HVAC upgrades at VA Loch Raven building, Baltimore, MD

The VA wants a contractor to upgrade HVAC in Building 1 at the Loch Raven campus in Baltimore, Maryland, including exhaust fans, air handlers, a fan motor, a variable frequency drive and chiller heat tracing.

Official title: J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT

Deadline
Nov 30, 8:00 AM ET
5 days left
Who can bid
Not stated
The notice names no set-aside
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: 245-Network Contract Office 5 (36C245)

What they're buying

It is one lump-sum job over 90 calendar days, but the due date and contract length conflict across the documents.

Top catches

Due date conflicts across documents
“Response deadline: 2026-11-30T08:00:00-05:00” SAM.gov record

The SAM record says responses are due Monday, November 30, 2026 at 8:00 AM. The attached SF 1449 says quotes are due 12/14/2026 at 8am EST. Confirm the date with the contracting officer and plan for the earlier one.

Primary vendor needs HVAC experience
“The primary vendor must be at least a qualified hvac vendor per the soliciation requirments.” RFQ 36C24527Q0061 Questions.docx

A subcontractor's HVAC experience does not satisfy the experience factor. Your firm needs its own HVAC work in medical or food preparation settings at VA or other federal facilities, and the documents must be submitted with your quote.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 4 of 8 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Upgrade exhaust fans EF-1A and EF-1B and the AHU-B air handler in the attic of the 2nd floor B wing COVID ward, including higher CFM outputs.
  • Replace cooling coils, the fan motor and the VFD (ABB, in kind) on AHU-E in the kitchen basement attic. The new motor must sustain 60Hz.
  • Install heat tracing for the chiller water line, with wiring and a junction box in room G-15. Terminate to an emergency panel in G-17 with a 20-amp GFPE breaker. The panel is to be selected by the VA.
  • Coordinate BAS controls with the COR and Facility Maintenance. The existing BAS is under a Johnson Controls contract. Replace or add hardware as needed.
  • Test, adjust and balance by a certified TAB vendor after changes, with notice to the COR. Deliver the TAB report before closeout.
  • Provide a warranty letter, O&M manuals, training, and as-builts or shop drawings if the COR requires them. Clean up trash in all work areas, including the attic.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Due date conflicts across documents. The SAM record says responses are due Monday, November 30, 2026 at 8:00 AM. The attached SF 1449 says quotes are due 12/14/2026 at 8am EST. Confirm the date with the contracting officer and plan for the earlier one.
  • Primary vendor needs HVAC experience. A subcontractor's HVAC experience does not satisfy the experience factor. Your firm needs its own HVAC work in medical or food preparation settings at VA or other federal facilities, and the documents must be submitted with your quote.
  • Contract length conflicts. The notice says 90 calendar days, but the price schedule shows a one-year window from 12-07-2026 to 12-06-2027. The VA Q&A says 90 days governs. Price for 90 days and get this confirmed in writing.“The period of performance for the contract will be 90 days.” RFQ 36C24527Q0061 Questions.docx
  • Lump sum needs itemized prices. The price schedule is one lump-sum line with blank prices. The VA requires a breakdown of labor, materials and equipment with your proposal. Pay applications cannot exceed the PO balance, and unauthorized work will not be paid.“Yes. An itemized breakdown of labor, materials and equipment (if included) shall be included in submission of the proposal.” RFQ 36C24527Q0061 Questions.docx
  • Site visit date has passed. The site visit was set for 11/18/2026 at 9am, the same day the notice was posted, so it has passed. The notice does not say whether attendance was required. Ask the contracting officer in writing whether any visit is still available before you decide to bid.“Site Visit 11/18/2026 @ 9am meeting in lobby.” 36C24527Q0061.docx
  • Utility shutdowns need 14 days notice. Any shutdown of A/C, heating, power or other utilities needs a written request at least 14 days ahead. Build this lead time into your schedule, especially for the chiller heat tracing work.“Utility and HVAC shutdowns require at least a 14-day written request to the facility” Notice text

Key terms

Who can bidLikely small businesses onlyThe SAM record says set-aside Not stated, but the solicitation includes the total small business set-aside clause. Primary vendor must also have HVAC experience.36C24527Q0061.docx
Contract period90 calendar daysThe price schedule shows 12-07-2026 to 12-06-2027. The VA Q&A answer says 90 days applies.Notice text
How they chooseBest value quote after comparative evaluationPrice, technical capability and experience, and past performance are evaluated. This is not a lowest-price award.36C24527Q0061.docx
How to submitEmail to Keysha.Gorman74@va.govSend questions and quotes by email. No other method is stated.36C24527Q0061.docx
Questions dueMonday, November 30, 2026, 8:00 AM (time zone not stated)The solicitation gives 8am with no time zone.36C24527Q0061.docx
Contract typeFirm-fixed-price, one lump-sum itemItem 0001 is one job priced as a single lump sum. Invoices are monthly.36C24527Q0061.docx
Site visit11/18/2026 at 9am, meeting in lobby (already passed)The notice does not say whether attendance was required.36C24527Q0061.docx

How to respond

  1. Confirm the due date with Keysha Gorman at 410-637-1509 or by email, because the SAM record and the SF 1449 disagree.
  2. Email your quote and any questions to Keysha.Gorman74@va.gov before the deadline you confirm. Email is the only method the notice names.
  3. Price each deliverable separately and show labor, materials and equipment inside the lump-sum price.
  4. Include your own HVAC experience and references, 3 to 5 years, with your quote. Subcontractor experience does not count for this factor.
  5. Complete SF 1449 blocks 12, 17, 23, 24 and 30, the Section B.1 contractor point of contact, and the subcontracting questions in Section E.2.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated contract value. The $47 Million beside NAICS 561210 may be the size standard rather than the value.
  • Official set-aside status. The SAM record says Not stated, and the solicitation marks are unclear.
  • Which electrical panel the VA will select for the heat tracing, since panel selection is TBD.
  • Whether a chiller heat tracing sketch or as-built exists. A bidder asked, and the provided Q&A shows no VA answer.
  • Target fan airflow for EF-1A and EF-1B. A 2025 review cites 4,855 CFM on the contract fan schedule, while the TAB report lists a design total of 3,400 CFM.

Notice text

Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15.

Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic.

AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work.

Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment.

Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable.

Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment.

All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance.

A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications.

The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces.

Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles.

Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure.

Period of performance is 90 calendar days.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy