1. Opportunities
  2. Department of Defense
  3. Department of the Navy
  4. N0010427QZA18

MCM 1 propeller and stern tube shaft repairs

The Navy wants firm fixed price repairs of MCM 1 class propeller shafts and stern tube shafts under repair purchase orders.

Official title: MCM 1, PROP SHAFT

Deadline
Dec 3, 3:30 PM ET
8 days left
Who can bid
Not stated
The notice names no set-aside
Last time
$1.26M
Likely Ge Aviation Systems LLC
Place
Not stated
Buyer: NAVSUP Weapon Systems Support Mech

What they're buying

The requested turnaround is 330 days, and the response deadline is Thursday, December 3, 2026.

Top catches

Two shaft types in one notice
“The MCM 1, STERN SHAFT repaired under this contract/purchase order shall meet the operational and functional requirements” Notice text

The record title covers only the propeller shaft, but the notice text also covers a stern tube shaft with its own SOW and CAGE code. Ask the contracting officer which items are in scope and price each one separately.

Statements of work not attached
“This document is required to perform the necessary requirements.” Notice text

Neither statement of work is attached to this notice, and the notice says you need them to perform. Request SOW 013124162 and SOW 013124383 from the NAVSUP WSS Contracting Officer before you price the repair.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 20, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Repair the MCM 1 propeller shaft (CAGE 07309, ref. no. 106051001-11) under SOW 013124162, including drawings and technical publications named in the notice.
  • Repair the MCM 1 stern tube shaft (CAGE 53711, ref. no. 106051001-12) under SOW 013124383. Quantities are not stated.
  • Submit a pre-repair inspection report within 120 days of receiving the asset, with liquid penetrant inspection results.
  • Submit a final repair report within 14 days of completing all repairs, with a hard copy shipped with the asset.
  • Provide a quality system plan meeting ASQ-9002 and inspection and test procedures for gauges and fixtures, with a draft due within 60 days of award.
  • Mark items under MIL-STD-130 and package under MIL-STD 2073. Send a monthly status report in Excel by the fifth working day.

Who supplied it lately

$1.26M

on a recent contract for the same kind of product: Ge Aviation Systems LLC. It ends Nov 27, 2026.

Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.

What to watch for

  • Two shaft types in one notice. The record title covers only the propeller shaft, but the notice text also covers a stern tube shaft with its own SOW and CAGE code. Ask the contracting officer which items are in scope and price each one separately.
  • Statements of work not attached. Neither statement of work is attached to this notice, and the notice says you need them to perform. Request SOW 013124162 and SOW 013124383 from the NAVSUP WSS Contracting Officer before you price the repair.
  • CMMC level not stated. The notice includes a cybersecurity maturity model certification clause, but the text does not give the required level. Ask the contracting officer which level applies before you bid, since you may need a certification you do not hold.“NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS” Notice text
  • DO-rated order and written acceptance. Any award will be a DO-rated order under DPAS, and the award is bilateral. Check that you are willing to take a rated order and be ready to sign a written acceptance before work starts.“requiring the contractor's written acceptance prior to execution” Notice text
  • 330-day turnaround requested. The notice asks for a 330-day turnaround, but the text does not say whether it is a hard deadline. Build your repair schedule and price against it, and ask what the requirement means.“Requested RTAT: 330 days” Notice text
  • One-year warranty included. The notice includes a warranty of one year from date of delivery. Include the cost of warranty work in your firm fixed price.“one year from date of delivery” Notice text

Key terms

Contract period330 days requested (RTAT)The notice gives only a requested figure and does not define RTAT or a delivery date.Notice text
Contract typeFirm fixed price repair purchase ordersRepair purchase orders priced as a firm fixed price for the full repair effort.Notice text

How to respond

  1. Request SOW 013124162 and SOW 013124383 from the NAVSUP WSS Contracting Officer, since neither is attached to this notice.
  2. Send questions to kathryn.e.skutlin.civ@us.navy.mil, the contact listed in the notice. The notice does not give a question deadline.
  3. Price the full repair as one firm fixed price for each shaft item, and confirm you can meet the requested 330-day turnaround.
  4. Submit your offer by Thursday, December 3, 2026, 16:30 (-04:00). The notice does not state the submission method, so confirm it with the contact.
  5. Before you sign, check the DO-rated order and bilateral written acceptance terms.

Not stated in what we read

  • Where the repair work is done and where the shafts should be shipped.
  • Whether a set-aside applies and which size standard applies.
  • Which CMMC level is required.
  • The estimated value or budget for the repairs.
  • How and where to submit an offer, and any deadline for questions.
  • The contents of the two statements of work, which are not attached, and the quantity of shafts.

Notice text

CONTACT INFORMATION|4|N742.9|HRZ|N/A|kathryn.e.skutlin.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO 9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; Combo Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|TBD|See schedule|TBD|N/A|N/A|N/A|See DD1423|N/A|N/A|See DD1423|Contact the WAWF helpdesk at 866-618- 5988 if assistance is needed| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|TBD| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| PROGRESS PAYMENTS (DEVIATION 2026-O0022)(FEB 2026)|4||||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.

THIS SOLICITATION IS BEING ISSUED UNDER EMERGENCY ACQUISITION FLEXIBILITIES. 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 4. All contractual documents (i.e. contracts, purchase orders, and modific ation(s)) related to the instant procurement are considered to be 'issued' by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce method such as email.

The Government's acceptance of the contractor's proposal constitutes bilateral agreement to 'issue' contractual documents as detailed herein. 5.If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on the SAM.gov website.

After requesting access, send an email to the POC listed on the solicitation. 7. Please provide repair price as Firm Fixed Price for the full repair effort of the requirement. Requested RTAT: 330 days 1. SCOPE 1.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work).; 2. APPLICABLE DOCUMENTS 2.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work).; 3. REQUIREMENTS 3.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work), associated drawings, technical publications, document references, and DD Form 1423 CDRL's.; 3.2 Cage Code/Reference Number Items - The MCM 1, PROP SHAFT repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below.

All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;07309 106051001-11; 3.3 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; .

4. QUALITY ASSURANCE 4.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work). ; 5. PACKAGING 5.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work). ; MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work). ; 6.2 ;This repair requirement has an External Statement Of Work PDF document (013124162 SOW).

This document is required to perform the necessary requirements. This document should be attached to solicitations/ awards. If this document does not attach to the solicitation/award, sources must contact NAVSUP WSS Contracting Officer to obtain a copy.; For repair requirement: This repair requirement has an External Statement Of Work PDF document. This document is required to perform the necessary repairs. This document should be attached to solicitations/awards.

If this document does not attach to the solicitation/award, repair sources must contact NAVSUP WSS Contracting Officer. \ DATE OF FIRST SUBMISSION=030 DAC BLOCK 4: IN LIEU OF THE PREPARATION REQUIREMENTS SPECIFIED IN DI-MGMT-80227, UTILIZE THE FOLLOWING FORMAT. THE REPORT SHALL BE PROVIDED ELECTRONICALLY IN MICROSOFT EXCEL, 2010 VERSION. PLEASE REFERENCE THE MONTHLY SHAFTING REPORT TEMPLATE FORMAT AND INSTRUCTIONS. THE STATUS REPORT SHALL BE SUBMITTED ELECTRONICALLY VIA ELECTRONIC MAIL ON A MONTHLY BASIS.

THE REPORT SHALL CONTAIN STATUS BASED ON THE FIRST WORKING DAY OF THE MONTH REPORTED. ITEMS SHIPPED SHALL REMAIN ON THE REPORT FOR ONE ADDITIONAL MONTH AND THEN DELETED. BLOCK 10: STATUS REPORT SHALL BE SUBMITTED MONTHLY BY THE FIFTH WORKING DAY OF EACH MONTH BY ELECTRONIC MAIL. BLOCK 12: THE FIRST SUBMISSION SHALL BE WITHIN 30 DAYS OF CONTRACT AWARD. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE SUBMITTED MONTHLY BY THE FIFTH WORKING DAY OF EACH MONTH.

BLOCK 14: DISTRIBUTION SHALL BE MADE BY ELECTRONIC MAIL. ADDRESSES FOR REPORT DISTRIBUTION SHALL BE OBTAINED FROM THE CONTRACTING OFFICER. DATE OF FIRST SUBMISSION=060 DAC BLOCK 4: PLAN SHALL INCLUDE THE CONTRACTOR'S QUALITY SYSTEM PROCEDURES THAT MEET THE REQUIREMENTS OF ASQ-9002. ADDITIONALLY THE CONTRACTOR SHALL SUBMIT INSPECTION AND TEST PROCEDURES FOR THE INSPECTION AND TESTING OF PROPULSION SHAFT PLUG OR RING GAGES, OTHER INSPECTION FIXTURES OR TOOLS, JIGS AND OTHER SHAFT RELATED ITEMS IN ACCORDANCE WITH CONTRACT REQUIREMENTS.

BLOCK 8: APPROVAL WILL BE BASED ON COMPLIANCE WITH CONTRACT SPECIFICATIONS. GOVERNMENT REQUIRES 45 DAYS REVIEW TIME. BLOCK 12: DRAFT COPY SHALL BE SUBMITTED FOR GOVERNMENT REVIEW NO LATER THAN60 DAYS AFTER CONTRACT AWARD. FINAL APPROVALCOPY INCORPORATING ANY GOVERNMENT REVIEW COMMENTS SHALL BE SUBMITTED 30 DAYS AFTER RECEIPT OF GOVERNMENT REVIEW COMMENTS. BLOCK 13: SUBSEQUENT SUBMISSION TO BE SUBMITTED WITHIN 30 DAYS UPON DEVELOPMENT OR REVISION OF THE QUALITY SYSTEM MANUAL OR INSPECTION AND TEST PROCEDURES OR AFTER NOTIFICATION BY THE GOVERNMENT THAT A NEED FOR A REVISION IS REQUIRED.

THE CONTRACTOR SHALL PROVIDE DOCUMENTATION IN ADOBE ACROBAT, VERSION 7.0 OR LATER. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: S4306A DATE OF FIRST SUBMISSION=060 DAC BLOCK 4: SUBMIT COPIES OF ALL APPROVED WELDING PROCEDURE QUALIFICIATION TEST REPORTS OR ASSOCIATED APPROVAL LETTERS, AND APPLICABLE QUALIFIED WELDING ROCEDURES NECESSARY TO PERFORM PRODUCTION WELDING. BLOCK 8: APPROVAL WILL BE BASED ON COMPLIANCE WITH CONTRACT SPECIFICATIONS.

GOVERNMENT REQUIRES 45 DAYS REVIEW TIME. BLOCK 12: DRAFT COPY SHALL BE SUBMITTED FOR GOVERNMENT REVIEW NO LATER THAN60 DAYS AFTER BOA AWARD. FINAL APPROVAL COPY INCORPORATING ANY GOVERNMENT REVIEW COMMENTS SHALL BE SUBMITTED 30 DAYS AFTER RECEIPT OF GOVERNMENTREVIEW COMMENTS. BLOCK 13: SUBSEQUENT SUBMISSION TO BE SUBMITTED WITHIN 30 DAYS UPON DEVELOPMENT OR REVISION OF THE QUALITY SYSTEM MANUAL OR NSPECTION AND TEST PROCEDURES OR AFTER NOTIFICATION BY THE GOVERNMENT THAT A NEED FOR A REVISION IS REQUIRED.

THE CONTRACTOR SHALL PROVIDE DOCUMENTATION IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: S4306A DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THIS DATA ITEM SHALL BE SUBMITTED FOR ALL ANTICIPATED UNREPAIRABLE AND OR OUT OF TOLERANCE CONDITIONS. FORMAT AND CONTENT SHALL BE IN ACCORDANCE WITH MIL-STD-973, APPENDIX "E", SHORT FORM IN LIEU OF DI-CMAN-80641B.

THE CONTRACTOR SHALL UTILIZE DD FORM 1694 FOR SUBMISSION OF ALL REQUESTS. DEPARTURES (WAIVERS AND DEVIATIONS) SHALL BE SUBMITTED FOR PRE-EXISTING CONDITIONS AND DEPARTURE FROM SPECFICATION GENERATED OR FOUND AFTER THE COMMENCEMENT OF WORK. BLOCK 8: APPROVAL WILL BE BASED UPON IMPACT ON OPERATIONAL PERFORMANCE AND INTEGRITY. GOVERNMENT REQUIRES 30 DAYS REVIEW TIME. ALL DEVIATIONS SHALL BE FORWARDED TO NSWCPD 427 FOR APPROVAL VIA THE DCMA QUALITY ASSURANCE REPRESENTATIVE (QAR) FOR REVIEW OF CLASSIFICATION OF THE DEVIATION.

BLOCK 10: SUBMISSION REQUIRED WHENEVER A DEPARTURE FROM SPECIFICATION HAS OCCURRED OR IS ANTICIPATED. THE CONTRACTOR SHALL PROVIDE A COPY OF THE DEPARTURE IN ADOBE ACROBAT, VERSION 7.0 OR LATER. BLOCKS 12 AND 13: NO LATER THAN 15 DAYS AFTER THE NEED FOR WAIVER IS IDENTIFIED CONTRACTOR SHALL NOT ESTIMATE PREPARATION PRICE ON DD FORM 1423-1 BLOCKS 17 AND 18. SUPPORTING DATA SUCH AS DRAWINGS, SKETCHES, PHOTOGRAPHS, CALCULATIONS, FINANCIAL ANALYSIS OR OTHER ATTACHMENTS THAT CLARIFY THE REQUEST FOR WAIVER SHALL BE INCLUDED.

DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ BLOCK 4. USE THE FOLLOWING REQUIREMENT IN LIEU OF THE SPECIFIED DATA ITEM DESCRIPTION. PRESERVATION, PACKAGING, PACKING, MARKING AND TRANSPORTATION DEFICIENCIES OF ALL GOVERNMENT FURNISHED MATERIAL SHALL BE DOCUMENTED ON A SF 364 AND SUBMITTED AND IN ACCORDANCE WITH SECNAVINST 4355.18A. THE COGNIZANT GOVERNMENT QUALITY ASSURANCE REPRESENTATIVE (QAR) SHALL VERIFY THE ACCURACY AND ADEQUACY OF THE REPORT.

A COPY OF THE APPROPRIATE VISUAL PRESERVATION INSPECTION (VPI) REPORT AND PHOTOGRAPHS, WHERE APPROPRIATE, SHALL BE ATTACHED TO THE SF 364. FOR PROPULSION SHAFT PLUG AND RING GAGES, A VISUAL PRESERVATION INSPECTION REPORT, FORM 9243/2 SHALL BE COMPLETED. FOR PROPULSION SHAFTS, A VISUAL PRESERVATION INSPECTION REPORT, FORM 9243/5 SHALL BE COMPLETED. FOR OTHER GOVERNMENT FURNISHED MATERIAL, THE REPORT SHALL BE IN THE CONTRACTOR'S FORMAT. BLOCK 12: INTIAL VISUAL PRESERVATION INSPECTION REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF RECEIPT OF THE ASSET.

BLOCK 13: FINAL VISUAL PRESERVATION INSPECTION REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF COMPLETION OF FINAL PACKAGING PRIOR TO FINAL DELIVERY. A HARD COPY OF THE FINAL VPI REPORT SHALL BE SHIPPED WITH THE ASSET FOR FINAL DELIVERY. BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 10 DAYS FOR GOVERNMENT REVIEW AND ACCEPTANCE. THE CONTRACTOR SHALL SUBMIT A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THE FOLLOWING REQUIREMENTS SHALL BE FOLLOWED IN LIEU OF THE SPECIFIED DATA ITEM.

FOR PROPULSION SHAFTS, REPORT FORMAT AND CONTENT SHALL COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE TECHNICAL REPAIR STANDARD, NAVSEA S9243-AW-TRS-011/SHAFT AND THE TECHNICAL DATA PACKAGE. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL OF NSWCPD 427. ADDITIONAL INFORMATION AND PHOTOGRAPHS SHALL BE PROVIDED IF REQUIRED. A WRITTEN DESCRIPTION IN THE CONTRACTOR'S FORMAT OF RECOMENDED REPAIRS AND OR TEMS NOT ANTICIPATED TO BE REPAIRED WITH APPROPRIATE JUSTIFICATION SHALL BE INCLUDED WITH THE PRE-REPAIR INSPECTION REPORT.

THE CONTRACTOR SHALL SUBMIT ALL LIQUID PENETRANT (PT) INSPECTION REPORT/RESULTS DOCUMENTATION ACCOMPLISHED ACCORDINGLY. BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 45 DAYS FORGOVERNMENT REVIEW AND APPROVAL. BLOCK 12: PRE-REPAIR INSPECTION REPORT SHALL BE SUBMITTED WITHIN 120 DAYS OF RECEIPT OF THE ASSET. DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THE FOLLOWING REQUIREMENTS SHALL BE FOLLOWED IN LIEU OF THE SPECIFIED DATA ITEM.

FOR PROPULSION SHAFTS, REPORT FORMAT AND CONTENT SHALL COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE TECHNICAL REPAIR STANDARD, NAVSEA S9243-AW-TRS-011/SHAFT AND THE TECHNICAL DATA PACKAGE. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL OF NSWCPD 427. ADDITIONAL INFORMATION AND PHOTOGRAPHS SHALL BEPROVIDED IF REQUIRED. THE CONTRACTOR SHALL SUBMIT ALL LIQUID PENETRANT (PT) INSPECTION REPORT/RESULTS DOCUMENTATION ACCOMPLISHED ACCORDINGLY.

BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 45 DAYS FOR GOVERNMENT REVIEW AND APPROVAL. A HARD COPY OF THE FINAL REPAIR REPORT SHALL BE SHIPPED WITH THE ASSET FOR FINAL DELIVERY. BLOCK 12: THE FINAL REPAIR REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF COMPLETION OF ALL REPAIRS. THE CONTRACTOR SHALL PROVIDE A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: N64498 DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: DI-MISC-80678 IS TAILORED AS FOLLOWS: FOR PROPULSION SHAFTS, A CERTIFICATION DOCUMENT IN ACCORDANCE WITH NAVSEA S9243-AW-TRS-011/SHAFT SHALL BE COMPLETED AFTER THE APPROVAL OF THE FINAL INSPECTION REPORT.

REPORT FORMAT SHALL BE AS PROVIDED FOR ON THE INSPECTION FORMS. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL FROM NSWCPD 427. FOR OTHER GOVERNMENT FURNISHED EQUIPMENT, THE REPORT SHALL BE IN THE CONTRACTOR'S FORMAT. CERTIFICATION DOCUMENTS SHALL BE SIGNED BY THE COGNIZANT DCMA QUALITY ASSURANCE REPRESENTATIVE (QAR). BLOCK 12: SUBMISSION SHALL BE MADE NO LATER THAN 5 DAYS AFTER SIGNATURE OF THE DCMA QAR. A HARD COPY OF THE CERTIFICATION DATA REPORT SHALL BE PACKAGED WITH THE ASSET FOR FINAL DELIVERY.

IN ADDITION TO HARD COPY FORMAT, THE CONTRACTOR SHALL PROVIDE A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: N64498 1. SCOPE 1.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work).; 2. APPLICABLE DOCUMENTS 2.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work). ; 3.

REQUIREMENTS 3.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work), associated drawings, technical publications, document references, and DD 1423 CDRL's.; 3.2 Cage Code/Reference Number Items - The MCM 1, STERN SHAFT repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.

CAGE___Ref. No. ;53711 106051001-12; 3.3 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 4. QUALITY ASSURANCE 4.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work). ; 5. PACKAGING 5.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work). ; MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6.

NOTES 6.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work). ; 6.2 ;This repair requirement has an External Statement Of Work PDF document (013124383 SOW). This document is required to perform the necessary requirements. This document should be attached to solicitations/ awards. If this document does not attach to the solicitation/award, sources must contact NAVSUP WSS Contracting Officer to obtain a copy.; For repair requirement: This repair requirement has an External Statement Of Work PDF document.

This document is required to perform the necessary repairs. This document should be attached to solicitations/awards. If this document does not attach to the solicitation/award, repair sources must contact NAVSUP WSS Contracting Officer. \ DATE OF FIRST SUBMISSION=030 DAC BLOCK 4: IN LIEU OF THE PREPARATION REQUIREMENTS SPECIFIED IN DI-MGMT-80227, UTILIZE THE FOLLOWING FORMAT. THE REPORT SHALL BE PROVIDED ELECTRONICALLY IN MICROSOFT EXCEL, 2010 VERSION.

PLEASE REFERENCE THE MONTHLY SHAFTING REPORT TEMPLATE FORMAT AND INSTRUCTIONS. THE STATUS REPORT SHALL BE SUBMITTED ELECTRONICALLY VIA ELECTRONIC MAIL ON A MONTHLY BASIS. THE REPORT SHALL CONTAIN STATUS BASED ON THE FIRST WORKING DAY OF THE MONTH REPORTED. ITEMS SHIPPED SHALL REMAIN ON THE REPORT FOR ONE ADDITIONAL MONTH AND THEN DELETED. BLOCK 10: STATUS REPORT SHALL BE SUBMITTED MONTHLY BY THE FIFTH WORKING DAY OF EACH MONTH BY ELECTRONIC MAIL.

BLOCK 12: THE FIRST SUBMISSION SHALL BE WITHIN 30 DAYS OF CONTRACT AWARD. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE SUBMITTED MONTHLY BY THE FIFTH WORKING DAY OF EACH MONTH. BLOCK 14: DISTRIBUTION SHALL BE MADE BY ELECTRONIC MAIL. ADDRESSES FOR REPORT DISTRIBUTION SHALL BE OBTAINED FROM THE CONTRACTING OFFICER. DATE OF FIRST SUBMISSION=060 DAC BLOCK 4: PLAN SHALL INCLUDE THE CONTRACTOR'S QUALITY SYSTEM PROCEDURES THAT MEET THE REQUIREMENTS OF ASQ-9002.

ADDITIONALLY THE CONTRACTOR SHALL SUBMIT INSPECTION AND TEST PROCEDURES FOR THE INSPECTION AND TESTING OF PROPULSION SHAFT PLUG OR RING GAGES, OTHER INSPECTION FIXTURES OR TOOLS, JIGS AND OTHER SHAFT RELATED ITEMS IN ACCORDANCE WITH CONTRACT REQUIREMENTS. BLOCK 8: APPROVAL WILL BE BASED ON COMPLIANCE WITH CONTRACT SPECIFICATIONS. GOVERNMENT REQUIRES 45 DAYS REVIEW TIME. BLOCK 12: DRAFT COPY SHALL BE SUBMITTED FOR GOVERNMENT REVIEW NO LATER THAN60 DAYS AFTER CONTRACT AWARD.

FINAL APPROVALCOPY INCORPORATING ANY GOVERNMENT REVIEW COMMENTS SHALL BE SUBMITTED 30 DAYS AFTER RECEIPT OF GOVERNMENT REVIEW COMMENTS. BLOCK 13: SUBSEQUENT SUBMISSION TO BE SUBMITTED WITHIN 30 DAYS UPON DEVELOPMENT OR REVISION OF THE QUALITY SYSTEM MANUAL OR INSPECTION AND TEST PROCEDURES OR AFTER NOTIFICATION BY THE GOVERNMENT THAT A NEED FOR A REVISION IS REQUIRED. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION IN ADOBE ACROBAT, VERSION 7.0 OR LATER.

DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: S4306A DATE OF FIRST SUBMISSION=060 DAC BLOCK 4: SUBMIT COPIES OF ALL APPROVED WELDING PROCEDURE QUALIFICIATION TEST REPORTS OR ASSOCIATED APPROVAL LETTERS, AND APPLICABLE QUALIFIED WELDING ROCEDURES NECESSARY TO PERFORM PRODUCTION WELDING. BLOCK 8: APPROVAL WILL BE BASED ON COMPLIANCE WITH CONTRACT SPECIFICATIONS. GOVERNMENT REQUIRES 45 DAYS REVIEW TIME.

BLOCK 12: DRAFT COPY SHALL BE SUBMITTED FOR GOVERNMENT REVIEW NO LATER THAN60 DAYS AFTER BOA AWARD. FINAL APPROVAL COPY INCORPORATING ANY GOVERNMENT REVIEW COMMENTS SHALL BE SUBMITTED 30 DAYS AFTER RECEIPT OF GOVERNMENTREVIEW COMMENTS. BLOCK 13: SUBSEQUENT SUBMISSION TO BE SUBMITTED WITHIN 30 DAYS UPON DEVELOPMENT OR REVISION OF THE QUALITY SYSTEM MANUAL OR NSPECTION AND TEST PROCEDURES OR AFTER NOTIFICATION BY THE GOVERNMENT THAT A NEED FOR A REVISION IS REQUIRED.

THE CONTRACTOR SHALL PROVIDE DOCUMENTATION IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: S4306A DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THIS DATA ITEM SHALL BE SUBMITTED FOR ALL ANTICIPATED UNREPAIRABLE AND OR OUT OF TOLERANCE CONDITIONS. FORMAT AND CONTENT SHALL BE IN ACCORDANCE WITH MIL-STD-973, APPENDIX "E", SHORT FORM IN LIEU OF DI-CMAN-80641B.

THE CONTRACTOR SHALL UTILIZE DD FORM 1694 FOR SUBMISSION OF ALL REQUESTS. DEPARTURES (WAIVERS AND DEVIATIONS) SHALL BE SUBMITTED FOR PRE-EXISTING CONDITIONS AND DEPARTURE FROM SPECFICATION GENERATED OR FOUND AFTER THE COMMENCEMENT OF WORK. BLOCK 8: APPROVAL WILL BE BASED UPON IMPACT ON OPERATIONAL PERFORMANCE AND INTEGRITY. GOVERNMENT REQUIRES 30 DAYS REVIEW TIME. ALL DEVIATIONS SHALL BE FORWARDED TO NSWCPD 427 FOR APPROVAL VIA THE DCMA QUALITY ASSURANCE REPRESENTATIVE (QAR) FOR REVIEW OF CLASSIFICATION OF THE DEVIATION.

BLOCK 10: SUBMISSION REQUIRED WHENEVER A DEPARTURE FROM SPECIFICATION HAS OCCURRED OR IS ANTICIPATED. THE CONTRACTOR SHALL PROVIDE A COPY OF THE DEPARTURE IN ADOBE ACROBAT, VERSION 7.0 OR LATER. BLOCKS 12 AND 13: NO LATER THAN 15 DAYS AFTER THE NEED FOR WAIVER IS IDENTIFIED CONTRACTOR SHALL NOT ESTIMATE PREPARATION PRICE ON DD FORM 1423-1 BLOCKS 17 AND 18. SUPPORTING DATA SUCH AS DRAWINGS, SKETCHES, PHOTOGRAPHS, CALCULATIONS, FINANCIAL ANALYSIS OR OTHER ATTACHMENTS THAT CLARIFY THE REQUEST FOR WAIVER SHALL BE INCLUDED.

DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ BLOCK 4. USE THE FOLLOWING REQUIREMENT IN LIEU OF THE SPECIFIED DATA ITEM DESCRIPTION. PRESERVATION, PACKAGING, PACKING, MARKING AND TRANSPORTATION DEFICIENCIES OF ALL GOVERNMENT FURNISHED MATERIAL SHALL BE DOCUMENTED ON A SF 364 AND SUBMITTED AND IN ACCORDANCE WITH SECNAVINST 4355.18A. THE COGNIZANT GOVERNMENT QUALITY ASSURANCE REPRESENTATIVE (QAR) SHALL VERIFY THE ACCURACY AND ADEQUACY OF THE REPORT.

A COPY OF THE APPROPRIATE VISUAL PRESERVATION INSPECTION (VPI) REPORT AND PHOTOGRAPHS, WHERE APPROPRIATE, SHALL BE ATTACHED TO THE SF 364. FOR PROPULSION SHAFT PLUG AND RING GAGES, A VISUAL PRESERVATION INSPECTION REPORT, FORM 9243/2 SHALL BE COMPLETED. FOR PROPULSION SHAFTS, A VISUAL PRESERVATION INSPECTION REPORT, FORM 9243/5 SHALL BE COMPLETED. FOR OTHER GOVERNMENT FURNISHED MATERIAL, THE REPORT SHALL BE IN THE CONTRACTOR'S FORMAT. BLOCK 12: INTIAL VISUAL PRESERVATION INSPECTION REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF RECEIPT OF THE ASSET.

BLOCK 13: FINAL VISUAL PRESERVATION INSPECTION REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF COMPLETION OF FINAL PACKAGING PRIOR TO FINAL DELIVERY. A HARD COPY OF THE FINAL VPI REPORT SHALL BE SHIPPED WITH THE ASSET FOR FINAL DELIVERY. BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 10 DAYS FOR GOVERNMENT REVIEW AND ACCEPTANCE. THE CONTRACTOR SHALL SUBMIT A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THE FOLLOWING REQUIREMENTS SHALL BE FOLLOWED IN LIEU OF THE SPECIFIED DATA ITEM.

FOR PROPULSION SHAFTS, REPORT FORMAT AND CONTENT SHALL COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE TECHNICAL REPAIR STANDARD, NAVSEA S9243-AW-TRS-011/SHAFT AND THE TECHNICAL DATA PACKAGE. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL OF NSWCPD 427. ADDITIONAL INFORMATION AND PHOTOGRAPHS SHALL BE PROVIDED IF REQUIRED. A WRITTEN DESCRIPTION IN THE CONTRACTOR'S FORMAT OF RECOMENDED REPAIRS AND OR TEMS NOT ANTICIPATED TO BE REPAIRED WITH APPROPRIATE JUSTIFICATION SHALL BE INCLUDED WITH THE PRE-REPAIR INSPECTION REPORT.

THE CONTRACTOR SHALL SUBMIT ALL LIQUID PENETRANT (PT) INSPECTION REPORT/RESULTS DOCUMENTATION ACCOMPLISHED ACCORDINGLY. BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 45 DAYS FORGOVERNMENT REVIEW AND APPROVAL. BLOCK 12: PRE-REPAIR INSPECTION REPORT SHALL BE SUBMITTED WITHIN 120 DAYS OF RECEIPT OF THE ASSET. DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THE FOLLOWING REQUIREMENTS SHALL BE FOLLOWED IN LIEU OF THE SPECIFIED DATA ITEM.

FOR PROPULSION SHAFTS, REPORT FORMAT AND CONTENT SHALL COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE TECHNICAL REPAIR STANDARD, NAVSEA S9243-AW-TRS-011/SHAFT AND THE TECHNICAL DATA PACKAGE. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL OF NSWCPD 427. ADDITIONAL INFORMATION AND PHOTOGRAPHS SHALL BEPROVIDED IF REQUIRED. THE CONTRACTOR SHALL SUBMIT ALL LIQUID PENETRANT (PT) INSPECTION REPORT/RESULTS DOCUMENTATION ACCOMPLISHED ACCORDINGLY.

BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 45 DAYS FOR GOVERNMENT REVIEW AND APPROVAL. A HARD COPY OF THE FINAL REPAIR REPORT SHALL BE SHIPPED WITH THE ASSET FOR FINAL DELIVERY. BLOCK 12: THE FINAL REPAIR REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF COMPLETION OF ALL REPAIRS. THE CONTRACTOR SHALL PROVIDE A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: N64498 DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: DI-MISC-80678 IS TAILORED AS FOLLOWS: FOR PROPULSION SHAFTS, A CERTIFICATION DOCUMENT IN ACCORDANCE WITH NAVSEA S9243-AW-TRS-011/SHAFT SHALL BE COMPLETED AFTER THE APPROVAL OF THE FINAL INSPECTION REPORT.

REPORT FORMAT SHALL BE AS PROVIDED FOR ON THE INSPECTION FORMS. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL FROM NSWCPD 427. FOR OTHER GOVERNMENT FURNISHED EQUIPMENT, THE REPORT SHALL BE IN THE CONTRACTOR'S FORMAT. CERTIFICATION DOCUMENTS SHALL BE SIGNED BY THE COGNIZANT DCMA QUALITY ASSURANCE REPRESENTATIVE (QAR). BLOCK 12: SUBMISSION SHALL BE MADE NO LATER THAN 5 DAYS AFTER SIGNATURE OF THE DCMA QAR. A HARD COPY OF THE CERTIFICATION DATA REPORT SHALL BE PACKAGED WITH THE ASSET FOR FINAL DELIVERY.

IN ADDITION TO HARD COPY FORMAT, THE CONTRACTOR SHALL PROVIDE A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: N64498

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who has supplied this lately

Contracts at Department of the Navy for the same kind of product (NAICS 336612, product code 2010) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.

ContractObligatedEndsState
Blade, Propeller, ShiGe Aviation Systems LLC · N0010422CJA21$1,258,416Nov 27, 2026within a monthVA
Seal Ring AssemblyDefense Maritime Solutions, Inc. · N0010424FZL04$921,512Jan 4, 2027in 1 monthVA
VA Class Propulsor Rotor RepairDefense Maritime Solutions, Inc. · N0010425PF005$639,351Jan 31, 2027in 2 monthsVA
Bearing and Shaft aDutch Valley Supply Co. · N0010426PYB16$877,426Sep 8, 2026endedFL
Shoe Set, ClockwiseKingsbury Inc. · N0010425PJC66$267,600Sep 8, 2026endedPA

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 20, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Navy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy