1. Opportunities
  2. Department of the Treasury
  3. Bureau of Engraving and Printing
  4. 2031ZA27B00001

Replace air pollution oxidizer at Fort Worth, TX

The Bureau of Engraving and Printing wants a design/build replacement of its Regenerative Thermal Oxidizer, an air pollution control unit, and the exhaust ventilation system that feeds it at the Western Currency Facility in Fort Worth, Texas.

Official title: Modernize Regenerative Thermal Oxidizer (RTO)

Deadline
Nov 25, 4:00 PM ET
4 days left
Who can respond
Any business
Market research, not a bid
Last time
None found
No contract like it at this agency in USAspending.gov
Place
TX - Texas, TX
Buyer: Office of the Chief Procurement Officer

What they're buying

This is a sources sought notice, and the contract length and estimated value are not stated.

Top catches

Sources sought, not a bid
“SEEKING SOURCES ONLY” Notice text

This notice asks for market research only, so no contract is offered yet. If you want to be considered, send a capability response by the deadline and expect a separate solicitation later.

Short window, holiday week
“2026-11-25T16:00:00-05:00” SAM.gov record

You have about six days from posting on November 18 to respond. The deadline falls the day before Thanksgiving Day, so plan to send your response early.

2 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Replace the existing RTO with a new unit that has a modern control panel, safe PLCs, and lower working voltage.
  • Replace the exhaust ventilation system, including properly sized roof fans and clean ducting where needed.
  • Design the system so process flow can shift between the existing RTO and the new RTO if one shuts down.
  • Increase VOC capture efficiency so the RTO can run on less supplemental natural gas.
  • Meter natural gas use of the new RTO and connect it to the BEP SCADA system.
  • Add features that reduce ink and oil entering the exhaust system and damaging ducting and fans.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Sources sought, not a bid. This notice asks for market research only, so no contract is offered yet. If you want to be considered, send a capability response by the deadline and expect a separate solicitation later.
  • Short window, holiday week. You have about six days from posting on November 18 to respond. The deadline falls the day before Thanksgiving Day, so plan to send your response early.
  • Eligibility and set-aside unclear. The record does not say whether this work is set aside for small businesses. Check your size status for this NAICS code and ask the contracting office before you assume you may respond.“Set-aside: Not stated” SAM.gov record
  • Work must tie into live plant systems. The new equipment must connect to the existing RTO and the BEP SCADA system while production continues. Ask whether site access or a site visit is offered before you estimate the work.“Natural gas usage of the new RTO shall be metered and integrated into the BEP Supervisory Control And Data Acquisition (SCADA) system.” Notice text

Key terms

Contract typeDesign/buildThe notice describes the project as design/build.Notice text

How to respond

  1. Describe your capability for design/build work on a regenerative thermal oxidizer and exhaust ventilation at an operating plant.
  2. Send the response by Wednesday, November 25, 2026, 16:00 (UTC-05:00). The method is Not stated, so check the notice on SAM.gov for a contact.
  3. Format, page limits, required forms, and any size or registration details are Not stated. Ask the contracting office if you need them.

Not stated in what we read

  • Estimated value or budget.
  • Contract length or period of performance.
  • Whether the work is set aside for small businesses, and the applicable size standard.
  • Where and how to send a response, and who to contact.
  • Whether a site visit or pre-bid meeting is offered.
  • Whether a solicitation will follow, and when.

Notice text

SEEKING SOURCES ONLY - The Bureau of Engraving and Printing (BEP) Western Currency Facility (WCF) is located at 9000 Blue Mound Road, Fort Worth, TX, 76131. Construction began on the WCF in 1987 and was completed in 1989. The Modernized Regenerative Thermal Oxidizer (RTO) is an air pollution control device that is required by the NSR (New Source Review) Air Permit issued by the TCEQ (Texas Commission on Environmental Quality) to treat Volatile Organic Compounds (VOC) emissions from Plate Printing presses (14), Offset presses (4), and Rotary Screen presses (4). The existing RTO was commissioned in 2010 to control VOC emissions from Plate Printing. In 2021, the Offset presses were added to the RTO system. The existing conveyance system, which currently includes ducting from each press to the roof, nine (9) roof fans, and a 48" main duct on the roof, has been in place since the facility was built in the early 90s. The system has been cobbled together as presses were added in Plate Printing, which originally only housed four (4) presses, without consideration for the wholistic efficiency of the system. It is a requirement of the Clean Air Act, EPA regulations, and the WCF air permits, that an air pollution control device associated with a "facility" (equipment or area that is emitting air pollutants as defined by EPA) must be maintained in good condition and operated properly while the attached "facilities" operate. This design/build project shall replace the RTO and the associated exhaust ventilation system: a new RTO with a modern control panel including safe PLCs and lower working voltage, a properly designed exhaust ventilation system that self-optimizes with feedback from modern performance-monitoring systems, properly sized roof fans, accessibility to clean ducting where needed, and increased voe capture efficiency to better exhaust printing areas while allowing the RTO to operate using less supplemental fuel. The new system shall also incorporate features to decrease the amount of ink and oils that get conveyed into the exhaust ventilation system causing air flow issues and damaging ducting, fans, and other system components. Natural gas usage of the new RTO shall be metered and integrated into the BEP Supervisory Control And Data Acquisition (SCADA) system. In 2025, the existing RTO underwent several upgrades including the installation of a new, modern control panel to address obsolete components and increasingly difficult troubleshooting. This project shall set the Western Currency Facility (WCF) up for success in providing operational redundancy alongside the newly overhauled RTO that is currently operating at the facility. The entire voe exhaust ventilation system shall feed into one of two RTOs (existing or new) with the capability to divert process flow from one RTO to the other in the event one RTO shuts down for any reason. This redundancy shall enable production to continue operating while the root cause of the issue is addressed.

As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Bureau of Engraving and Printing by email

Each morning we'll send the new solicitations and sources-sought notices from Bureau of Engraving and Printing, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy