1. Opportunities
  2. Department of Transportation
  3. Federal Highway Administration
  4. 69056727Q000005

Modular offices and restroom trailer lease, Vancouver WA

The Government wants a 22-month lease of one 24 by 60 foot modular office, two 8 by 40 foot office units and one three-station restroom trailer at its Vancouver, WA compound, with delivery, installation, weekly septic pumping and teardown.

Official title: Modular Buildings & Restroom Rental with Ancillary Services

Deadline
Dec 8, 2:00 PM PT
13 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
WA
Buyer: 690567 Western Federal Lands Div

What they're buying

Units are due by March 1, 2027, and the overall period runs February 1, 2027 to January 31, 2029.

Top catches

Lease is 22 months, not 24
“firm-fixed lease term of twenty-two (22) months” 69056727Q000005_Amend 0004.pdf, page 4

The unit lease runs 22 months, but the overall period is 24 months. The Government confirmed you should price 22 months of unit lease plus monthly maintenance. Build your price on that and plan for removal in January 2029.

Data pre-wiring may be dropped
“DATA AND TELECOMMUNICATIONS PRE-WIRING: The 24' x 60' building must include a dedicated utility closet to house a pre-wired, rack-mounted 48-port RJ- 45 Category 6 (Cat6) data patch panel.” 69056727Q000005_Amend 0004.pdf, page 8

Amendment 0003 says the data pre-wiring paragraph is eliminated, but the text shown still requires a 48-port patch panel and Cat6 drops. Ask the contracting office in writing whether it applies before you price it. Likely, not stated outright.

3 more catches below ↓

Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 10 of 11 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • One 24' x 60' modular office building (1,440 sq ft) with at least 3 offices, a small secure meeting room and 2 conference rooms, ADA compliant.
  • Two 8' x 40' single-wide office units with full HVAC (minimum 1.5-ton) and at least one exterior door each.
  • One 3-station restroom trailer, no older than 7 years, with a 150-gallon minimum freshwater tank.
  • Delivery on a commercial carrier (F.O.B. Destination), site leveling, block-and-level set, skirting, OSHA steps, ADA ramps and utility hookups.
  • Weekly septic pumping, freshwater refills, winterization help and preventive maintenance (Q&A says monthly).
  • Teardown and demobilization within 30 calendar days after lease end, with return freight at your cost.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Lease is 22 months, not 24. The unit lease runs 22 months, but the overall period is 24 months. The Government confirmed you should price 22 months of unit lease plus monthly maintenance. Build your price on that and plan for removal in January 2029.
  • Data pre-wiring may be dropped. Amendment 0003 says the data pre-wiring paragraph is eliminated, but the text shown still requires a 48-port patch panel and Cat6 drops. Ask the contracting office in writing whether it applies before you price it.
  • Site visit date has passed. The organized site visit was set for November 17, 2026, and has passed. Many answers defer placement, ramp, power and water details to the site visit. Ask the contracting office how to get that information before you price.“An organized site visit has been scheduled for Tuesday,” 69056727Q000005_Amend 0004.pdf, page 3
  • Email subject line has wrong number. The required subject line contains 69056726Q000042, a different number from this RFQ, 69056727Q000005. Q&A 5 called it a typo to be fixed, but the amended page still shows it. Confirm the exact subject line in writing before you send your quote.“69056726Q000042 PPQ for RFQ 69056727Q000005” 69056727Q000005_Amend 0001.pdf, page 5
  • Waste tank size is unclear. The waste tank minimum prints as 560520 to 600-gallon. A Q&A answer says a 520-gallon tank is acceptable if pumped weekly, but it is unclear whether Amendment 0004 includes that change. Get the minimum confirmed in writing before you price the trailer.“minimum 560520 to 600-gallon integrated waste septic holding tank” 69056727Q000005_Amend 0004.pdf, page 8

Key terms

Who can bidAny business: full and open, no set-asideNAICS 532490, size standard $40.0 million. Not limited to GSA Schedule holders (Q&A 6).Notice text
Contract period22-month lease; overall period Feb 1, 2027 to Jan 31, 2029Units ready by 01-MAR-2027. The Government confirmed you should price 22 months of lease.69056727Q000005_Amend 0004.pdf, page 4
How they chooseLowest evaluated price among acceptable quotesPrice, technical capability and past performance are all rated. The Government may accept other than the lowest offer.69056727Q000005_Amend 0001.pdf, page 6
How to submitEmail PDF files to WFL.Purchasing@dot.govHard copies are not accepted. The subject line needs a check (see catches).69056727Q000005_Amend 0001.pdf, page 4
Questions dueTuesday, December 1, 2026, 4:00 pm PTSend questions by email to WFL.Purchasing@dot.gov. The cover text is garbled; the date appears to have moved from November 19.69056727Q000005_Amend 0002.pdf, page 3
Contract typeFirm-fixed price task order for lease and servicesLease only. The contractor keeps title to the units (Q&A 4).69056727Q000005_Amend 0002.pdf, page 4
Site visitNot mandatory; the November 17 visit has passedQ&A 8 says there is no mandatory visit. FAR 52.237-1 applies, so not inspecting the site is no basis for a claim.69056727Q000005_Amend 0004.pdf, page 3

How to respond

  1. Email your quote as PDF files to WFL.Purchasing@dot.gov before 2:00 pm PT on Tuesday, December 8, 2026.
  2. Use a subject line that names RFQ 69056727Q000005, after confirming the exact wording with the contracting office.
  3. Send the full package. Partial quotes are not accepted. Include the completed SF 18 quote form (page A-1, with your UEI), the Representations and Certifications, your SAM.gov Reps and Certs FAR report, and acknowledgment of all amendments.
  4. Price the 22-month lease, installation, maintenance and teardown on the price schedule (B-1). That page is not in the text provided, so get it from SAM.gov.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated value: not stated. The Government cost estimate is not public.
  • Amendment 0005: several answers say details will come in it, but it is not in the attachment list. Ask whether it has been issued.
  • One linked file (a SAM.gov download, file ID e6050568f6874b7780eddaf483bff115) could not be read. You must read it on SAM.gov.
  • Standard work hours: the Q&A gives both 7:30am to 5:30pm and 7:30 AM to 4:30 PM. Confirm the work window.
  • Water: the Q&A says potable water is required, which may differ from what was said at the site visit. Confirm before you price the trailer water supply.
  • Several pages were not provided, including parts of Section D in amendments 0002 and 0004 and parts of the November 21 and November 24 Q&A. Ask for them if they affect your price.

Notice text

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR 12.201 Solicitation procedures. This announcement constitutes the only solicitation. Quotations are being requested and a written solicitation will not be issued. Solicitation number 69056727Q000005 is issued as an (RFQ) for Modular Buildings & Restroom Rental with Ancillary Services. This requirement is to support and maintain WFLHD operations during the Division Office Facility Renovation by obtaining prefabricated modular office building(s), single-wide container/modular office units, and an executive restroom trailer on a temporary lease basis, including professional delivery, site preparation, installation, utility connection, preventative maintenance, weekly septic pumping maintenance, technical troubleshooting support, and eventual teardown/demobilization.

Additional information as required in FAR 12.202(b)(1) is provided in the RFQ document attached herein. This acquisition is UNRESTRICTED FULL & OPEN and incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at https://www.acquisition.gov/faroverhaul/far-part-deviation-guide/far-overhaul-part-52. The North American Industry Classification System (NAICS) code is 532490 with an industry size standard of $40.0 million and the associated Product Service Code (PSC) is W054.

All interested vendors shall refer to Section E for full-text FAR Provision 52.212-1, Instructions to Offerors, and its Addendum.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 25, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Federal Highway Administration by email

Each morning we'll send the new solicitations and sources-sought notices from Federal Highway Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy