPRT Could not be read.
  • Plates/Hip Can Assembly.SLDDRW Could not be read.
  • Plates/hiPASSEM_MITR.SLDASM Could not be read.

Download the archive from SAM.gov.

Not stated in what we read

  • Which pocket plate sizes and which strongback steel grade are correct, because the drawings and Table I disagree.
  • Whether a late questions or intent-to-propose submission will be accepted.
  • Estimated value of the contract; the draft contract shows $TBD.
  • Whether the annual quantities in Table II will ever be bought; they are for reference only.
  • The Technical Oversight Representative, shown as TBD.
  • Several SolidWorks files could not be read, and one strongback drawing was left out for length. You must review them on SAM.gov.

Notice text

Battelle is requesting a proposal as noted in the attached documents. Please note that Battelle will entertain partial proposals and reserves the right to award multiple contracts as needed. Please also provide the following information with the proposal: Lead time for items Completed Reps & Certs form Technical Proposal as noted in the attached RFP document If there are any questions, please feel free to contact me directly. Thanks Chris Martin Contracting Specialist Pacific Northwest National Laboratory Phone: 509-372-6026 E-mail: Christopher.martin@pnnl.gov

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Energy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy