- Opportunities
- Department of Energy
- RFP-383167-CD
Kautz Road Substation Construcion, Uip Subproject 2- Krs
Official title: KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
Open, 32 days left
- Deadline
- Dec 18, 4:00 PM CT
- Notice type
- Solicitation
- Set-aside
- None: open to all businesses
- Industry
- Power and Communication Line and Related Structures ConstructionNAICS 237130, Construction
- Place of performance
- Batavia, IL
- Buying office
- Fermilab - DOE ContractorOffice 899034, Department of Energy
- Solicitation number
- RFP-383167-CD
- Product or service code
- Z2MZ
- Posted
- Nov 5, 2026
- Source
- SAM.govVersion 1, last change seen Nov 16, 2026, 4:30 AM UTC
Notice text
November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Chris Daley, cdaley@fnal.gov, 6308404256
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 16, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Other open notices in power and communication line and related structures construction
| Notice | Set-aside | Place | Due |
|---|---|---|---|
| USFK C4I Communication Tower and Facility Maintenance CY27Department of the Army | Not stated | Not stated | Nov 18Due tomorrow |
| Electrical Upgrades to Support Future Three-Phase Power Supply Service at Lac qui Parle Dam near Watson, MNDepartment of the Army, sources sought | None | Watson, MN | Nov 193 days left |
| Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for InformationDepartment of the Air Force, sources sought | None | Kirtland AFB, NM | Nov 193 days left |
| 504-21-703 Training and Admin Support Space ConstructionDepartment of Veterans Affairs, presolicitation | SDVOSB | Amarillo, TX | Nov 215 days left |
| FCI Marion - Emergency Repair Tornado DamageFederal Prison System / Bureau of Prisons | Small business | Marion, IL | Dec 317 days left |
| DLA DWCF B1907 Backup Power Generator, Yokosuka, JapanDepartment of the Army, sources sought | Not stated | JPN | Dec 1125 days left |
| FTG247 Replace UPS at IDT1, Fort Greely, AlaskaDepartment of the Army, presolicitation | Small business | Fort Greely, AK | Dec 1226 days left |
| P210 Electric Power Plant and Electrical Distribution System at Chabelley Airfield, DjiboutiDepartment of the Navy, presolicitation | Not stated | DJI | Dec 1832 days left |
Get new notices from Department of Energy by email
Each morning we send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.