  4. W912EK27RA001

Ten composite lock gates for Brandon Road Lock, Joliet, IL

You would fabricate and deliver ten fiber reinforced polymer (FRP) composite gate structures for Brandon Road Lock and Dam near Joliet, Illinois, with deliveries due in 2028 and 2029.

Official title: Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Flushing Lock and Dam Gates Fabrication

Deadline
Dec 7, 2:00 PM CT
11 days left
Who can bid
Small businesses
Size standard for NAICS 326199: 750 employees · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: W07V Endist Rock Island

What they're buying

Only small businesses may bid, and the award goes to the lowest priced offer that is technically acceptable.

Top catches

Deadline moved to 7 December
“extend the due date for receipt of proposals from 30 November to 07 December 2026 at 2:00 PM CT” Notice text

Amendment 0001 moved the due date to 7 December 2026, 2:00 PM CT. The October slides still say 30 November, so plan to the amended date.

Gate sizes conflict in documents
“(2) 14 X 14 ft filling valves” Notice text

The notice lists 14 x 14 ft filling valves and 16 x 16 ft headgates. The slides list about 15.5 x 13.5 ft and 17 x 16 ft. Do not price until the correct sizes are confirmed with the contacts listed on the last slide.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Design and fabricate two filling valves, each 10,000 to 20,000 lb, operated by hydraulic cylinder, per the slides
  • Design and fabricate two filling valve bulkheads, each up to 20,000 lb, with UHMW-PE slides and no metal rollers
  • Design and fabricate two flushing valves, each 5,000 to 8,000 lb, operated by hydraulic cylinder
  • Design and fabricate two flushing port bulkheads that bolt to the pocket
  • Design and fabricate two dam headgates, each 15,000 to 30,000 lb, to replace aging steel gates
  • Deliver by barge or truck to Brandon Road Lock and Dam; valves and bulkheads must be fully assembled in the shop

Who supplied it lately

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline moved to 7 December. Amendment 0001 moved the due date to 7 December 2026, 2:00 PM CT. The October slides still say 30 November, so plan to the amended date.
  • Gate sizes conflict in documents. The notice lists 14 x 14 ft filling valves and 16 x 16 ft headgates. The slides list about 15.5 x 13.5 ft and 17 x 16 ft. Do not price until the correct sizes are confirmed with the contacts listed on the last slide.
  • Strict technical experience test. Technical acceptability requires at least three FRP structures over 10,000 lb built by vacuum infusion, plus a professional engineer and a supervisor with similar work. Check your record before you spend time on a bid.“Offeror has fabricated at least three (3) FRP structures weighing” BRIP FRP Pre-Proposal Meeting Slides 10-29-2026.pdf, page 17
  • Full-price performance bond. You must furnish a performance bond equal to 100 percent of the original contract price. Ask your surety now whether you can get that bond before you decide to bid.“100 percent of the original contract price” BRIP FRP Pre-Proposal Meeting Slides 10-29-2026.pdf, page 20
  • Late delivery penalty per day. Liquidated damages are set at $9,700 per calendar day, which likely means you pay this amount for each day of late delivery. Check that your build and shipping schedule fits the 2028 and 2029 windows before you price.“Liquidated damages: $9,700 per calendar day” BRIP FRP Pre-Proposal Meeting Slides 10-29-2026.pdf, page 8
  • Question and meeting dates have passed. The 29 October meeting and the 16 November question deadline are both past. You likely cannot ask new questions, so rely on the amended files and the listed contacts.“Questions regarding this solicitation shall be submitted via ProjNet by 2:00 PM CT on 16 November 2026.” Notice text

Key terms

Who can bidSmall businesses onlySet-aside under NAICS 326199, with a size standard of 750 employees.SAM.gov record
Contract periodDeliveries 1 May to 1 July 2028 and 1 May to 1 July 2029Full contract period and any option years: Not stated.BRIP FRP Pre-Proposal Meeting Slides 10-29-2026.pdf, page 8
How they chooseLowest price among technically acceptable offersPrice is not scored. It is judged on the Base Bid only, after technical and past performance review.Notice text
How to submitElectronically, through the PIEE Solicitation ModuleFormat, required forms and page limits: Not stated. See Section L of the solicitation.BRIP FRP Pre-Proposal Meeting Slides 10-29-2026.pdf, page 21
Questions due2:00 PM CT, 16 November 2026 (passed)Questions were due through ProjNet. This date is before today.Notice text
Contract typeSupply contract for fabrication and deliveryThe slides describe a separate construction contract for installation.BRIP FRP Pre-Proposal Meeting Slides 10-29-2026.pdf, page 22
Site visitVirtual pre-proposal meeting, 29 October 2026 (passed)The meeting was held on Microsoft Teams. It was not a site visit.Notice text

How to respond

  1. Submit your offer electronically through the PIEE Solicitation Module linked from SAM.gov solicitation W912EK27RA001.
  2. Have the offer in by 2:00 PM CT on Monday, 7 December 2026.
  3. Show that you meet the technical criteria: three FRP structures over 10,000 lb, a professional engineer who designed one, and a supervisor. How to format this proof: Not stated.
  4. Include past performance. Attachment J-2, the questionnaire template, was added by Amendment 0001 and is not in the files we could review.
  5. Required forms, signatures and page limits: Not stated in the text we reviewed. Read Section L of the solicitation.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated contract value: Not stated.
  • Full contract period and any option years: Not stated.
  • Solicitation document itself, including Section L and section MVR.02: not provided, so we could not review it. You must read it.
  • Attachment J-2, the past performance questionnaire template: not included in the files we reviewed. You must read it on SAM.gov.
  • Whether the head gates belong in this supply contract: the slides conflict on this.
  • Submission format, required forms and page limits: Not stated.

Notice text

The U.S. Army Corps of Engineers, Rock Island District has a requirement for the fabrication and supply of ten Fiber Reinforced Polymer (FRP) composite structures for Brandon Road Lock and Dam, Joliet, Illinois, Des Plaines River. The gates include (2) 14 X 14 ft filling valves, (2) 14 X 14 ft filling downstream bulkheads, (2) 8 X 8 ft flushing valves, (2) 8 X 8 ft flushing valve bulkheads, and (2) 16 X 16 ft dam headgates. NAICS Code: 326199 Size Standard: 750 employees 100% Small Business Set-Aside - Lowest Price Technically Acceptable A pre-proposal meeting will be held virtually via Microsoft Teams on 29 October 2026, at 2:00 PM CT. Details and access instructions can be found within the solicitation.

Questions regarding this solicitation shall be submitted via ProjNet by 2:00 PM CT on 16 November 2026. See MVR.02 in the solicitation for additional information. All solicitation documents are accessible via the link below titled PIEE Solicitation Module Link for W912EK27RA001. **11/23/26 - Amendment 0001: The purpose of this amendment is to update the plan sheets based on questions received, include the Past Performance Questionnaire template as Attachment J-2, and extend the due date for receipt of proposals from 30 November to 07 December 2026 at 2:00 PM CT.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy