Lab floor epoxy recoating, USDA site in Wyndmoor, PA
Recoating about 2,700 square feet of epoxy floor and 450 linear feet of cove base in a second-floor lab at USDA's Eastern Regional Research Center.
Official title: MSB Lab Floor Coating Repairs
- Deadline
- Dec 1, 6:30 AM CT
- 7 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Glenside, PA
- Buyer: USDA Ars Afm Apd
What they're buying
Work runs 90 calendar days after notice to proceed, and the solicitation is set aside for small businesses.
Top catches
“Failure to attend the mandatory site visit will result in the quote being not eligible for award.” C04_Sol_124PCA27Q0008.pdf, page 20
The mandatory site visit was on 11/17/2026 and registration closed 11/16/2026. If you did not attend, the notice says your quote is not eligible, so ask the contracting officer in writing before you spend time on pricing.
“Competition is set aside for Total Small Business.” C04_Sol_124PCA27Q0008.pdf, page 1
The SAM record says the set-aside is not stated, but the solicitation says total small business only. Bid only if your company meets the small business size standard for NAICS 238330, and confirm with the contracting officer if you are unsure.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 7 of 9 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- About 2,700 square feet of floor in the MSB second-floor lab, plus about 450 linear feet of cove base.
- Prepare the existing floor and cove base, treat cracks and control and expansion joints, per manufacturer recommendations.
- Base coat of pure epoxy, then a chemical-resistant polyaspartic finish with a non-skid texture. Color is set at material submittal.
- Finish must meet BSL-2 lab sanitation and withstand washdown with chlorinated cleansers and disinfectants, per UFGS 09 67 23.14.
- Work Monday to Friday, 7:30 AM to 3:00 PM. Warranty of at least one year on material and labor.
- Floor drain locations per the amendment drawing. The RFI answer says nine 4-inch drains; the question said 12-inch.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Site visit may have passed. The mandatory site visit was on 11/17/2026 and registration closed 11/16/2026. If you did not attend, the notice says your quote is not eligible, so ask the contracting officer in writing before you spend time on pricing.
- Set-aside field conflicts. The SAM record says the set-aside is not stated, but the solicitation says total small business only. Bid only if your company meets the small business size standard for NAICS 238330, and confirm with the contracting officer if you are unsure.
- Award basis contradicts itself. The notice names both lowest priced technically acceptable and best value. Under either reading, price is likely to decide between acceptable offers, so price tight and meet every requirement.“Award will be made to the offeror representing the best value to the Government.” C04_Sol_124PCA27Q0008.pdf, page 18
- Two epoxy references required. You must give two recent epoxy flooring references, completed within five years, that match this job in size, scope and complexity. The prime contractor must hold the past performance, and weak references can make you unacceptable, so line them up before you bid.“Offerors shall provide at least two (2) references that demonstrate recent and relevant experience performing similar epoxy flooring projects” C04_Sol_124PCA27Q0008.pdf, page 18
- Bid bond rules conflict. The form says no bid guarantee is required, but the submission rules call for an SF 24 bid bond of 20 percent for offers of $35,000 or more. An RFI answer says a guarantee applies only above that threshold, and performance and payment bonds are required after award, so ask your surety before you bid.“A bid guarantee is required in an amount not less than 20 percent of the proposed price” C04_Sol_124PCA27Q0008.pdf, page 18
- Drain drawing may not match. The drain drawing appears to be a submittal for contract 1232SA26P0255 by a different contractor, not this solicitation. The RFI question says 12-inch drains, but the answer says nine 4-inch drains, so confirm which drawing and drain count govern before you price.“Advanced Logistic Partners, Inc.” C05_Drain Location Drawings.pdf, page 1
Key terms
| Who can bid | Small businesses only (total small business set-aside)The SAM record leaves the set-aside blank. You must have an active SAM.gov registration at closing.C04_Sol_124PCA27Q0008.pdf, page 1 |
|---|---|
| Contract period | 90 calendar days after notice to proceedStart within 10 calendar days of award. An older SOW file says 60 DAC, but SOW version 2 says 90 DAC.C04_Sol_124PCA27Q0008.pdf, page 3 |
| How they choose | Lowest priced technically acceptable (LPTA), though the notice also says best valuePrice decides among acceptable offers. Offers with deviations or alternatives are treated as non-compliant.C04_Sol_124PCA27Q0008.pdf, page 19 |
| How to submit | Email to david.reynolds2@usda.govSubject line: RFQ 124PCA27Q0008 and the project title.C04_Sol_124PCA27Q0008.pdf, page 18 |
| Questions due | Passed: November 19, 2026, 0900 AM Central TimeQuestions were due by email. The government answers in the RFI file are part of the solicitation.C04_Sol_124PCA27Q0008.pdf |
| Estimated value | $10,000 to $30,000 (government estimate)Estimate given in an RFI answer, not an award amount. It is below the $35,000 bond threshold.C05_RFIs and Responses to Solicitation 124PCA27Q0008.docx |
| Contract type | Firm fixed-price, single awardAward is all or none. The government may award no contract at all.C04_Sol_124PCA27Q0008.pdf, page 17 |
| Site visit | Mandatory; was 11/17/2026 at 10:00 AM EST (passed)Registration closed 11/16/26 at 12:00 PM EST. The prime contractor must attend.C04_Sol_124PCA27Q0008.pdf, page 17 |
How to respond
- Email your quote to david.reynolds2@usda.gov before 0630 local time on Tuesday, 12/01/2026. Put RFQ 124PCA27Q0008 and the project title in the subject line.
- Include a transmittal letter with your point of contact, phone, email, SAM UEI and tax ID number, plus a list of what you sent.
- Include a signed SF 1442 with your price for line item 0001 on page 3. List each amendment you acknowledge, including amendment 0002 dated 11/23/2026, and acknowledge amendment 0001 as well.
- Include two epoxy flooring references with project description, location, dollar value, contract dates and a contact who knows the project. Include any bid bond the form requires.
- Send early. The notice says it is your responsibility to make sure the government receives the quote by the deadline.
Attached files
From SAM.gov. Download links open the original files.
- C04_SOWv2.docxThe newer statement of work for the floor recoat, which you should read for scope and schedule. You do not sign it. Read.
- C04_Sol_124PCA27Q0008.pdfThe solicitation with the SF 1442 offer form and clauses. You must complete the offer page, sign it and return it. Read.
- C04_SOW.docxAn older statement of work that says 60 DAC. Read it only to compare with version 2; there is no form to fill in. Read.
- C04_Wage Determination.pdfDavis-Bacon wage rates for Montgomery County, PA. Read it to choose your labor classifications; there is no form to fill in. Read.
- C05_Drain Location Drawings.pdfA marked-up material submittal showing drain locations under a different contract number. Read it and confirm whether it applies to this solicitation. Read.
- C05_RFIs and Responses to Solicitation 124PCA27Q0008.docxQuestions and government answers that change scope, power, bonds and labor classes. Read all of it; it is part of the solicitation. Read.
- C04_Drawing.pdf Scanned image, not read.
- C05_Sol_124PCA27Q0008_Amd_0001.pdf Older version, not read.
- C05_Sol_124PCA27Q0008_Amd_0002.pdfAmendment 0002, which adds floor drain location drawings. You must acknowledge it on the SF 1442. Read.
Not stated in what we read
- Contents of amendment 0001 (C05_Sol_124PCA27Q0008_Amd_0001.pdf) and of the scanned floor plan C04_Drawing.pdf (Attachment 2). We could not review either, so you must read both.
- Which power rating applies: the RFI gives 60A at 208V three-phase in one answer and 30A in another.
- Which SOW governs completion time, 60 DAC (C04_SOW.docx) or 90 DAC (C04_SOWv2.docx).
- Who installs the nine floor drains, and whether the drain drawing applies to this contract.
- Which labor classification applies. The contractor selects it, and a conformance may be requested if no category fits.
- Whether a bidder who missed the mandatory site visit can still bid: Not stated.
Notice text
The purpose of this amendment is to provide drawings for floor drain locations. See attachments
As published on SAM.gov.
Contacts
- David Reynolds, david.reynolds2@usda.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 1, 6:30 AM CT7 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238330, flooring contractors, soonest deadline first.
- Department of Veterans AffairsCarpet to vinyl tile, Building 147, Temple, TX
- Department of the NavyCarpet replacement in Room C617, Naval Station Norfolk, VA
- Department of the Air ForceCarpet and cove replacement, Building 606, JBER, AK
- Department of Veterans AffairsTile and grout upkeep at Seattle and American Lake, WA
- US Coast GuardGalley flooring at Coast Guard station, Essexville, MI
- Department of the Air ForceFlooring removal and installation at Grand Forks AFB, ND
- Department of the ArmyFlooring work contract at Fort McCoy, WI
- Department of the NavyFlooring and repainting in a lab, China Lake, CA
Free · at most one email a morning
Get new notices from Agricultural Research Service by email
Each morning we'll send the new solicitations and sources-sought notices from Agricultural Research Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy